Ceiling Hoists: Let’s raise the requirements to the ceiling

Slides:



Advertisements
Similar presentations
ITIL: Service Transition
Advertisements

The Solid Wall Insulation Guarantee Agency Solid Wall Solutions: Focus on Quality Solid Wall Insulation Guarantee Agency Ecobuild 2 nd March 2010.
Eurotech Monitoring Services Ltd Eurotech Monitoring Services.
IT Technical Support Policies and Procedures South Nottingham College.
Patient Handling Equipment From Low Tech to High What to Consider Lynn LaSalle, MOT Ergonomist MultiCare Health System.
Technical Solutions Australia Innovative electronic Assistive Technology.
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Occupational Therapy Presentation by: Tanya Hammond, Occupational Therapist.
Computerised Maintenance Management Systems
Scaffolding Eric [Baaba Koro] & Pankaj & Ben Group
Rachel Weaver Program Manager Maryland Energy Administration
Managed by UT-Battelle for the Department of Energy Weatherization Assistant: What’s New in Versions 8.4 and 8.5 Mark Ternes Mike Gettings Oak Ridge National.
CLINICAL ENGINEERING part(3) Dr. Dalia H. Elkamchouchi.
Occupational Therapy Service Evaluation of the Effectiveness of Homelift Provision Within NHSCT Occupational Therapy Service Evaluation of the Effectiveness.
Referral History Tom is a 10 year old boy with Cerebral Palsy. He has spastic quadriplegia, which affects the control of movement throughout.
Home ownership in the UK for people with intellectual disabilities Ken Simons,Norah Fry Research Centre Based on report called ‘Pushing open the Door’.
What is it? Where do I find it? How is it helpful? Equipment Safety in Schools website.
By: Becky Guzie Chapter 5: Developing Adaptations to Promote Participation in Inclusive Environment.
Company Profile ► Our Expertise Here at SIEMSTECH we have a passion for designing and implementing integrated, network-centric technology solutions across.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
Construction Contracts and Project Delivery Methods
OH&S Plant Regulations make Good Business Sense Robert Enchelmaier Capability By Design Peter Kohler Robert Enchelmaier.
Health and Human Services Home & Community Based Waiver Medically Handicapped Children’s Program Disabled Children’s Program Disabled Persons and Family.
Members of Finland Parliamentary Delegation Policy Approaches into Housing in South Africa Presentation by the Department of Human Settlements.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Feed-in-Tariffs Explained What is it all about? 23 rd February 2011 Edward Leddy-Owen Regional Microgeneration Coordinator Energy Saving Trust advice centre.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
Housing Rehabilitation. Differences between minor repair, emergency rehab, and substantial rehab Utilizing proper funding sources for each construction.
Fatal Risk Working Group - Working at Height Martin White - Head of Birse Rail.
MARKETING & SALES CONS 7820 Professional Business Management COW 5.
Computerised Maintenance Management Systems
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Sprinkler Loads on Trusses
CCTV SECURITY & MONITORING SERVICES DAY SEVEN TECHNOLOGY CONSULT DSTC Monitoring Services Ltd DSTC.
SESSION 3 DEMENTIA. Umbrella term to describe number of progressive disorders which affect the brain  Alzheimer’s Disease  Vascular Dementia  Dementia.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
INFORMATION FOR CASE MANAGERS SHARED LIVING SERVICES.
Welcome Implementing Telecare In HFT. Assistive Technology Issues What is it? Assessment? Funding & Responsibilities? Installation & Maintenance? Disaster.
ITIL: Service Transition
A program of the Institute on Disabilities at Temple University
Monitoring and evaluation of disability-inclusive development
504 Home Repair and Rehab Loans and Grants & 502 Direct Loan Program.
Software Development Life Cycle Waterfall Model
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
OH&S Plant Obligations make
Global expertise Local experience Africa’s best
State System Office.
HOW BEST CAN WE MANAGE MEDICAL EQUIPMENT By Khalif D.Mohamud BMET-GCRH
Job roles for the children's shoe brief
Grab Rails: Ensuring a Simple Home Mod Doesn’t Go Wrong!
Quality Healthcare for Everyone
Home Support Through Simple Technology
Business System Development
World Health Organization
MOD.A’s Quality Standard
Conformity Assessment in the Public Procurement of Accessible ICT
North of Tyne Community Led Local Development
Loan and Grant Programs Texas State Affordable Housing
NATIONAL LEADER IN TESTING, INSPECTION AND CERTIFICATION
Contractor management at Sasol Mining
Sport and Recreation Infrastructure Programme
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Contractor management at Sasol Mining
Structural Audits PREPARED BY: ROBIN RHYS DATE: 04/04/2019
Software Testing Lifecycle Practice
Eagle Technology Proteus MMX
Working with People with Physical Disabilities
Presentation transcript:

Ceiling Hoists: Let’s raise the requirements to the ceiling Agnieszka Kuna, Manager Specialist Equipment Services Lisa-Marie Arthur and Matthew Massy-Westropp Domiciliary Equipment Service Department for Communities and Social Inclusion

Provision of ceiling hoists Changing trends DES Provision of ceiling hoists Changing trends Risks – client, user, funder Equipment vs Home Modification Review of practice Considerations Cartoon from www.usatipsonline.com

What is DES? SA government provider since 1996 of: Equipment - readily available and customised Equipment repairs, maintenance and modifications Home modifications - simple to complex Clinical support and technical expertise Centralised warehouse and procurement Focuses on refurbishment of 50,000 loan items = responsive and more efficient

Ceiling hoists What and why? Mobile vs ceiling Gantry vs fixed tracking Portable vs fixed motor Advantages and disadvantages

Ceiling hoist considerations Person Assistive technology Environment

Ceiling hoist considerations Person Person with a disability – functional capacity, prognosis Care giver providing assistance – consideration of ‘work’ environment Environment (for installation) Private home vs Work setting Construction requirements and standards Physical limitations and space Ownership of property Assistive technology & Funding Specifications of item Policy of the funder

Context in SA Funding Specific eligibility criteria Numbers of hoists vs ceiling hoist (provide percentage) Installation Installed by ceiling hoist suppliers Equipment item But is it?

So what triggered a review? http://activerain.com/blogsview/3573368/funny-friday-s-tgiff-call-it-what-you-like-there-s-a-hole-in-the-roof

Changing trends Reforms Reforms in both ageing and disability Funding changes – where equipment impacts care hours. Ability to evaluate life-cycle costs and whole of life costs and effectiveness of items Environmental House and room size Impact on manual tasks for care givers New technology changing functionality of slings and tracking

Risks Incidents – related to tracking, straps or use Product failure – maintenance schedule and responsibility Construction – asbestos, termites, roof trusses and loading Costs associated with re-positioning due to changed needs

Roof trusses and New home construction In 2002 sections of the prefabricated timber roof truss frame at the Riverside Golf Club, in South Australia, collapsed (Raising the roof: a guide to roof truss safety) Prefabricated trusses are used extensively in the building industry It cannot be assumed that roof trusses are capable of supporting additional loads after manufacture Without engineering checks, could lead to failure cartoon – renewableenergyworld.com

Is this assistive technology an equipment item or a home modification? What about other items: Bidet (with the required RPZ devices) Electronic door openers

Other considerations Responsibility – for ensuring correct installation, ongoing review, programmed maintenance, building structure remains intact, training in use Property Ownership and consent – to install ceiling hoist Legislation – NCC and AS Work environment (work health safety) Quality service Installation and by whom Engineering checks

What have we done and what do we plan to do? Specification forms with sign off from home owner Engineer sign-off Process in place Admin support dedicated to overseeing these Panel of providers Comparison chart & clinical considerations Programmed maintenance

Thank You! Phone: 1300 295 786 Repairs: 1300 130 302 Email: des.frontdesk@sa.gov.au Catalogue: www.des.domcare.sa.gov.au Web: www.des.sa.gov.au