DISTRICT 1 ADVERTISED PROJECTS

Slides:



Advertisements
Similar presentations
Jon Chiglo, PE Project Director 2014 Construction Plans.
Advertisements

DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
Capital Improvement Program City of Warren, Ohio April 2012.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
November 14, 2014 District Construction Season.
Welcome.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
November 20, 2013 District Construction Season.
Nick Johnson, PE Senior Project Manager October 1, 2012.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
District Five Upcoming Projects. Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
PennDOT District 11 March 4, 2016 Cheryl Moon-Sirianni, P.E. Assistant District Executive Design Division H. Daniel Cessna, P.E. District Executive.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Arizona Forward Update
VDOT’s Operations Program Opportunities May 20, 2016
SR 2108-A13 – Forbes Avenue Corridor Improvements
Chapin Town Hall Meeting
Capital Project Needs Assessment
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
District 3 Complete Streets Projects
Infrastructure Investment Needs
Dave Kuhn Assistant Commissioner
Kerr Tar Project Update – June 2016
IA 122 RECONSTRUCTION PRE-BID MEETING
Citrus Park Drive Extension
Transportation Projects
Chipman Cultural Center Salisbury, MD Wicomico County
Welcome.
Hillsborough County Initiatives to Address School Safety
Communication Plans, Goals and Issues in 2016
projects update ATLANTA district
District Construction Season
Contract 60X10 Informational Meeting Weber I-55
Pavement Improvement Plan 2009
District Five Upcoming Projects
General Manager’s Recommended Budget FY 19/20
Commissioners Presentation
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
2019 Construction Season Preview
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

DISTRICT 1 ADVERTISED PROJECTS DORCHESTER No Contract No. Description Type of Work Ad Date Bid Date 1 DO3485129 Maintenance Facility at Cambridge Facilities Improvement 1/14/14 6/23/14 2 DO2995177 US 50 – Chateau Road to Linkwood Drive Resurface 5/13/14 6/9/14 WICOMICO WI4325129 Salisbury Shop – HVAC Upgrades Facilities Improvements 11/19/13 1/9/14 WI3285674 US 13 Bus. – N. of South Blvd. to US 50 (Phase 6) Drainage Improvement 12/10/13 1/16/14 3 WI3835130 MD 349 at Crooked Oak Lane Geometric Improvements 4 WI2205177 US 50 – Old railroad Road to East of Rockawalkin Road 8/26/14 10/2/2014 WORCESTER WO3295280 Small Structure 23021XO over Double Bridge Branch Bridge Replacement 12/17/13 2/11/14 WO3295380 Small Structure 23041XO over Bunting Branch 1/23/14 AREAWIDE AW0755180 10 Existing Bridges on US 13, MD 353, MD 12, and US 113 Clean/Paint Bridges 10/15/13 11/21/13 XY2395385 At Various Locations in District 1 & 2 Lighting 12/3/13 XY1575176 Pavement Markings 2/20/14

DISTRICT 1 UPCOMING PROJECTS WICOMICO No Contract No. Description Type of Work Ad Date 1 WI2335130 US 13 Bus. at South Division Street Geometric Improvements Anticipated Spring 2014 WORCESTER 2 WO2005176 MD 378 – 9th Street to 15th Street Pedestrian Bump-outs Anticipated Summer 2014 AREA WIDE XY4095177 Dorchester County Areawide Resurfacing Resurface XY4195177 Somerset County Areawide Resurfacing 3 XY4225177 Wicomico County Areawide Resurfacing 4 XY4235177 Worcester County Areawide Resurfacing