CR GR HSE 501 – HSE Requirements for Contractors

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Background Presenters Work done in preparation for WHS changes
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
ISO 9001 : 2000.
Professional Behaviour
OHSAS
Contractor Safety Management
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
ISO 9001 Interpretation : Exclusions
FPSC Safety, LLC ISO AUDIT.
Safety and Health Programs
4. Quality Management System (QMS)
Risk Assessment – An Essential Standard
BRC Food Safety Quality Management System Training Guide
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
1 Borouge reference line 2006 © 2006 Borouge HSE MANAGEMENT OF CONTRACTORS By: Venkatesh Murthy Abu Dhabi Polymers Company LLC (Borouge), Abu Dhabi.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Company’s short presentation. General presentation We offer a complete package of professional Occupational Health and Safety services; We hold the certification.
Introduction to ISO New and modified requirements.
Ship Recycling Facility Management System IMO Guideline A.962
Occupational Health and Safety
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Company duties under the ISM Code
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Visit us at E mail: Tele:
Compliance and Ethics Training Overview
10/16/2015 Roles and Responsibilities of Principal Investigators/ Program Directors/ Project Directors.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
4.3 Document control 4.4 Review of requests, tenders and contracts
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
TC176/IAF ISO 9001:2000 Auditing Practices Group.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
Quality Management: Mutually beneficial supplier relationships.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
UNDERSTANDING ISO 9001:2008.
ISO/IEC
National Contact Points (NCP) Training
Temporary Works Co-ordination
HSE Case: Risk Based Approach.
Quality Management Systems – Requirements
Internal control - the IA perspective
General Contract Management Structure
General Contract Management Structure
CR GR HSE 001 On-MAESTRO HSE Expectations
General Contract Management Structure
Aerodrome Certification Workshop
CR-GR-HSE-425 HSE Requirements for work at height
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
CR-GR-HSE-412 Stakeholder and Local Impact Assessment
CR-GR-HSE-405 Industrial hygiene
CR-GR-HSE-801 Management of HSE Events and Return on Experience
CR-GR-HSE-302 Management of change
CR-GR-HSE-419 Safety of excavation works
CR GR HSE 501 – HSE Requirements for Contractors
Road Vehicle Driving Safety GROUP HSE RULE (CR-GR-HSE-404)
CR GR HSE 001 On-MAESTRO HSE Expectations
Stakeholder and Local Impact Assessment GROUP HSE RULE (CR-GR-HSE-412)
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Work at Height GROUP HSE RULE (CR-GR-HSE-425)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Safety of Aviation Activities REGLE HSE GROUPE (CR-GR-HSE-415)
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
CR-GR-HSE-404 : Road Vehicle Driving Safety
Presentation transcript:

CR GR HSE 501 – HSE Requirements for Contractors

HSE Requirements for Contractors Replaces existing Group & branches rules and defines 21 requirements HSE requirements for: Planning and Contract Preparation Selection of Contractors HSE management during mobilization, execution and demobilization Closeout and performance evaluation Contractor process monitoring and HSE performance improvment Takes into account requirements from G70 – Zero fatality WG including: New personnel (< 6 months in the business or on site) Observation of high risk tasks Actions in the event of fatal accident Requirements adjusted according to the level of the HSE risk for the activity to be contracted (high, medium, low) and the type of contractual relationship (similar with IOGP 423 – e.g Mode 1: work in refinery, FPSO / Mode 2: drilling rig, closed construction site / Mode 3: construction yard). Compatible with Purchasing process. Does not apply to maritime, river and air transport services. Applies to any new contract or renewal. Effective date: within 6 months following publication Group Dir Sec 5 MS CR MS HSEQ 204 RC CR RC HSE 133 & 149 EP CR EP HSE 071 GRP CR GP HSE 070 The rule does not concern: - The purchase of goods, equipment or materials manufactured or maintained outside the sites of the Group's operated domain; - Financial or administrative services (such as banking, postal services, courier services, translation); - Intellectual services (consulting / studies with staff not exposed to industrial risks) - Transportation services by taxi and mailing services; - Maritime, river and air transport services, which are already covered by directives: Mode 1 : common one, works on site (maintenance, modifications of equipments, construction in site…) Mode 2 : Drilling Rig typical case or closed construction site (fenced). The work is done by a company with its device and it applies the rules of its own HSE management system. There is a need for a bridging document to ensure the compatibility of the HSE management system of the entity and that of the contractor. Mode 3 : construction yard typical case, spot transport or maintenance in client site for Lampiris or MS.

Rule structure : 4 phase process and monitoring Monitoring applies to all actors in the process, including EE

Preparation – Contractors qualification CR GR HSE 501 HSE Requirements for Contractors Preparation – Contractors qualification Minimum HSE criteria (Requirement 3.2.1) Written commitment from the contractor to comply with all applicable local regulations and entity/affiliate HSE rules Commitment from the contractor to provide competent and qualified personnel For all high risk activities, a conformity inspection of the contractor is conducted. Will not be necessary if the contractor has a recognized certification of its HSE management system Modifications: Already exists in RC, MS, and GRP Company Rules EP Company Rule only considers prior HSE performance. These criteria are detailled in GM-EP-HSE-071 Tracking and updating of contractors’ HSE qualification (Requirement 3.2.2) Contractors HSE information is regularly updated (using the feedback following executed services) and a mechanism is in place to suspend/withdrawal from the list of qualified contractors in the event of breach of applicable HSE laws and/or regulations or the defined HSE contractual obligations. Modifications: Already exists in branch Company Rules and connected to TGP Sequana project (suppliers data base) ICC of MS answers to 3.2.1

Preparation – Scope definition and decision to contract CR GR HSE 501 HSE Requirements for Contractors Preparation – Scope definition and decision to contract HSE competency of the Technical Representative (Requirement 3.2.3) Appointement of a Technical Representative with HSE competencies (including this rule, technical competence, general and specific HSE training) Modifications: Already exists in previous EP and RC Company Rules New for MS and GRP because previous Company Rules did not specify. No major impact as the requirements are already in practice Preliminary assessment of HSE risks (Requirement 3.2.4) and HSE contractual mode selection (Requirement 3.2.5) classification of the contracted works according to three levels of risk (High, Medium, Low) 3 contractual modes Mode 1 : Work on Total sites Mode 2 : Work dones using the HSE MS of the contractor + bridging document (eg. Drilling Rig, closed construction site, etc.) Mode 3 : Construction yards, transport, client intervention Modifications: Preliminary assessment of HSE risks already exists in previous branches rules Contractual mode is new for all branches (based on IOGP 423) Mode 1 : common one, works on site (maintenance, modifications of equipments, construction in site…) Mode 2 : Drilling Rig typical case or closed construction site (fenced). The work is done by a company with its device and it applies the rules of its own HSE management system. There is a need for a bridging document to ensure the compatibility of the HSE management system of the entity and that of the contractor. Mode 3 : construction yard typical case, spot transport or maintenance in client site for Lampiris or MS.

CR GR HSE 501 HSE Requirements for Contractors Selection of contractors Pre-selection of contractors (Requirement 3.3.1) Contractors are pre-selected from a database of qualified contractors including: The ability to safely perform the contracted activities while limiting as far as possible the number of sub-contractors The ability to control risks associated with contracted activities (prior HSE performance) The ability to respond to specific HSE criteria if applicable Modifications: Already exists in previous branches Company Rules Preparation of call for tenders and contractual HSE clauses Preparation of call for tenders (Requirement 3.3.2) The entity provides any relevant HSE information to contractors Competent HSE resources from the entity are sufficient to assure the transcription of the general and specific HSE requirements HSE evaluation criteria are defined and communicated to the contractors HSE performance objectives and indicators are defined and communicated to the contractors Modifications: Already exists in previous branches Company Rules

Preparation of call for tenders and contractual HSE clauses CR GR HSE 501 HSE Requirements for Contractors Preparation of call for tenders and contractual HSE clauses Minimum HSE contractual clauses (Requirements 3.3.3 and 3.3.4) The obligation to specify, based on HSE criteria, the part or parts of the service that cannot be subcontracted The contractor obligation to declare all the subcontractors it intends to use, and the nature and extent of the services that will be subcontracted to them The possibility for the entity or affiliate to refuse subcontractors proposed by the contractor on the basis of HSE criteria The obligation to inform the entity of the presence of new personnel (<6 months in the business or on site) and to have an HSE support plan Stricter requirements for services with medium and high risks in mode 1 (Golden Rules training, medical fitness certificates, HSE qualifications/certifications, HSE plan, and safety observations) The obligation to comply with applicable HSE laws and regulations The conditions where the entity or affiliate to suspend or terminate the contract Communicatione on HSE performance of contractors Conduction of safety observations Modifications: Limitation of the subcontracting, based on the nature of the activity (and not based on the number of levels : CR MS 1 level with particular conditions, CR EP 2 levels, CR GRP 1 level, CR RC « limitation of the number of level ») Induction program for newcomers/new arrivals Safety observations principle in line with G70 – Zero fatality WG requirements

Preparation of call for tenders and contractual HSE clauses CR GR HSE 501 HSE Requirements for Contractors Preparation of call for tenders and contractual HSE clauses HSE evaluation of tenders (Requirement 3.3.6.) HSE evaluation of tenders is required for services with medium and high risks The HSE proposals are objectively evaluated against the previously established HSE selection criteria During the tenders evaluation, two lists of contractors are established distinguishing between the "capable contractors" that fully meet the HSE selection criteria, and the "potentially capable contractors" that partially meet the selection criteria (corrective or compensatory measures are defined and evaluated). Contractors unable to meet HSE selection criteria cannot continue on to other stages of the tender. Modifications Already exists in previous branches Company Rules

CR GR HSE 501 HSE Requirements for Contractors Execution HSE plan, kick-off meeting, premobilization, mobilization (Requirements 3.4.1., 3.4.2. and 3.4.3.) An HSE plan adapted to the risk level, is prepared jointly with the contractor For services with medium and high risks, a kick-off meeting is organized, actions are realised for premobilization and mobilization Modifications: Kick-off meeting : new for RC and MS (but already done in prevention plan) Premobilization, mobilization : new term for RC HSE monitoring during execution and reporting (Requirements 3.4.4. and 3.4.5) The effective implementation of the HSE plan is verified Detection of any changes HSE performance monitoring and completion of the safety observations and which results are to be communicated to the entity Modifications: Already exists in previous branches Company Rules

CR GR HSE 501 HSE Requirements for Contractors Execution Provisions in the event of a fatal work related accident (Requirement 3.4.6) In the event of a fatal accident, top management of the contractor contacts the entity or affiliate general manager and a Codir member of the relevant branch, presents the analysis of the accident and the actions identified aimed at avoiding recurrence Modifications: Clarification for all branches Joint HSE reviews (Requirement 3.4.7) For services with medium and high risks, joint HSE reviews between the entity or affiliate and the contractor are performed at regular intervals Modifications: Formalisation of existing reviews

Close Out and Performance Evaluation CR GR HSE 501 HSE Requirements for Contractors Close Out and Performance Evaluation Provisions at the end of the services (Requirements 3.5.1 and 3.5.2) At the completion of the activities (high and medium risks) the overall HSE evaluation is carried out There is no degradation to the level of risk management during demobilization of contractor’s staff and equipment At the end of the performance of the contracted service, a local report on the HSE performance of the contractor is drawn up covering all the contractual phases Modifications: Already exists in previous branches Company Rules HSE Performance Monitoring and Improvement (Requirement 3.6.1) Follow-up and monitoring of contractors HSE performance is ensured in order to drive improvement A Safety Contract Owner is designated by the entity (CODIR member) to establish/maintain a high-level dialogue with the contractors’ management of the most important contracts (between 3 and 10 safety contract owners, depending on man- hours of all contractors) Modifications: Safety Contract Owners and recognition for stand-out HSE performance of contractor companies are integrated in this Company Rule (safety challenge, awards…)