Presented by Caroline Merz ETM 528 Monday, April 16th 2018

Slides:



Advertisements
Similar presentations
5S Workplace CI Department, Supply Cabinet March 2009.
Advertisements

5S training Office Environments.
Greater Cincinnati Lean Improvement Consortium 6S Contest March-April 2013 Name of Team:
5S BASIC TRAINING What is 5S and why do we want to do it?
Receiving Getting Choosing Timing Buying Selecting Selecting the right quality Buying the right quantity Timing your purchases Choosing the right vendors.
Pull and Kanban in SAP.
How to find $650,000 in materials savings. ResultsLab, Inc ©20132 Step One – Define the Problem A client of ours said that needed to cut $650,000 out.
Unit 1. Lab Safety video I TO PREVENT: __________________________________________ __________________________________________ exposure to __________________________________________.
Introduction to 6S.
Beni Asllani University of Tennessee at Chattanooga
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
Chapter 4 5S.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
JIT and Lean Operations
Visual Management – an Overview. What is Visual Management? Visual Management is a set of techniques for creating a workplace embracing visual communication.
A Workplace Organization Method
Safety, Health & Environment
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Visual Management Quick Review
POUS Point Of Use Storage. Agenda POUS AGENDA »Introduction and definition Agenda | »Why / Benefits »Examples »When to Use, Not to Use »How to Implement.
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
Chapter 29 Waste Elimination. Objectives Select and apply techniques for eliminating or preventing waste. Pull systems, Kanban, 5S, standard work, & poka.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Chapter 11 Managing Inventory throughout the Supply Chain
Visual Management Visual Management.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
Chapter 4 Inventory Management. INVENTORY MANAGEMENT Stockpile of the product, a firm is offering for sale and the components that make up the product.
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
Storage of Health Commodities Supply Chain Management.
5S WORKPLACE IMPROVEMENT Central Stores & Freight Room.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
HOUSE KEEPING A base for any improvement u Even before you plan the direction you need to take, you must remove any obstacles to get a clear view of the.
Business for Health Business Skills for Private Medical Practices
CHAPTER 9 Lean Manufacturing.
JIT/Lean Production Chapter 13.
Chapter 12 Lean Production. Chapter 12 Lean Production.
5S workplace organisation
Lean operations and JIT
RFID enabled Solutions
Module 2: Supply Chain & Logistics Management
Inputs and Outputs to Aggregate Production Planning
Chapter 4 Inventory Management.
5S BASIC TRAINING What is 5S and why do we want to do it?
Clinical engineering Lecture (7).
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
HOUSEKEEPING & 5 “S”.
FIVE S’s SCORING Date_________ Cumulative Improvements
Prepared By: Suman Kumar Singh
Just-In-Time and Lean Production
Presented by Andrew Hudson Mercer University School of Engineering
Operations Control Objectives Identify four types of operating costs
5S TRAINING.
Continuous Improvement Coordinator
Industrial Engineering Department, Dokuz Eylul University, Turkey
Just-In-Time and Lean Production
5S BASIC TRAINING What is 5S and why do we want to do it?
5 S.
Kanban for Inventory Management
Presented by Janea Spillers Mechanical Engineering Student
SCM 494 Dr. Ron Tibben-Lembke
5S BASIC TRAINING What is 5S and why do we want to do it?
Workplace Organization
July 2019 Safety Focus Extra
5 functions of the 5S Methodology Example of the 5s Methodology
Presentation transcript:

Presented by Caroline Merz ETM 528 Monday, April 16th 2018 Lean Hospitals: Improving Quality, Patient Safety, and Employee Engagement Ch. 6 Lean Methods: Visual Management, 5S, and Kanban Presented by Caroline Merz ETM 528 Monday, April 16th 2018

Introduction “Many organizations have old habits of ignoring, hiding, or covering up problems” (Lean Hospitals, pg 121) This results in “information deficits” that cause misunderstandings and waste of time and money The lean methods discussed in this chapter include: Visual Management 5S method Kanban method These methods seek to reduce workplace waste (time, money, energy expenditure) and improve workplace understanding and organization

Visual Management Mindset: How can we make the process more visual and problems more apparent? Goal: Make problems or status visible Manage the situations, reacting as needed for the short term as well as solving root causes of the problems for the long term If successful: reduces workplace stress, improves patient care, reduces time and money waste

Examples of Visual Management Is: Differently colored flags outside patients’ door to indicate the status of the patient Is not: Performance measures or warning signs from “Visual Management in your Car” (2012), Christian Paulson, retrieved from https://christianpaulsen62.wordpress.com/2012/01/03/5-visual-management/ from “Control The Last Planner System Using Visual Management” (2016), Algan Tezel; retrieved from http://leanconstructionblog.com/Control-The-Last-Planner-System-Using-Visual-Management.html retrieved from http://sf.co.ua/id140897

5S Method What is it? Method of waste reduction through improved workplace organization and visual management Five phases: Sort Store Shine Standardize Sustain Retrieved from http://designdininganddiapers.com/2013/01/new-pantry-organization/

First S: Sort What is it? Sorting through and getting rid of materials that are no longer needed Ex: expired reagents, broken computers/keyboards Why is it necessary? Unneeded items take up space, making a department larger than it needs to be and increases construction and maintenance costs Questionable items that might be needed? → Solution: Buffer zone/5S sort area Items stored for a week to allow everyone to review the items to be thrown away Prevents rash decision-making and waste of disposing items that would need to be repurchased

Second S: Store What is it? Storing items most frequently used closest to their point of use Why is it necessary? Reduces waste of employee motion and time Materials used in multiple areas/departments? → Solution: Multiple storage points if the materials are inexpensive and take up little space. Ex: latex gloves from Lean Hospitals (2016), Mark Graban, pg 127

Third S: Shine What is it? People who work in a department take responsibility for keeping their area clean (aside from major cleaning done by centralized housekeeping) Why is it necessary? Cleanliness affects patients’ experience and perception of a hospital Helps keep area safe and allows for easier detection of environmental/equipment problems

Fourth S: Standardize What is it? Ensuring that items are always kept in defined locations Why is it necessary? Reduces time wasted looking for items **Standardize things that matter** Ex: Printer vs medication cart drawer retrieved from http://www.newmaticmedical.com/carts/p/MedicationDrawerTrays/ retrieved from https://www.techradar.com/how-to/computing-components/printers- and-scanners/how-to-choose-an-office-printer-1301630

Fifth S: Sustain What is it? A plan for sustaining and continually improving workplace organization Ex: scheduled audits so supervisors/leaders can ensure standards are being followed Why is it necessary? To prevent S5 organization from being a one-time event or a repeated annual event

Kanban kanban = “signal,” “card,” or “sign” What is it? A method of managing materials through the use of physical signals, paper cards, or plastic bins that indicate when it is time to order more, from whom, and in what quantity Con: Can require significant time investment initially Pro: Prevents both stock-outs and over-ordering; Saves time, effort, and money in the long-term

Problems with Traditional Materials Systems Standing Orders Vendors send a predetermined amount of materials each period (weekly, monthly, quarterly) Pro: Materials arrive automatically Con: Does not adapt to changes in material usage Par Levels Items are replenished only in the quantities in which they are being used Pro: Advance over standing orders Con: Each individual item must be counted every time restocking occurs Electronic Inventory Cabinets Staff members press a button each time they remove an item from the supply cabinet Pro: Easier restocking Con: Forgetting to press the button or the button not properly registering causes the inventory count to be higher than what it actually is; and only one person can use the cabinet at a time

Using Kanban to Replenish Supplies Kanban cards Card is placed with supply Should include info such as when to reorder, reorder quantity, and supplier information Two bin system Visual way of managing inventory When one bin is empty, it is time to order more Retrieved from https://www.slideshare.net/KarenMartinGroup/kanban-overview2/ 14-TwoBin_System_BarCoded_No_CardRed Retrieved from http://www.leantoolset.com/kanban/

Lean Lessons (page 147) Visual management helps expose problems and avoid miscommunications and waste. 5S reduces waste through improved organization and visual methods. 5S is not a one-time event - it is a plan to be sustained to maintain and improve workplace organization. Supplies and items that are used most frequently should be kept closest to the point of use Hiding the mess behind cabinet doors does not fix the root cause of the disorganization problem.

Lean Lessons cont’d (pg 147) Kanban can be implemented using cards, plastic bins, or electronic signals. Kanban requires much less counting and time than par levels. With materials, we need to view trade-offs between the cost of inventory and the cost of running out. Hospitals might need to err on the side of not running out. When we have more variation in the system, we need more safety stock to protect us.

References Graban, M. (2016). Lean hospitals: Improving quality, patient safety, and employee engagement(3rd ed.). Boca Raton: Taylor & Francis.