Ball-Tech Energy Ltd. Present the BallTechnic® System

Slides:



Advertisements
Similar presentations
ACTIVE LEARNING PROCESS
Advertisements

Filtersorb SP3 & Scale Prevention
Energy-Efficient Process Cooling
Power Plant Engineering
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
KAUSAR AHMAD KULLIYYAH OF PHARMACY PHM3133 Dosage Design /11 1 Steam as a heating medium
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Ottawa Microturbine Application Workshop jan Return of Experience for Microturbines Running on Landfill Gas // waste water gas in Europe
Mining Technologies International Hy-Drive Hydrogen Generating System Hydrogen Generating System.
HEAT EXCHANGER GUIDED BY: PREPARED BY:
REFRIGERATION Refrigeration may be defined as the process of removing heat from a substance under controlled conditions and reducing and maintaining the.
HEATING AIR © Commonwealth of Australia 2010 | Licensed under AEShareNet Share and Return licence.
TYPES OF MECHANICAL SYSTEMS
Moisture to water converter. Out Line : Abstract Introduction Heat Pump Heat Pump Components Conclusion.
Basic Refrigeration Cycle
STEAM TRAPS.
HVAC System Design PES Institute of Technology. Objective Goal: To develop an automotive air-conditioning system that is smaller and lighter than with.
Cold-Plus™ Refrigerant Enhancer
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
HEAT TRANSFER & HEAT EXCHANGERS CHBE 446 – Group5 Stephan Donfack Benjamin Harbor Nguyen Huynh Cyndi Mbaguim.
Bereichskennung oder Produktname Process Instrumentation and Analytics Januar, 2003 Folie 1 A&D PI2 SE1 Siemens Process Analytics in the Cement Industry.
PROJECT PRESENTATION REFRIGERATION USING WASTE HEAT IN CARS
COMMERCIAL REFRIGERATION
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
POWER CONTROL LIMITED Introducing “PermaFrost” Presented by Ir. K.M. Wong.
Cold-Plus™ Refrigerant Enhancer
Cold-Plus™ by TRIFECTA DISTRIBUTORS LLC
Introduction to Heat Exchangers
STEAM HEATING.
Water piping design.
HEAT EXCHANGER.
Hawke’s Bay Refrigeration
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
Heat Transfer Equations For “thin walled” tubes, A i = A o.
NOVO ETS IMPROVING YOUR ORGANIZATIONS’ ENVIRONMENTAL, HEALTH AND SAFETY PERFORMANCE ENERGY MANAGEMENT IN THE CONTEXT OF GREEN PRODUCTIVITY.
Presentation Dungrani rakesh v. Div : a Branch : mechenical Sem : 1 st.
5.3 Essential Questions What are the first and second laws of thermodynamics? How does an internal combustion engine work? How does a refrigerator work?
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
ROAD TO CLIMATE FRIENDLY CHILLERS Hydrocarbons & Absorption Chillers Systems: Development & Potential Dr. Alaa Olama Sept. 2010, Cairo, Egypt.
BCWC Water-cooled water chillers with centrifugal compressor/s
Solar Heating/Cooling/Dehumidifier Systems
ELECTRICITY COST OF CHILLER AND COOLING TOWER PUMPS KILLING YOU? We Have The RIGHT Solution just for YOU! + =
Heat Transfer Equations For “thin walled” tubes, A i = A o.
By: Jim Kibby Fouling and ROI Tools (Return On Investment)
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
Using Heat Part 2. Science Journal Entry 32 Explain the advantages and disadvantages of thermal expansion.
Presentation Title Presented by Joe Blow Heat Transfer 101 & ROI.
Air condition installation
Advanced Chemical Technology, Inc.
FilterSorb SP3 Removal of Scales: Part V -by Deepak Chopra.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Refrigeration & air conditioning
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
. Level 3 Air Conditioning Inspections for Buildings
Case sample of a CT option
Conservation of Mass and Energy
Lecture Objectives: Continue with Sorption Cooling
AUTOMATIC ON-LINE BRUSHING FOR HEAT EXCHANGERS AND CONDENSERS
Cooling technology Main components and equipments
Desuperheater Heat Transfer Device Manufactured by Maniks
Process Equipment Design and Heuristics – Heat Exchangers
Recirculating CO2 System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Air Conditioning System-1
Presentation transcript:

Ball-Tech Energy Ltd. Present the BallTechnic® System Air Conditioning and Industrial Heat Exchangers Cleaning Systems   Products line Prese. Ball Tech Energy Ltd.

Ball-Tech Energy Ltd. ·. Established in 1989 as an R&D company. ·‏ Ball-Tech Energy Ltd. · Established in 1989 as an R&D company. ·‏ Reorganized in 1994 with new investment and management.specializes in the field of water treatment. · Main product line The BallTechnic System. Patented throughout the world. ·‏ Installed in air conditioning or industrial water piping. Keep heat exchanger tubes permanently clean. ·‏ Enables heat exchanger nonstop operation at its optimum design condition. ·‏ Over 1700 Installations in Israel, Italy, France, Mexico, S. Africa Thailand, India, Malaysia, Singapore, China, Hong Kong and the Philippines Located in the modern Industrial Park in Rosh Ha’ain, Israel.

A total solution for Air-Con A total solution for Air-Con.& Industrial cooling system’s Scale Fouling and its Environmental problems.

Keeping Air Conditioning Systems in Full Capacity & Efficiency The Problem Keeping Air Conditioning Systems in Full Capacity & Efficiency The Solution Keeping the Heat Exchanger Tubes Always Clean

Central Air-conditioning System -Block Diagram COOLING WATER CYCLE COOLANT CYCLE CHILLED WATER CYCLE COOLING TOWER CONDENSER / HEAT EXCHANGER 6 º C 10 25 FAN COILS COMPRESSOR Make Up Water 2-2.5% Evaporating Loss 1-1.5% Blow down water 1% 1T.R =3 G.P.M EVAPORATOR 30 º C EXPANSION VALVE 1Kw / h = 1T.R (Piston) 0.8Kw / h = 1T.R (Cent) COMPLETE COOLING CYCLE

The Problem Cooling capacity of The majority of medium to large central air conditioning systems are designed around a re-circulating open water cooling systems. Water flow in the tubes of Shell & Tube heat exchanger and remove the heat from the coolant gas. Water contains low solubility salts and sediments that deposit and build a stony scale on the inner tubes surfaces, causing fouling of the heat exchanger unit. Fouling of the heat exchanger unit is causing reduction of the Air Conditioning C.O.P ·1mm of scale can be deposited in 2000 hours of operation. ·1mm scale reduces the the system by 45%

What is Causing Fouling? Why? How Fast ? Water contain minerals of Magnesium and Calcium that tend to deposit on hot surfaces. Scale, fouling sediments can be found after 100-200 operation hours Mg(HCO 3 ) 2 MgCO + CO + H O Ca(HCO CaCO heat Deposit

Coefficient of Performance (COP) of A/C systems Cooling Rate of A/C Systems T.R Q L W C C.O.P = = Electrical power required to generate above T.R

The Problem A/C system stoppage due to compressor high head pressure. Accumulation of stony deposits on the tube inner wall has a heat insulating effect that results in: ·‏ Reduction of system C.O.P and overall capacity ·‏ Lower C.O.P requires extra installed capacity- resulting in higher installation cost ·‏ Lower C.O.P means higher electricity consumption and maintenance costs. A/C system stoppage due to compressor high head pressure.

The Effect of Scale on A/C Performance Clean Regular 0.5 1 1.5 2 2.5 3 C.O.P 4 5 6 7 No of operational months 100% Refrigeration Months Minimum Another unit added Electricity in Kw

Current Design Consideration to Compensate Fouling · Add more capacity per unit · Add units as backup during disassembly and cleaning Current Operational Consideration to Compensate Fouling ·Use more electricity for the required cooling ·Operate another system earlier ·Special maintenance to disassemble and clean the heat exchanger

Keeping Heat Exchanging Tubes Always Clean Existing Solutions Chemical cleaning by acids. Shutting down and chemical-acid cleaning of the heat exchanger tubes. Frequent mechanical disassembly and acid cleaning of the heat exchanger tubes require excessive maintenance time. Acid can damage the tubes and the system. An additional backup unit is required to provide cooling while cleaning the system. Loss of production and cooling for days. Environmental problems due to the disposal of the chemicals.

Ball Tech system It is an hydro-mechanical system, circulate Sponge Balls through condenser's tubes and keep them permanently clean.

Ball Tech system installation

Ball Tech system Cleaning Concept Features *·The system injects and collects the soft balls in seconds 100% reliable system * Inject and Clean the tubes every 40 min (adjustable) totally avoids scale * The Sponge Balls made of natural rubber with special wear resistance additives * The sponge ball’ls diameter is 1 mm larger than that of the heat exchanger inner tube’s diameter.. * Sponge Ball’s and condense water specific weight are identical. * Sponge Ball has Excellent Flexibility * The sponge balls enter and moves through the heat exchanger tubes by the water flow * The sponge balls wipe off the inner tubes walls without disturbing the condense water flow. * Balls replacements - Every 1500 Hrs of the chiller works.

Ball Tech system installation

Ball Tech Injector and Sponge Ball rinsing

Ball Tech system advantages It is a simple, reliable hydro-mechanical system. It keeps heat exchanger’s tubes permanently and absolutely clean. It is simple to install and requires no modification to the heat exchanger. The ball flow does not disturb the condense water flow. It does not impair environmental quality. It preserves heat exchanger’s C.O.P. as designed by the manufacturer.

Saving on Air-conditioning’s energy consumption about 15% and more. Reduce maintenance and chemicals cost. It is one-time investment recoverable within one year. It prevents accelerated chiller’s compressor wear. Clean and simple procedures for supervision by any maintenance technician.

Patent Protection Ball-Tech Energy Ltd. has patented its BallTechnic System products throughout the world   Patents No ·‏ US 5176204 · Israel 96802 ·‏ US 5176204 · Israel 94289 ·‏ US 5086833 · Israel 79885 ·‏ US 4865121 · Europe 0-417-332-B1 Patents Applications in the following countries: · Israel · Japan · USA · China · Mexico · Singapore · S. Africa · Thailand · Europe · Australia

The Thermodynamic Cycle P-H Graph

Calculation of Cleaning Reliability: The BallTechnic system is using 30 balls for every 100 tubes in a pass (30% of the counted tubes) ·‏ Can this ratio clean all the tubes? ·‏ Yes, with 99.999....% reliability Some simple probability calculations ·‏ The chance of a ball not to pass through a specific tube is 0.7 ·‏ There are, however, about 40 cleaning cycle in 24Hrs and deposits are formed within 200 Hrs. ·‏ The probability of a ball not to clean a tube is reduced over 24 Hrs. at the power of 40 is: (0.7)40 = 6.3 * 10-7= 0.00000063 ·Conclusion: cleaning reliability of every tube is proved. ·Field experience: Unnecessary disassembly of the heat exchangers of systems equipped with BallTechnic shows 100% clean tubes with no exception

Ball Transfer Force Balls specific gravity is the same as water Ball diameter is 1 mm larger than tube diameter Pressure drop on tube is at least 1 meter (0.1 bar) per pas Example A 20 mm tube diameter, with 0.1bar (1 meter) pressure difference per pass The force that pushes the ball through the tube is: 0.1 bar x (3.14x22 cm)/4 = 0.315 Kg This pressure is much higher than is required to push the sponge ball through the tube.