CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013

Slides:



Advertisements
Similar presentations
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Advertisements

Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
ENERGY EFFICIENT STORAGE By Er.V.Vallivel, M.E Assistant Executive Engineer/ MRT/ TNEB/ Muppanda l RENEWABLE ENERGY SOURCES-TAMIL NADU/ INDIA.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Dealing with Uncertainty in Energy Systems Models.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Turning the wind into hydrogen: Long run impact on prices and capacity
1 March 2-3, 2015, Bonn Expert workshop Addressing Variable Renewables In Long‐Term Energy Planning (AVRIL) Renewables Energy Integration In Long‐Term.
The price of energy security in depressed electricity markets; the case of Belgium Prof.Dr. Johan Albrecht Faculteit Economie & Bedrijfskunde Second Summer.
Introduction to the EnergyPLAN model Henrik Lund Aalborg University Denmark Aalborg University, September October 2005 PhD-course: Energy System Analysis.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Overview of Energy- Environment Modeling MS&E 290: Public Policy Analysis February 22, 2005.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
ISF:RESEARCH AND CONSULTANCY THINK. CHANGE. DO INSTITUTE FOR SUSTAINABLE FUTURES South African Energy Sector Jobs to Report for Greenpeace Africa.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Scenarios for a South African peaking CSP system in a short term Stellenbosch University Energy Postgraduate Conference 2013 Cebo Silinga Supervisor: Paul.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
RSA 20–year Electricity Generation Policy.
Steady State Analysis Of A Microgrid Connected To A Power System
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
1 Where Does Electricity Come From?. 2 Overview of Electricity.
EG, EPS, Rome, EU-wide studies on the integration of renewable energies in the electricity grid F. Wagner, IPP Greifswald 1 Exemplified first.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
) Recherche & Innovation Multi-Objectives, Multi-Period Optimization of district networks Using Evolutionary Algorithms and MILP: Daily thermal storage.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Dr. Gabrial Anandarajah, Dr. Neil Strachan King’s College London
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
LUCIANO LOSEKANN DIOGO LISBONA EDMAR DE ALMEIDA
RENEWABLES AND RELIABILITY
Contents Introduction Focus area Wind scenarios
Towards a 100% Renewable Energy Supply “Renewables Working Together”
CCU Update integrated resource plan May 17, 2016
GENESYS Redevelopment Strawman Proposal
Matthew Wittenstein Electricity Analyst, International Energy Agency
ME 312 PPE POWER SYSTEM ANALYSIS
Assess variability from year to year: 2010, 2012, 2013, 2015
Restructuring Roundtable March 24, 2017 Boston, MA
What is POWERBALANCE?.
Economic Operation of Power Systems
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Tara Caetano, Bruno Merven, Jesse Burton and Matthew Meas
penetration of wind power
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
MRES Resource Operations in SPP
Assess variability from year to year: 2010, 2012, 2013, 2015
Evaluating flexibility and adequacy in future EU power systems: model coupling and long-term forecasting Sylvain Quoilin, Wouter Nijs and Andreas Zucker.
Thought Leadership in Climate Change
Security of supply - deriving a winter energy standard using the DOASA model EPOC Winter Workshop September 2018.
TYNDP: Ten-Year Network Development Plan 2016
Western Wind and Solar Integration Study Phase 1
Additional clarifications on economic and adequacy running hours
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
The role of demand and lifestyles in low carbon pathways
INTEGRATED ENERGY PLAN
Financial benefits of solar and wind power in South Africa in 2015
RE Grid Integration Study with India
这是面向未来的,面向2050年的可再生能源发展情景分析报告 Energy Research Institute of NDRC
Oemof user meeting 09-10/05/2017 Berlin RLI.
Bulgaria’s Energy and National Security
Joshua Linn (MIT and Resources for the Future)
FUNDAMENTALS OF 100%RES POWER SYSTEM
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013

Overview Background Presentation based on a study done for Eskom’s Solar 1 CSP plant to be constructed near Upington Study focused on the economic value of CSP Storage to the system Considers capacity and energy value to supply demand and reserves Detailed enough to analyse hourly profiles Content Methodology Assumptions Study Results 2018/11/07

Methodology

Conversion of Solar Data By System Advisor Model (SAM) of NREL SAM Receiver Thermal Energy Output (to Plexos) 2018/11/07

Modelling of CSP Generator In Plexos, include CSP Generator as part of Supply System Receiver Thermal Energy Output (from SAM) Spill(a) representing “de-focusing” of Heliostat Field when Solar Energy > (Generation Capability and Storage is full) Storage Spill(b) representing storage heat losses = f(storage) Energy to Generating Plant (normal Plexos modelling) 2018/11/07

System Modelling (Transmission not included) “Demand side” “Boundary conditions” Emission Constraints Adequacy Criteria Ensure match of supply and demand in-stantaneously Policy Objectives Jobs Localisation Local industry … Demand Forecast TWh 400 Mt CO2 600 Scenarios Scenarios Demand-side interventions (DSM) 200 400 200 2010 2020 2030 Iterative 2010 2015 2020 2025 2030 Energy & Capacity Shortfalls Least-cost optimisation model One result per scenario Plans as decision basis for DoE TWh GW 600 80 f 60 400 40 200 20 2010 2020 2030 2010 2020 2030 “Supply side” Committed New Builds & Decommissioning Capacity Options CAPEX OPEX Fuel costs Load factor Oper. regime … Coal Nuclear Wind PV CSP x 80 GW 60 Scenarios 40 20

Analysis Economic Analysis CSP amount of Storage Incrementally increase hours of storage (StoreHoursi, i = 1 to n) Determine total system cost for each increment (Plexos) [With CSP costs = 0] (SystemCostsi, i = 1 to n) Determine total CSP cost for each increment (SAM) [CSP Cost = Capital Cost + O&M Cost + Running Cost (water)] (CSPCostsi, i = 1 to n) Determine: Valuei+1 = SystemCostsi - SystemCostsi +1 Costsi+1 = CSPCostsi+1 - CSPCostsi If Valuei+1 > Costsi+1 Increase in storage is economic System Costs include capital, fixed and variable operating and maintenance and fuel costs incurred in meeting demand and reserves. Environmental costs are not internalised. A cap is placed on the annual amount of CO2. 2018/11/07

Assumptions

Input Data As per IRP2010 (updated where required) Demand Forecast Eskom and CSIR Reserves Requirements Eskom System Operator New build options EPRI CSP plant (Solar 1) Owner’s Engineer, SAM and EPRI Station commercial from 2022 Existing Plant Eskom DSM Eskom IDM 2018/11/07

Integrated Resource Plan 2010 (IRP 2010) centrally defines the generation mix until 2030 Installed capacity Energy mix Total installed Capacity in GW Electricity supplied in TWh per year Re- newable TWh's in 2030 (14%) 90 86 436 PV PV Carbon free TWh's in 2030 (34%) 80 CSP CSP Wind 70 Wind Hydro Hydro 60 Nuclear Nuclear 255 OCGT (Diesel) 50 OCGT (Diesel) 42 CCGT (Gas) 40 CCGT (Gas) 30 Coal 20 Coal 10 2010 2015 2020 2025 2030 Share re-newables 2010 2015 2020 2025 2030 5% 14% ~ 95% ??% CO2 intensity 912 g/kWh 600 g/kWh -34% Notes: Pumped storage capacity of 1,4 GW in 2010 and 2,7 GW in 2030 is not included since it is a net energy user Source: Integrated Resource Plan 2010, as promulgated in 2011; Eskom EPMD

Study

Models Models: SAM and Plexos SAM Convert solar irradiation to thermal energy available from Receiver (on an hourly basis) Plexos System optimisation by minimising total cost subject to constraints. Hourly chronological modeling. Monte Carlo approach for uncertainties. 2018/11/07

Options CSP parameters Solar Multiple (SM) – 1,0 to 3,5 CSP Storage – 1 to 12 hours System Parameters IRP2010 Policy Adjusted Plan Most significant impact for this analysis will be system adequacy Excess supply will decrease optimal CSP storage Supply shortage will increase optimal CSP storage Only IRP2010 Plan studied = adequate system 2018/11/07

Results

Load Factor (Capacity Factor) CSP : Load Factor vs. Storage Load Factor = Energy Sent-out in period (year) / (Sent-out Capacity x Hours in period (year)) Sent-out means as measured on the HV-side of the generator transformer (entry into the HV substation) 2018/11/07

Incremental Value and Cost Incremental Value or Incremental Cost vs. Incremental Storage 2018/11/07

Total System Cost Total System Cost vs. Storage 2018/11/07

Levelised Cost of Energy (LCOE) LCOE calculated from: Plant CAPEX, O&M and Running costs used in the study Optimal storage, with associated annual generation, as determined in the study 2018/11/07

Hourly Profiles Summer (four days) 2018/11/07

Hourly Profiles Winter (four days) 2018/11/07

Optimal Storage (hours) Conclusions A CSP Load Factor of > 60% can only be reached at Solar Multiples > 3,0 and storage in excess of 8 hours. CSP’s optimum storage capability, when using as value the benefit gained from forming part of the South African system, has been determined as: Based on the system analysis of SM up to 3,5 and number of Storage hours up to 12 the system optimal is reached at SM between 2,5 and 3,0 and Storage of between 9 and 12 hours. The CSP LCOE can be reduced to 65% of the LCOE at a base of SM = 1, when developed and operated at the system optimal point. The increased daily summer solar energy (compared to winter) dovetails well with the higher load factor requirement in summer due to the flatter system demand profile in summer. SM 1,0 1,5 2,0 2,5 3,0 3,5 Optimal Storage (hours) 3 5 7,5 11 >12 2018/11/07

Thank you