Linking Transportation Infrastructure and Water Quality

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Effective Stormwater Management Through the Use of Low-Impact Development (LID) Techniques Justin Gregory, PE Jones Edmunds & Associates October 3, 2012.
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
OVERVIEW Current Ordinance Has to Change Property Owners That Do Not Use The System Should Not Pay Property Owners That Use The System Receive a Benefit.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
Interlocal Agreement – Transportation Impact Fees City Council Workshop July 9, 2013.
Integrating LID Into the Development Planning Process.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Robert Beltran, P.E., BCEE Assistant Executive Director.
Florida’s Unified Stormwater Rule Status Lake Okeechobee WRAC November 2007 FDEP, Chad Kennedy Presenting for Eric Livingston and Michael Bateman.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1437 SOUTH BOULDER AVE., SUITE 1080  TULSA, OKLAHOMA  (P) (F)  Garnett Regional Detention Facility:
OVERVIEW Current Ordinance Has to Change Property Owners That Do Not Use The System Should Not Pay Property Owners That Use The System Receive a Benefit.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Interlocal Agreement – Transportation Impact Fees City Council Meeting July 16, 2013.
Transportation Projects City Council Workshop May 14, 2013.
GEFA Loan Programs CDBG Applicants Workshop Michael Roberts Program Manager Water Resources Division December 4, 2015.
Pennsylvania’s newest tool… Stormwater Management Authorities.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
BY: MARTY WANIELISTA, PHD., P.E. BMPTRAINS MODEL: BACKGROUND INFORMATION ON HARVESTING.
BMAP Forward & Septic Tanks 2012 Environmental Symposium John P. Pappas, P.E. Department of Public Works.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
The road ahead... Maximizing the benefits of maintenance efforts from a regulatory and fiscal perspective.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Sources, Transport, Fate Treatment Methodologies BMP Case Studies
Scoping Meeting April 20th 6:00 pm
Kurt Stephenson Virginia Tech December 2016
Metro’s Natural Areas: Maintenance Strategy Needed
Department of Environmental Quality Division of Mitigation Services
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Land Use Challenges In Maryland Today
Town of Melbourne Beach
Babcock Basin-Design Phase
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Stormwater Control Transfer Program Overview January 31, 2018
MPO School Transportation Working Group
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Michigan Dept. of Environmental Quality Water Resources Division
Anne Arundel County Maryland
Tulsa's Risk MAP Program Goals
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Key Program Benchmarks
AIF Florida Water Forum
Linking Transportation Infrastructure and Water Quality
CP-TXT Amendment to the Capital Improvements Element & Public School Facilities Element (Annual Update) October 2008.
Department of Environmental Quality Division of Mitigation Services
Alternative Compliance for New Developments
Lonza Biologics Campus Expansion, Portsmouth, NH Stormwater Management
Available Funding Resources
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Space Coast TPO State Road (S.R.) 528 Update
Larimer County: engineering
Presentation transcript:

Linking Transportation Infrastructure and Water Quality Carl Spirio, PE, FDOT Drew Bartlett, FDEP Rick Renna, PE, Atkins Panelists:

Topics Current Practice The Benefit/Cost of Current Practice Prudent Funding of Stormwater Improvements Recommended Direction Obstacles

Current Practice Typical Ponds Receiving Waterbody Outfall System (Waters of the State) Receiving Waterbody Typical Ponds DOT Road

Traditional Pond Design Approach

Traditional Pond Design Approach

I-75 from Lee County Line to Tuckers Grade

I-75 from Lee County Line to Tuckers Grade Originally, Project was NOT funded for R-O-W acquisition. All stormwater treatment and floodplain compensation to be managed within the median of I-75. Much of the bi-furcated median was jurisdictional wetlands. Approximately, 95 acres of wetlands would be impacted by the roadway and linear stormwater systems. This design approach presented difficulty in permitting due to the offsite constraints and TW concerns.

I-75 from Lee County Line to Tuckers Grade Cost Savings: $1.48 million in construction cost savings from eliminating median ponds. (Negative SA from contractor) Reduced wetland impacts saves approximately $715,000 in mitigation. Savings from not maintaining median ponds over 20 years is estimated to be $1,782,000. FDOT contributed $1.48 million toward acquisition of Bond Ranch Parcel by FDEP.

Study of FDOT Ponds – Costs Ponds Purchased, 2005 - 2010: R/W and Construction Costs R/W Costs Include Eminent Domain Costs Improvements Cost to Cure Business Damages Attorney Fees Experts Costs Relocation

$272M Total Cost $591k/acre Average Bad Investment! 5-year Study

Study of FDOT Ponds – Nutrient Removal & Efficiency Estimated annual nutrient removal using… Basin area & characteristics Pond size Annualized up-front costs over 20 years of performance TN C/B: $1,140/lb-N TP C/B: $5,037/lb-P

Comparison of SJRWMD and FDOT Approaches SJRWMD Projects TN Range: $24 - $156 / lb-TN TP Range: $148 - $1400 / lb-TP FDOT TN Average: $1,140/lb-N TP Average: $5,037/lb-P TN C/B: 13x Greater TP C/B: 7x Greater

FDOT Annual Stormwater Investment FDOT Capacity projects, 2005/06 – 2009/10: $13.1B Stormwater Management Investment $272M/$13.1B = 2.07% FDOT Capacity projects, FY 2018 - 2022: $21,110.9M Expected Stormwater Management Investment: 2.07% = $438M $87M/year Public Investment in Stormwater Quality

Prudent Funding of Stormwater Improvements Wisdom Funding Funding, Wisdom, but no authority: FRUSTRATION Wisdom & Authority, but no funding: USELESS Funding & Authority, but no Wisdom: INEFFECTIVE → DANGEROUS

ERP FDOT/Developers BMAP D.E.A.R. Legal/Regulatory Agency/Program Other possibility: FDOT funds WMD work program projects: a bit to fox/hen house! DEAR proposes an alternate ERP path to FDOT as a FIRST choice FDOT can pursue that path with DOT’s eminent domain authority FDOT gets BMAP credits for their funding BMAP stakeholders get credits for ongoing maintenance of new facilities Obstacle: state water quality law that requires immediate downstream treatment BMAP D.E.A.R.

Recommended Direction Allow FDOT to engage in nutrient-control water quality projects within the basin in lieu of satisfying nutrient-related water quality rules Require a measure of onsite pre-treatment to capture first-flush pollutants Water quality project must provide more environmental improvement than ERP rules Wetland mitigation and flood control requirements remain unchanged

Current Obstacles/Hindrances Must demonstrate NO additional pollutant load to drainage system, even to low-value ditches FDOT needs certainty in water quality requirements to avoid project delays due to re-design WMD reviewers need clear authority to accept non- traditional W/Q approaches

Thank you! Questions / Comments?