Predicting Interest Rates Statistical Models. Economic vs. Statistical Models Economic models are designed to match correlations between interest rates.

Slides:



Advertisements
Similar presentations
FINC4101 Investment Analysis
Advertisements

1 Project 2: Stock Option Pricing. 2 Business Background Bonds & Stocks – to raise Capital When a company sell a Bond - borrows money from the investor.
Binomial Option Pricing Model (BOPM) References: Neftci, Chapter 11.6 Cuthbertson & Nitzsche, Chapter 8 1.
Cost estimation - Cost behavior What we really want to understand is how spending will vary in a variety of decision settings. Cause-effect relations and.
Interest Rates Empirical Properties. The Nominal Interest Rate Suppose you take out a $1000 loan today. You agree to repay the loan with a $1050 payment.
Parameterizing Interest Rate Models Kevin C. Ahlgrim, ASA Stephen P. D’Arcy, FCAS Richard W. Gorvett, FCAS Casualty Actuarial Society Special Interest.
Risk and Return Learning Module.
Chapter Organisation 6.1 Bond Valuation 6.2 Common Stock Valuation
Chapter 25 Risk Assessment. Introduction Risk assessment is the evaluation of distributions of outcomes, with a focus on the worse that might happen.
Chapter 11 Managing Fixed-Income Investments 11-2 Irwin/McGraw-hill © The McGraw-Hill Companies, Inc., 1998 Managing Fixed Income Securities: Basic Strategies.
Short-Term Financing 20 Chapter South-Western/Thomson Learning © 2003 See c20.xls for spreadsheets to accompany this chapter.c20.xls.
Short-Term Financing 20 Chapter South-Western/Thomson Learning © 2006 Slides by Yee-Tien (Ted) Fu.
Multiple Regression and Model Building
Some Lessons from Capital Market History
© K.Cuthbertson, D.Nitzsche 1 LECTURE Market Risk/Value at Risk: Basic Concepts Version 1/9/2001.
Arvid Kjellberg- Jakub Lawik - Juan Mojica - Xiaodong Xu.
1 Term Structure of Interest Rates For 9.220, Ch 5A.
Important issues 723g28.
The Term Structure of Interest Rates
INVESTMENTS | BODIE, KANE, MARCUS Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER 15 The Term Structure.
Term Structure of Interest Rates For 9.220, Term 1, 2002/03 02_Lecture7.ppt.
1 16-Option Valuation. 2 Pricing Options Simple example of no arbitrage pricing: Stock with known price: S 0 =$3 Consider a derivative contract on S:
FINANCE 8. Capital Markets and The Pricing of Risk Professor André Farber Solvay Business School Université Libre de Bruxelles Fall 2007.
Duration and Yield Changes
06-Liquidity Preference Theory. Expectations Theory Review Given that Expectations Theory: – Given that we want to invest for two years, we should be.
Options and Speculative Markets Introduction to option pricing André Farber Solvay Business School University of Brussels.
05-Expectations Hypothesis
The Valuation of Bonds Minggu 9.
Corporate Finance Introduction to risk Prof. André Farber SOLVAY BUSINESS SCHOOL UNIVERSITÉ LIBRE DE BRUXELLES.
CHAPTER 15 The Term Structure of Interest Rates. Information on expected future short term rates can be implied from the yield curve The yield curve is.
TERM STRUCTURE OF INTEREST RATES (also called YIELD CURVE) A PLOT OF YIELD TO MATURITY VS. MATURITY.
Drake DRAKE UNIVERSITY Fin 284 The Term Structure and Volatility of Interest Rates Fin 284.
FNCE 3020 Financial Markets and Institutions Lecture 5; Part 2 Forecasting with the Yield Curve Forecasting interest rates Forecasting business cycles.
J. K. Dietrich - FBE Fall, 2005 Term Structure: Tests and Models Week 7 -- October 5, 2005.
Derivatives Introduction to option pricing André Farber Solvay Business School University of Brussels.
Valuing Cash Flows Non-Contingent Payments. Non-Contingent Payouts Given an asset with payments (i.e. independent of the state of the world), the asset’s.
Term Structure of Interest rate
Chapter 8 Mean-Reverting Processes and Term Structure Modeling.
Value at Risk.
Lecture 5 Historical Interest Rate Movements. Term Structure Shapes Normal upward sloping Inverted Level Humped.
Portfolio Management Lecture: 26 Course Code: MBF702.
Financial Risk Management of Insurance Enterprises
1 Modelling Term Structures MGT 821/ECON 873 Modelling Term Structures.
INVESTMENTS | BODIE, KANE, MARCUS Chapter Fifteen The Term Structure of Interest Rates Copyright © 2014 McGraw-Hill Education. All rights reserved. No.
Derivative Pricing Black-Scholes Model
LECTURE 22 VAR 1. Methods of calculating VAR (Cont.) Correlation method is conceptually simple and easy to apply; it only requires the mean returns and.
Intermediate Investments F3031 Passive v. Active Bond Management Passive – assumes that market prices are fairly set and rather than attempting to beat.
Testing Distributions of Stochastically Generated Yield Curves Gary G Venter AFIR Seminar September 2003.
Options, Futures, and Other Derivatives, 5th edition © 2002 by John C. Hull 23.1 Interest Rate Derivatives: Models of the Short Rate Chapter 23.
1 Derivatives & Risk Management: Part II Models, valuation and risk management.
Chapter 10 Capital Markets and the Pricing of Risk
1 Bond Portfolio Management Term Structure Yield Curve Expected return versus forward rate Term structure theories Managing bond portfolios Duration Convexity.
Fundamentals of Futures and Options Markets, 5 th Edition, Copyright © John C. Hull Value at Risk Chapter 18.
Chapter 12 Modeling the Yield Curve Dynamics FIXED-INCOME SECURITIES.
1 What Practitioners Need to know... By Mark Kritzman Holding Period Return Holding Period Return  HPR = (Ending Price – Beginning Price + Income) / Beginning.
Investments, 8 th edition Bodie, Kane and Marcus Slides by Susan Hine McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Chapter 24 Interest Rate Models.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 21.1 Interest Rate Derivatives: Models of the Short Rate Chapter 21.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 18.1 Exotic Options Chapter 18.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
1 FIN 2802, Spring 08 - Tang Chapter 15: Yield Curve Fina2802: Investments and Portfolio Analysis Spring, 2008 Dragon Tang Lecture 11 Bond Prices/Yields.
ESTIMATING THE BINOMIAL TREE
Financial Risk Management of Insurance Enterprises
The Term Structure of Interest Rates
The Term Structure of Interest Rates
The Term Structure of Interest Rates
Financial Risk Management of Insurance Enterprises
The Term Structure of Interest Rates
FIN 377: Investments Topic 5: The Term Structure of Interest Rates
The Term Structure of Interest Rates
Presentation transcript:

Predicting Interest Rates Statistical Models

Economic vs. Statistical Models Economic models are designed to match correlations between interest rates and other economic aggregate variables Economic models are designed to match correlations between interest rates and other economic aggregate variables Pro: Economic (structural) models use all the latest information available to predict interest rate movements Pro: Economic (structural) models use all the latest information available to predict interest rate movements Con: They require a lot of data, the equation can be quite complex, and over longer time periods are very inaccurate Con: They require a lot of data, the equation can be quite complex, and over longer time periods are very inaccurate

Economic vs. Statistical Models Statistical models are designed to match the dynamics of interest rates and the yield curve using past behavior. Statistical models are designed to match the dynamics of interest rates and the yield curve using past behavior. Pro: Statistical Models require very little data and are generally easy to calculate Pro: Statistical Models require very little data and are generally easy to calculate Con: Statistical models rely entirely on the past. They dont incorporate new information. Con: Statistical models rely entirely on the past. They dont incorporate new information.

The Yield Curve Recall that the yield curve is a collection of current spot rates Recall that the yield curve is a collection of current spot rates S(1)S(2)S(5)S(10)S(20)

Forward Rates Forward rates are interest rates for contracts to be written in the future. (F) Forward rates are interest rates for contracts to be written in the future. (F) F(1,1) = Interest rate on 1 year loans contracted 1 year from now F(1,1) = Interest rate on 1 year loans contracted 1 year from now F(1,2) = Interest rate on 2 yr loans contracted 2 years from now F(1,2) = Interest rate on 2 yr loans contracted 2 years from now F(2,1) = interest rate on 1 year loans contracted 2 years from now F(2,1) = interest rate on 1 year loans contracted 2 years from now S(1) = F(0,1)

Spot/Forward Rates Now1yr2yrs4yrs3yrs5yrs F(0,1)F(1,1)F(2,1) S(1) S(2) S(3) F(0,2) F(1,2) Spot Rates Forward Rates F(2,2) F(1,3)

Calculating Forward Rates Forward rates are not observed, but are implied in the yield curve Forward rates are not observed, but are implied in the yield curve Suppose the current annual yield on a 2 yr Treasury is 2.61% while a 1 yr Treasury pays an annual rate of 2.12% Suppose the current annual yield on a 2 yr Treasury is 2.61% while a 1 yr Treasury pays an annual rate of 2.12% Now1yr2yrs4yrs3yrs5yrs F(1,1) S(1) S(2) 2.61%/yr 2.12%/yr

Calculating Forward Rates Now1yr2yrs4yrs3yrs5yrs F(1,1) S(1) S(2) 2.61%/yr 2.12%/yr Strategy #1: Invest $1 in a two year Treasury $1(1.0261)(1.0261) = (5.3%) Strategy #2: Invest $1 in a 1 year Treasury and then reinvest in 1 year For these strategies, to pay the same return, the one year forward rate would need to be 3.1% $1(1.0261)(1.0261) = $1(1.0261)(1+F(1,1) $1(1.0212)(1 + F(1,1)) 1+F(1,1) = $1(1.0261)(1.0261) $1(1.0212) =1.031

Calculating Spot Rates Calculating Spot Rates We can also do this in reverse. If we knew the path for forward rates, we can calculate the spot rates: We can also do this in reverse. If we knew the path for forward rates, we can calculate the spot rates: Now1yr2yrs4yrs3yrs5yrs 3.3% S(1) S(2) ??? 2% 2.9% S(3) ???

Calculating Spot Rates Now1yr2yrs4yrs3yrs5yrs 3.3% S(2) ??? Strategy #1: Invest $1 in a two year Treasury $1(1+(S(2))(1+S(2)) Strategy #1: Invest $1 in a 1 year Treasury and then reinvest in 1 year For these strategies, to pay the same return, the two year spot rate would need to be 2.6% $1(1.02)(1.033) = $1(1+S(2)) $1(1.02)(1.033) = (5.4%) 1+S(2) =((1.02)(1.033))= % 2 1/2

Arithmetic vs. Geometric Averages Now1yr2yrs4yrs3yrs5yrs 3.3% S(2) 2.6% In the previous example, we calculated the Geometric Average of expected forward rates to get the current spot rate The Arithmetic Average is generally a good approximation 2% 1+S(2) =((1.02)(1.033))=1.026 (2.6%) 1/2 S(2) = 2% + 3.3% 2 = 2.65%

Now1yr2yrs4yrs3yrs5yrs 3.3% S(1) S(2) 2.65% 2% 2.9% S(3) 2.73% S(2) = 2 = 2.65% 2% + 3.3% S(3) = 3 = 2.73% 2% + 3.3% + 2.9% Spot rates are equal to the averages of the corresponding forward rates (expectations hypothesis)

However, the expectations hypothesis assumes that investing in long term bonds is an equivalent strategy to investing in short term bonds Now1yr2yrs4yrs3yrs5yrs 3.3% S(2) 2.65% 2% This rate is flexible at time 0 This rate is locked in at time 0 Long term bondholders should be compensated for inflexibility of their portfolios by adding a liquidity premium to longer term rates (preferred habitat hypothesis)

Statistical Models Now1yr2yrs4yrs3yrs5yrs 3.3%F(0,1)F(3,1)F(2,1)F(1,1)F(4,1) First, write down a model to explain movements in the forward rates Then, calculate the yield curve implied by the forward rates. Does it look like the actual yield curve? Now1yr2yrs4yrs3yrs5yrs S(1) S(2) S(3)

Lattice Methods (Discrete) Lattice models assume that the interest rate makes discrete jumps between time periods (usually calibrated monthly) Lattice models assume that the interest rate makes discrete jumps between time periods (usually calibrated monthly) Binomial: Two Possibilities each Period Binomial: Two Possibilities each Period Trinomial: Three Possibilities each Period Trinomial: Three Possibilities each Period

An Example At time zero, the interest rate 5%: F(0,1) = S(1) At time zero, the interest rate 5%: F(0,1) = S(1)

An Example In the first year, the interest rate has a 50% chance of rising to 5.7% or falling to 4.8%: F(1,1) In the first year, the interest rate has a 50% chance of rising to 5.7% or falling to 4.8%: F(1,1)

An Example In the second year, there is also a 50% chance of rising or falling conditional on what happened the previous year: F(2,1) In the second year, there is also a 50% chance of rising or falling conditional on what happened the previous year: F(2,1)

Calculating the Yield Curve 5.7% 5% 4.8% Path 1: (1.05)(1.057) = (10.985%) Path 2: (1.05)(1.048) = (10.04%) (.5)( ) + (.5)( ) = ( %) Expected two year cumulative return = Annualized Return = ( ) 1/2 = (5.12%) = S(2) S(1)

5.7% 5% 4.8% Path 1: (1.05)(1.057)(1.064) = (18.1%) Path 2: (1.05)(1.057)(1.052) = (16.8%) (.25)(1.181) + (.25)(1.168) + (.25)(1.157) +(.25)(1.151) = Expected three year cumulative return = Annualized Return = (1.164) 1/3 = (5.19%) = S(3) 4.6% 5.2% 6.4% Path 3: (1.05)(1.048)(1.052) = (15.7%) Path 4: (1.05)(1.048)(1.046) = (15.1%)

Future Yield Curves 5.7% 5% 4.8% 4.6% 5.2% 6.4% Suppose that next months interest rate turns out to be 4.8% = S(1) Path 1: (1.048)(1.052) = (10.25%) Path 2: (1.048)(1.046) = (9.6%) (.5)(1.1025) + (.5)(1.096) = (9.3%) S(2) = (1.099) 1/2 = (4.9%)

Volatility & Term Structure A common form for a binomial tree is as follows: A common form for a binomial tree is as follows: Sigma is measuring volatility

Higher volatility raises the probability of very large or very small future interest rates. This will be reflected in a steeper yield curve

Continuous Time Models Change in the interest rate at time t Deterministic (Non-Random) component Random component Random Error term with N(0,1) distribution

Vasicek The Vasicek model is a particularly simple form: The Vasicek model is a particularly simple form: Controls Persistence Controls Mean Controls Variance

Using the Vasicek Model Choose parameter values Choose parameter values Choose a starting value Choose a starting value Generate a set of random numbers with mean 0 and variance 1 Generate a set of random numbers with mean 0 and variance 1t=0t=1t=2t=3t=4 i6%6.8%6.84%4.202%5.5616%.2(6-i) dz di

Vasicek (sigma = 2, kappa =.17)

Vasicek (sigma = 4, kappa =.17 )

Vasicek (sigma = 2, kappa =.4)

Cox, Ingersoll, Ross (CIR) The CIR framework allows for volatility that depends on the current level of the interest rate (higher volatilities are associated with higher rates) The CIR framework allows for volatility that depends on the current level of the interest rate (higher volatilities are associated with higher rates)

Heath,Jarow,Morton (HJM) Vasicek and CIR assume a process for a single forward rate and then use that to construct the yield curve Vasicek and CIR assume a process for a single forward rate and then use that to construct the yield curve In this framework, the correlation between different interest rates of different maturities in automatically one (as is the case with any one factor model) In this framework, the correlation between different interest rates of different maturities in automatically one (as is the case with any one factor model) HJM actually model the evolution of the entire array of forward rates HJM actually model the evolution of the entire array of forward rates Change it the forward rate of maturity T ant time t

Table 1 Summary Statistics for Historical Rates Tables 1-4 from Ahlgrim, DArcy, and Gorvett, CAS 1999 DFA Call Paper Program

Table 2 Summary Statistics for Vasicek Model Notes: Number of simulations = 10,000, = , = , =

Table 3 Summary Statistics for CIR Model Notes: Number of simulations = 10,000, = , = , =

Table 4 Summary Statistics for HJM Model Notes: Number of simulations = 100