Kosrae State Energy Action Plan Update

Slides:



Advertisements
Similar presentations
UK-Malawi Trade & Investment Forum March 20, 2013 Energy Sector Perspectives Rob Mills World Bank.
Advertisements

© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
How Technology will make Renewable Energy Competitive 10/17/2013
Climate Investment Funds SCALING-UP RENEWABLE ENERGY IN LOW- INCOME COUNTRIES (SREP) Investment Plan for Solomon Islands June 2014 Government of Solomon.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
KIER Workshop February 2015 ‘Apisake Soakai (SIDS Coordinator) SUMMARY OF THE IRENA RRA RECOMMENDED ACTIONS.
Interconnection of Distributed Generation
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
ENERGY UNION AND SMART ISLANDS Guest speaker Ing. Renzo Curmi Council Member of Gozo Business Chamber The Gozo Business Chamber.
Simon Gamble Manager Hybrid Off-Grid Solutions Running a power grid with 100% renewables on King Island, Australia.
System Reliability Procurement: Non-wires Alternatives in Rhode Island Tim Roughan National Grid.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
OPPD’s Sustainability Efforts Denise Kuehn. Omaha Public Power District Public Utility –336,000 Customers –2,200 Peak –Generation (2,550 MW) –Transmission.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
PROPOSED PROJECTS SUBMITTED TO DEVELOPMENT PARTNERS FORUM March 2014 KIER Workshop 25/02/2015.
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
ENERGY STAR® WORKSHOP Riffe Center Columbus, Ohio April 26, 2007.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Highlights ( ) PEAG Meeting, Suva, Fiji November, 2015.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
Mafalu Lotolua PEAG Meeting, SPC, Suva, Fiji 16 th - 18 th November 2015 Tuvalu’s Progress on it’s Energy Master Plan Target
VANUATU Renewables Readiness Assessment Report November 2015.
Power Resiliency at Water Utilities: What States Can Do Lauren Wisniewski U.S. Environmental Protection Agency ASDWA Webinar August 5, 2015.
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Electricity Sector Management Palestine. HEPCO Establishment Organization Chart Concession Area Map 33/11 KV Substations SW & HW Used.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Getting a Grid Connection to Export Power Energy in Agriculture rd August 2016.
Module 11 -Cost Estimation This module covers how to estimate project costs including: –Equipment costs – combination of procurement and installation (including.
Distribution System Planning in Hawaii
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Middle East Distribution Transformer Market Price, Packaging Trends, Industry.
COUNTRY PRESENTATION TRAINING TO SUPPORT RENEWABLE ENERGY
Progress Briefing - Energy Initiative
Introduction to Electric Power System and A. C. Supply
Irvine Ranch Water District Distributed Energy Storage Case Study
VANUATU Joshua Chalapan Nari Department of Energy Vanuatu.
ELECTRICITY COMMISSION
EDENTON-CHOWAN SCHOOLS
Republic Of Palau Sherwin Wasai Palau Public Utilities Corporation
Distributed Generation
FUEL CELLS.
CURRENT STATUS - ENERGY TRANSITION
Transition towards Low Carbon Energy Monday 12th June 2017
Narasimhan Santhanam EAI,
Restructuring Roundtable March 24, 2017 Boston, MA
Affordable Energy Production from Renewable Fuel
City of Cape Town New Urban Agenda
Transmission and Distribution Loss Study
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Energy Sector Overview Federated States of Micronesia
The Transition to a High DER Future
Micronesian Energy Association (MEA) Green Energy Micronesia (GEM)
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
THE REPUBLIC OF MALAWI MALAWI PRESENTATION AT
About Saint Lucia Located in the Caribbean AREA:238 sq. miles,
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
City Council April 30, 2018 Item 13
The Green Communities Act: WMECO perspective
Forging Sustainable Solar (and Storage) Incentives for New England
March, 30 – April 3, 2009, Honolulu, Hawaii
Solar Energy Commercialization
Fueling the Future of the Fairbanks North Star Borough
Brunswick Landing Microgrid Development
EDENTON-CHOWAN SCHOOLS
Presentation transcript:

Kosrae State Energy Action Plan Update Presentation from KOSRAE UTILITIES AUTHORITY

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS POWER IMPROVEMENT PROJECTS FOR POWER GENERATION 1.1 NEW POWER PLANT WITH TWO (2) 600 KW CONTRACTOR TO MOBILIZE 3 PHASE GENERATOR WITH ACCESSORIES BY FEBRUARY 2017 AND INDOOR SUBSTATION (JICA FUND) 1.2 POWER DISTRIBUTION SYSTEM UPGRADE IN SCHEDULED BY AUGUST 2017 LELU ISLAND. (JICA FUND) 1.3 UPGRADE OF OKAT UNDERGROUND POWER WORK TO START OCTOBER 2017 CABLES (JICA FUND) HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS 1.4 REPLACEMENT OF ONE (1) NON OPERATIONAL GENERATOR AT THE POWER PLANT WITH A NEW UNIT OF PROCUREMENT ON GOING 600 KW GENSET (WORLD BANK FUNDING) 1.5 UPGRADE OF FUEL STORAGE TANKS AT THE POWER PLANT FROM HOLDING CAPACITY OF 60,000 GALS. TO AWAITING FUNDING 100,000 GALLONS OF DIESEL. HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS  2. IMPROVEMENT PROJECTS FOR POWER DISTRIBUTION SYSTEM 2.1 CONDUCT GRID STABILITY STUDY ON SMART SUBSTATIONS WITH ENERGY STORAGE SYSTEM LEADING TO OPTIMIZING AND WAITING FOR FUNDING SYNCHRONIZING THE DIESEL GENERATORS OPERATION WITH RENEWABLE ENERGY SOURCES. (FUNDING WAS REQUESTED FROM GCF/ADB. 2.2 UPGRADE OF POWER DISTRIBUTION LINES AT THE FOLLOWING AREAS: A. DOUBLE CIRCUIT POLES FROM TOFOL TO PUHKUSRIK TRIANGLE B. PRIMARY POLES FROM WASR WASR, TAFUNSAK TO OKAT C. TAFUNSAK INNER ROAD EXTENSION WAITING FOR FUNDING D. UTWA WALUNG LINE UPGRADE E. CROSS ISLAND ROAD NEW POWER LINE F. OKAT MELO LINE EXTENSIION G. MALEM INNER ROAD INTERCONNECTION HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS  2. IMPROVEMENT PROJECTS FOR POWER DISTRIBUTION SYSTEM 2.3 Acquisition of major equipment to replace worn down equipment used for operations: A. Two (2) Lineman’s Bucket Truck B. One (1) Auger Truck ONE (1) LINEMAN’S TRUCK C. One (1) Tree Chipper Truck UNDER PROCUREMENT BY KUA; D. One (1) Backhoe/Excavator ANOTHER ONE (1) UNIT, LINEMAN’S E. One (1) Forklift, 3.5 tons TRUCK REQUESTED FROM W.B. F. One (1) Submersible Portable Pump 2.4 LED STREET LIGHTING PROJECT REPLACEMENT OF OLD AND INEFFICIENT STREET LED LIGHTS BEING PROCURED FROM LIGHTS WITH NEW AND LOWER WATTAGE LED LIGHTS. WORLD BANK FUNDING. HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS  2. IMPROVEMENT PROJECTS FOR POWER DISTRIBUTION SYSTEM 2.5 INSTALLATION OF 500 KVA PAD MOUNTED 3 PHASE TRANSFORMER UNIT BEING PROCURED FOR LUEN THAI FISHING VENTURE AT OKAT HARBOR. FROM WORLD BANK FUND. 2.6 ACQUISITION OF POLE MOUNTED TRANSFORMERS FOR FOR PROCUREMENT EMERGENCY REPLACEMENTS, HARDWARES, FITTINGS, FUSES, WIRES AND SPARES. 2.7 DISTRIBUTION TRANSFORMERS METERING; A PROGRAM TO MONITOR THE POWER LOADS AT THE INDIVIDUAL TO SECURE FUNDS POLE MOUNTED TRANSFORMERS TO VERIFY ACTUAL LOADING COMPARED TO INSTALLED TRANSFORMER SIZE. (RECOMMENDED BY KEMA) HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS  3. POWER PROJECTS FOR RENEWABLE ENERGY AND ENERGY EFFICIENCY 3.1 EXPAND THE CAPACITY OF THE SOLAR PV SYSTEM IN KOSRAE AWAITING FUNDING FROM FROM THE PRESENT CAPACITY OF 350 KW TO 750 KW. DONORS. 3.2 INSTALLATION OF ANOTHER 500 KW SOLAR PV SYSTEM PROPOSED BY PROPOSAL UNDER STUDY THE FSM NATIONAL GOVERNMENT TO THE JAPAN GOVERNMENT BY JAPANESE GOVERNMENT 3.3 FULL UTILIZATION OF CASHPOWER PRE PAID METERS TO PROGRAM IS ON FULL ALL KUA CUSTOMERS. IMPLEMENTATION AROUND 80 % COMPLETE. 3.4 UTILIZATION OF COMPACT FLOURESCENT LAMPS AND LED PROGRAM IS IN FULL LIGHTS TO RESIDENCES AND COMMERCIAL ESTABLISHMENTS. IMPLEMENTATION HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS  3. POWER PROJECTS FOR RENEWABLE ENERGY AND ENERGY EFFICIENCY 3.5 INSTALLATION OF SCADA PROGRAM FOR POWER PLANT TO BE CONSIDERED AND AND DISTRIBUTION SYSTEM INTERFACE/MONITORING. STUDIED AFTER THE CONSTRUCTION ( KEMA RECOMMENDATION) OF THE NEW POWER PLANT. 3.6 INSTALLATION OF KW DEMAND METER ON CUSTOMERS WITH NEEDS SPECIAL STUDY ON THE LARGE POWER DEMAND. FEASIBILITY OF THE PROJECT. BOARD DECISION IS REQUIRED AS REVISION OF POLICY WILL BE REQUIRED TO IMPLEMENT. 3.7 CONDUCT ENERGY EFFICIENCY AWARENESS PROGRAMS ON GOING PROGRAM TO MUNICIPALITIES AND SCHOOLS. HIGH PRIORITY PROJECTS

HIGH PRIORITY PROJECTS   PROJECT PRESENT STATUS 3. POWER PROJECTS FOR RENEWABLE ENERGY AND ENERGY EFFICIENCY 3.8 CAPACITY BUILDING IN RENEWABLE ENERGY, PROGRAMS ARE COORDINATED WITH ENERGY EFFICIENCY SYSTEMS, ENERGY AUDITS, REGIONAL AGENCIES (PPA, SPREP, ALTERNATE ENERGY SYSTEMS, AND CONVENTIONAL SPC, ETC.) FOR APPROPRIATE ENERGY EFFICIENCIES. COURSES FOR ISLAND ENERGY PRACTIONERS. 3.9 DEVELOPMENT OF SOLAR PV SYSTEM WITH AN ENERGY PROGRAM IS UNDER DEVELOPMENT IN STORAGE FACILITY (FLYWHEEL SYSTEM), 1MW CAPACITY PARTNERSHIP WITH A US BASED ENTITY (INDIAN ENERGY ). 3.10 DEVELOPMENT OF OTHER RENEWABLE ENERGY SOURCES PROGRAM BEING COORDINATED WITH (WAVE, HYDRO, WIND, OTEC, BIO MASS, ETC.) OFF ISLAND ENTITIES (PPA, EU, ETC.) HIGH PRIORITY PROJECTS

THANK YOU AND MORE POWER TO ALL