Cryo stop of P8 on 1st of November

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

GAS PURGE SYSTEMS ‘Manly Hydraulics Laboratory’ 28 th June 2011.
3-Multi - Can Annular Combustor 3-Multi - Can-Annular Combustor The third design and the one preferred by most manufacturers, is the can-annular combustor,
Instrumentation Analyzer Pressure Regulation and Vent Recovery System Frank Ruiz, Ruiz & Associates.
Design Criteria for LP BYPASS SYSTEM
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
MODULATING BURNERS RL/M Series burner operation. UNMB1NL W1W2 B4 B3 AL CH AL1 Q NN N LANDIS LAL 1.25 or LOK 16. III M FR M.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Magnet & services projects P. Tropea 9 Nov 2011 – CMS upgrade workshop.
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
XAS 375 CD6 Compressors Committed to sustainable productivity
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
Cooling System Solutions
7:50 am to 8:40 am Math Mr. Shoemaker AllanDennisDanielStudent LexisMichaelSarah Brittney Ames James Eva Brittney Tameka.
SC - 08Jul'11LHCCryo - TechStop July 2011 LHC Tech Stop July 2011 LuMaMeJeVe Empty QRL_C 1.8K Ref. CP7 Deg Pump ? Deg Pump Refill.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
NA62 CV activities Piero Valente 5 th September
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
TE-CRG Activities D. Delikaris, TE-CRG.
1.8 K cycle and specificities CC: - 3D wheels - Bearings (300K) HX: - Very Low Pressure “Mixed” Compression P ratio ≈ 80 HX Stainless Steel Plate Axial-centrifugal.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
TS2 preparatory meeting
EVLA Helium Circuit Cryogenic
WHY? HOW? Test Valve Measure Vibrations Contain Valves
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
The BCHS Semester Two Exam Schedule
Greenleys First School Christmas Performances 2016
Technical data‘s of lubrication pumps of oil loaded gas compressors medium : lubrication oil with flare gas Low pressure compressors on oil platform 6.
LHC-TS3 Coordination meeting #3
Coordination of Hardware Commissioning
Date of download: 11/11/2017 Copyright © ASME. All rights reserved.
NOVEMBER 15, 2017 PHILADELPHIA, PA
Activities of the ME section during LS2 ( )
CRG-ME YETS 2017/2018 activities
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
Status of the cryogenic system for B180
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Power cut 18kV cable for EMD404/E9 is heating
Flow Network Construction
Mathew C. Wright January 26, 2009
Christmas Opening Hours
Food Safety Task Force 10/23/15
Context at P8 Last slide presented at LMC early May 2012
SCHEDULE WEEKDAY LESSONS:
November technical stop activities:
Access to HE Standardisation Event Level 2 and Level 3 Study Skills Wednesday, 1st November 2017, 9.30 am to pm.
Year 6 Residential 3rd July – 5th July 2019.
Year 6 Residential 5th July – 8th July 2020.
HYDRAULIC SCHEME PRESS G SERIES.
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Year 6 Residential 8th July – 10th July 2020.
Cold compressor speed S45
My School Days The first day back is Wednesday.
Parent/Caregiver “Pop In “ Day
Wesson Building Medical Air Compressor
P8 cryogenic PLC problems on
ESR2 Cryoplant Utilities
Compressor Operating Instructions
Wednesday 14:30 Fill 2011 dumped.
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Tuesday
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Mon 8/8 – Tue 9/8 Stable beams #2009
SNOMED CT Developer Education Days
Presentation transcript:

Cryo stop of P8 on 1st of November Stop of warm compressor CP6 of QSCB on safety chain (oil differential pressure low) at 10:35AM After investigation, problem of oscillations with the controller of 6CV670 which regulate the differential pressure of the oil injection of high stage compressors of the station LHCB Problem of oscillations on this valve was already observed … and controller was due to be changed during next TS New controller installed over lunch time Restart of installations by 2PM Recovery expected by Wednesday evening…

Problem (oscillations) with controller of 6CV670, which regulate ΔP of oil injection for compressor

Cryo stop of P8 on 1st of November Faulty controller 6CV670