First Year Robotics Platform By: Andria Farnham, Adam Selinger, Curtis Langley.

Slides:



Advertisements
Similar presentations
Robofest 2005 Introduction to Programming RIS 2.0 RCX Code.
Advertisements

Engineering Roles We will be forming groups of 3 students
Automation and Robotics
VEX and Robot C Chris Patterson Presented by Modified by J. Andazola.
Connecting VEX and ROBOTC
A.G.I.L.E Team Members: Brad Ramsey Derek Rodriguez Dane Wielgopolan Project Managers: Dr. Joel Schipper Dr. James Irwin Autonomously Guided Intelligent.
KTD Micromouse Overview Team Goals Approach Outstanding Problems Future Solutions Final Status.
Project Life Cycle Jon Ivins DMU. Introduction n Projects consist of many separate components n Constraints include: time, costs, staff, equipment n Assets.
Team P.A.C.K men EE 296 Project. Chris Mcleod Hardware Specialist.
Deon Blaauw Modular Robot Design University of Stellenbosch Department of Electric and Electronic Engineering.
Athletic Field Marking Device Anthony Cortese, Ryan Crump, Matthew Lawler, Patrick Shaughnessy (Team Leader), John Sudia.
3-D Scanning Robot Steve Alexander Jeff Bonham John Johansson Adam Mewha Faculty Advisor: Dr. C. Macnab.
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
Autonomous Tracking Robot Andy Duong Chris Gurley Nate Klein Wink Barnes Georgia Institute of Technology School of Electrical and Computer Engineering.
Adapted for STLP Camp ‘09 Mobile Robots Why do robots need to move?
Why do robots need to move?
To come up with a practicum project that full filled the 411 requirements Create a fun project that would get kids interested in science and engineering.
Smart Plant Robot Prepared by Haya De’bas Jumanah Salhab Supervisor Dr. Ra’ed Al-Qadi.
CS 8650 AI & Robotics, Dr. Hoganson Copyright © 2004, 2005, 2006 Dr. Ken Hoganson CS8650-Monday Class Will Start Momentarily… CS 8650 Introduction.
SIPHER Students: Javier Lara, Darren Lamison-White Graduate Student Advisors: Ethan Jackson, Ryan Thibodeaux Controlling Robots: Long distance, straight-line.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
Design Process Overview. What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human.
The Recycling Robot SECON Team B Mid-Term Presentation.
The George Washington University Electrical & Computer Engineering Department ECE 002 Dr. S. Ahmadi Class3/Lab 2.
Abstract As our second project for the semester we were confronted with an assignment to improve the functioning of a printer. Our task is to develop a.
SECON 2012 Final Presentation. Team Michael Helmbrecht Electrical Engineer Measurement Tasks Course Construction Chris Nicholas Computer Engineer Measurement.
EV3 Software EV3 Robot Workshop
The Recycling Robot SECON Team B Mid-Term Presentation.
ROBOTC Software EV3 Robot Workshop
The Recycling Robot SECON Team B Mid-Term Presentation.
Abstract Parking your vehicle in the garage is a task that most of us take for granted. We head home from work or school, raise the garage door and drive.
VEX and Robot C Chris Patterson Frisco ISD CTE Center Presented by.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Robotics Projects First Attempt at Creating Teams Take a Closer Look at the Game.
UNH FIREFIGHTING ROBOT Ryan Morin, Craig Shurtleff, Andrew Levenbaum, Stephen Tobin, and Liam O’Connor University of New Hampshire: College of Engineering.
Project Overview  Structural part Introduction  Laser cutting & forming  Model making  Designing & Developing  Manufacturing  Building & Analysing.
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
Mobile Robots Why do robots need to move?. What defines a robot? Sense – a robot has to take in information about its environment Plan – a robot has to.
Connect VEX and ROBOTC Electrical Engineer Responsibilities © 2011 Project Lead The Way, Inc.Automation and Robotics VEX.
Introduction to VEX® components
IEEE South East Conference 2016 MID-SEMESTER PRESENTATION.
LESSON 04 Starter Key words: Programmable, environment, design, manufacturing and application Modelling VEX Tumbler solutions In this lesson you are.
Robotics Programming Wall Follow Line tracking for a set amount of time Line tracking for a distance.
Somerset Berkley Regional High School Robotics Engineering with LabView.
Project Overview Introduction Clawbot Build Design Modification
Electrical Engineer Responsibilities
Know your Robot Electrical Parts
Robotics Education & Competition Foundation
Project Overview Introduction Clawbot Build Design Modification
What the National Curriculum requires in design and technology at KS1
Using the Bumper switch
VEX IQ Curriculum Smart Machines Lesson 09 Lesson Materials:
Design & Technology at Marlborough Primary School
Electrical Engineer Responsibilities
LESSON 04. LESSON 04 LESSON 04 STARTER Modelling VEX Tumbler solutions In this lesson you are going to adapt and improve your virtual CAD VEX Tumbler.
Industrial Assessment Center Database
Project Overview Introduction Clawbot Build Design Modification
Project Overview Introduction Clawbot Build Design Modification
Project Overview Structural part Introduction Laser cutting & forming
Project Overview Introduction Clawbot Build Design Modification
Electrical Engineer Responsibilities
Using the Bumper switch
By: Zeeshan Ansari, BEng (Hons) Electronic Engineering
Programming Part 2 Mod Kit
Project Overview Introduction Clawbot Build Design Modification
Electrical Engineer Responsibilities
Product Evaluation & Quality Improvement
Product Evaluation & Quality Improvement
AN INEXPENSIVE ROBOTIC KIT FOR CHILDREN EDUCATION
Presentation transcript:

First Year Robotics Platform By: Andria Farnham, Adam Selinger, Curtis Langley

Topics of Discussion

Introduction The First Year Robotics Platform project involves the development of a design project for first year ENGR 120 students involving a simple robot platform. The platform will provide students with a starting point and leave room for further expansion and students input.

ENGR 120 Project Outline

Vex Robotics Design System The Vex Robotics Design System is a robotic kit designed as an introduction into the world of robotics. The system offers programming in RobotC for simplified user interface, and comes with a number of building parts and sensors including: Structural components: metal braces, wheels, treads, and gears. Structural components: metal braces, wheels, treads, and gears. Sensors: ultra sonic, line tracking, light sensors, bumper switches, and limit switches. Sensors: ultra sonic, line tracking, light sensors, bumper switches, and limit switches. Electrical components: motors, pneumatics, power packs, transmitters, and receivers. Electrical components: motors, pneumatics, power packs, transmitters, and receivers.

ENGR 120 Project Motivation This project is designed to give first year students exposure to Electrical and Computer Engineering to give them a better idea which area of Engineering they would like to major in.

Project Goals Come up with a design for a robot cart that will be constructed with VEX robotics pieces that students will be able to use with provided sensors in order for the robot to locate a specific end- point location.

Project Goals

Project Overview Considering all design criteria, each team member independently generated 3 ideas for the cart design and type of target-point utilizing the design method. The list of initial designs were individually and independently ranked by each team member against the outlined design constraints and project goals. The individual team member rankings for the 9 cart and point-locater designs were combined and averaged. The resulting averages were ordered from lowest to highest with the top ranking 3 being selected for further analysis. Evaluate Design Weight Review

Cart Designs Design 1: Moe Modeled after standard VEX Tumbler Design. Four wheels, four drive motors: One per each wheel Fixed Front-Facing Sensor Array Design 2 : LS Navigator Modeled after standard VEX Tumbler Design. Four wheels, three drive motors: One per front wheel Single rear-drive via differential Rotating Sensor Mount for 360° field of view Design 3 : Flying Wedge Triangular shaped Three Wheels, one drive motor: Single rear drive via differential Single direction controlled front wheel. Rotating Sensor Mount for 360° field of view

Task Designs Design 1: Hot-Spot Robot finds a definite point. Possible challenges: Radiation (Heat) source. Intersection of two lasers. Light intensity (high/low) detection. Design 2: Line Snooper Robot tracks a solid colour line Possible challenges: Manages broken lines. Manages 90 o turns. Determines correct path between varying shades of grey. Design 3 : Maze Runner Robot Completes a non pre-defined maze. Possible Methods of attack: Trial and error (Try-Bump-Stop). Sonar.

Design Evaluation A standard weighting scheme was generated through close analysis of the proposed design goals and criteria. To further refine the weighting metrics, a Criteria Prioritization Questionnaire was completed by the projects acting supervisor: Dr. M. McGuire. Each of the top 3 designs for both the cart and task categories were then individually and independently evaluated by each team member. These independent evaluations were summed, averaged and had the appropriate category weighting metric applied. The final weighted rankings were compared with the highest being taken as the design which best fits both the assumed and department defined project goals and objectives.

Evaluation Results DesignCostOperationTotal Moe LS Navigator Flying Wedge DesignCost Hot Spot Line Snoop Maze Runner Ease of construction Footprint Complexity of Mechanical and Electrical systems Programming complexity Additional base cart costs Additional sensor costs Number of tasks completed Ease of detection Requires prioritization Arena complexity Arena re-usability Difficulty of point location change Uses recycled parts Construction costs Value per dollar spent.

Final Cart Design Modified version of the LS Navigator. Offers good balance between mechanical electrical complexity and experience Moderate build time – Between 1 and 2 hours Zero additional VEX parts required for cart construction Small form factor fits inside provided equipment case Versatile design based off of an existing standardized VEX robot.

Final Point of Interest Design Hot Spot Locator Low cost Simplistic design Offers a range of complexity Low costs associated with task changes Varying levels of system complexity available

Summary Three leading designs were created for cart design and point detection. Based on a weighting algorithm that incorporated a number of aspects such as cost, feasibility, and function, a final decision was made for cart design and point detection method.

Future Works (499 continuation) Generate prototype designs Generate prototype designs C-code template C-code template Testing Testing Arena specifications and design Arena specifications and design Instruction Manual outlining building design and tasks to be performed Instruction Manual outlining building design and tasks to be performed

Questions ?