ITRS AMC Roadmap Project Plan : AMC Integrated Concept

Slides:



Advertisements
Similar presentations
1 Feb19, 2003 ITRS 2003, Sunnyvale, Ca ITRS Conference April 3-4, 2003 Amsterdam, Netherlands ITRS 2003 Yield Enhancement TWG Attendees: Mike Retersdorf.
Advertisements

Grenoble, France1 Work in Progress – Not for Publication April 26-27, 2001 ESH ITWG 2001 ITRS Status Update.
ITRS Test TWG Don Edenfeld April 20 th, 2004 Spring Workshop - Stressa, Italy.
Work in progress Do not publish or distribute ITRS Factory Integration (FI) Update Public Conference Gopal Rao Factory Integration Chair July 2011 San.
1 DRAFT - NOT FOR PUBLICATION April 5-7, 2006, Maastricht ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006 Lothar Pfitzner, ,
2008 ITRS Public Conference San Francisco, USA 1 DRAFT – DO NOT PUBLISH ITRS Factory Integration Shige Kobayashi, Tom Jefferson July 2008 San Francisco,
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
ITRS Factory Integration Presentation
1 Noordwijk April 23-/ April 2012 Summary for Plenary Abraham Arceo (Sematech) Arnaud Favre (adixen) Herve Fontaine (CEA Leti) Guillaume Gallet.
Introduction to Integrated Library Systems
Intuitive Design Inc. New Product Development Progress March 25, 2006 Prepared for: Company Management Team Dave Leis.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
July 11 th, 2005 Software Engineering with Reusable Components RiSE’s Seminars Sametinger’s book :: Chapters 16, 17 and 18 Fred Durão.
Session 7 Page 11 ECE361 Engineering Practice Brainstorming, Trades, Evaluation, and Conceptual Capture.
Measures Definition Workshop
Multi-Agency Radiological Laboratory Analytical Protocols Manual: MARLAP Presentation to the Radiation Advisory Committee/Science Advisory Board April.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Enterprise Architecture [Product Name] [Enterprise Architect] [Discipline and Names] To-Be Powerpoint Presentation v
Michael Webster (Cameco Corporation) Tamara Yankovich (IAEA, Formerly Saskatchewan Research Council) Martin Klukas (Atomic Energy of Canada Limited) IAEA.
Nodal Education Initial Staff Concepts 11/30/05. Agenda Integrated Approach Roadmap and Processes Curriculum Development ERCOT Education Advisory Council.
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
HL7 Coordination of Care Services Project April 14 th, 2014.
Session 2: Developing a Comprehensive M&E Work Plan.
CPMGT 300 Week 3 Learning Team Planning Process Groups and Developing the Scope Check this A+ tutorial guideline at
Requirements Determination
Working in Groups in Canvas
SEMI 300mm Equipment Standards Overview E39, E40, E84, E87, E90, E94, E116 Mike Baxter INTEL CONFIDENTIAL.
Project Management Processes
Workshop format and scope Expected write-up's Follow-up actions
TIM 58 Chapter 3: Requirements Determination
IEEE Std 1074: Standard for Software Lifecycle
Review of integrated PSM resources and tools and introduction to group work Upjeet Chandan ICCM FTT 17th February 2016.
Cryogenic assisted machining
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
ENGM92 Communication Unit 3
Next steps.
DG Environment, Unit D.2 Marine Environment and Water Industry
209: Visitation: The Heart of Permanency Planning
JRC’s Follow-up work to improve GES assessment
A Unifying View on Instance Selection
Daughter Groundwater Directive
European Equipment Automation Committee
Joao Dinis, EMAC (Cascais Pilot Coordinator)
WP 2: Align / synchronise progress reporting under both directives
North America Physical Interfaces & Carriers Committee
ITRS 2003 Factory Integration Chapter Backup Material
ESS Vision 2020: ESS.VIP Validation
Progress Works, recommendations and future work programme
North America Physical Interfaces & Carriers Committee
European Equipment Automation Committee
European Equipment Automation Committee
Project Management Processes
Two main areas identified
KEY DATES: Comments Due: February 20
NERC Reliability Standards Development Plan
Activity on WFD and agriculture
NERC Reliability Standards Development Plan
MIG-P orientation debate
Session 1: The report on CIS-members´ views on the experience in the implementation of the economic aspects of the WFD.
Education and Training Statistics Working Group, May 2011
Standards Development Process
9th meeting of the Expert Group on Reporting (22 March 2011)
Stuart McAllister ESTAT F4
Monitoring Biodiversity in Protected and
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
SCG May 2005 CIRCA review.
Objectives Socialize the potential change in Acquisition Strategy for the Contract Acquisition Lifecycle Management (CALM) system Discuss high level industry.
TCP Maintenance and Minor Extensions (TCPM) Working Group Status
Presentation transcript:

ITRS AMC Roadmap Project Plan : AMC Integrated Concept ITRS / WECC /TWG AMC/crosscut issue FI First proposal : Spring meeting April-2010 Follow up with FI May-26-2010

Outline Problem statement Changes/additions in Red Bold Problem statement Current Situation....problems, examples of AMC issues exeprienced by waferfab First assumptions from ITRS AMC Project coordination with FI Next steps Others: waste reduction matrix

AMC Integrated Concept

Problem statement Foup could act as contamination reservoir and distributor for contamination ; Foup = Fab interface for: - AMHS Tools; loadports Minienvironment Wafer surfaces with different outgassing potential and interactions to other surfaces - Foup characterization and monitoring becomes more important New approach: Introduction of new foup materials (FM4911) Lack of standards/methods for defining Foup – and Foup cross contamination (SEMI) - High costs for non standardized tests @ IDMs

Status and proposal for next steps Description of different interactions /interfaces between Foup and environment Defining of reliable monitoring methods for chemical compounds in regards to YE7 table -Literature research; collecting most detrimental effects and compounds -Implementation of particle cleanliness requested ? Methods to be tested / proofed (eg . ISMI project ?) Project coordination with FI;contribution of FI -First meeting held March-10-2010 -Input received from FI- refer to meeting minutes from Patrick -Team formation i

Goal Definition of interfaces and monitoring strategy in regards to Foup: Introduction of acceptance criteria in ITRS table ( YE; YE7) Introduction of extra line for „Foup environment“ in ITRS table YE7 Definition of Potential solutions and countermeasures-eg.: ( needs to be discussed with FI ) -Cleaning methods -Purging options -Degas chambers -Addressing development of improved Foup materials ( non-absorbing) Development first draft for method description; time line in dependency of discussion /outcome with FI i

Define working group /Team Member WECC / AMC: Christoph Hocke- INFINEON Arnaud Favre – ADIXEN Andreas Neuber – AMAT Michael Otto - FHG Astrid Gettel - Globalfoundries FI: Will follow soon i

First proposal: Description of Interactions: Foup < - > wafer A.Favre

First proposal: Description of Interactions: Foup < - > wafer A.Favre

First proposal: Description of Interactions: Cleanroom air -> Foup Proposal TWG AMC: Chr.Hocke/INF

First proposal: Description of Interactions: Cleanroom air -> Foup Proposal TWG AMC: Chr.Hocke/INF

First proposal: Description of Interactions: Cleanroom air <-> wafer inside Foup Proposal TWG AMC: Chr.Hocke/INF

First proposal: Description of Interactions: Memory effects (based on Foup material) Proposal TWG AMC: Chr.Hocke/INF

Collection of measuring methods = f {compounds, wafer/or foup based etc….} Proposal TWG AMC: M.Otto/FHG

Input FI from first meeting 03/09/10

Input FI from first meeting 03/09/10

Input FI from first meeting 03/09/10 Get packet packet together to send to the wafer fabs…. Get a list of waferfab….to poll Get participation Get data Bottleneck….get some university…neutral participation….. ….get more inform from the ye group…. Next Steps: Arnaud, Christopoh, and Patrick…make an input to the pack… Next meeting 2-3 weeks….

Backup

Project plan: AMC (Integrated) Concept Proposal TWG AMC: Interactions Contermeasures Fresh processed wafer <-> FOUP - outgassing fresh processed wafers -> degas chamber; tool supplier tool supplier ; FI - Loadlock? Purge FI b) FOUP <-> wafer - fresh FOUP - as-used-FOUP - cleaned FOUP Carrier supplier : Deployment of nonabsorbing materials –no interactions wafer –carrier material c) FOUP <-> ambient Cleanroom d) ? ambient cleanroom MENV/Filter FOUP Tool environment for processing wafer LP FOUP

AMC Integrated Concept : Different interactions / interfaces

Project plan:AMC(Integrated) Concept v. good Focus area

Next steps 2. Collection of different measuring methods = f - Chemical species in acc. to YE9 table - Online /offline method - Detection limit - Referring to Literature ……?! Next steps: - Justification/Evaluation of methods - Concentration only on already known detrimental chemical compounds ( too much datas); needs to be defined