The Proton Beam for the neutron Time Of Flight facility

Slides:



Advertisements
Similar presentations
LHC Injection in 07 “Summer MD-Planning” Milorad Popovic.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Elias Métral, COULOMB’05, Senigallia (AN), Italy, September 12-16, /29 OBSERVATION OF OCTUPOLE DRIVEN RESONANCE PHENOMENA WITH SPACE CHARGE AT THE.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
High Intensity Beams Issues in the CERN Proton Synchrotron S. Aumon EPFL-CERN Aumon Sandra -PhD Defense1.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
June 10, 2003Midwest Accelerator Physics Meeting, June 10-11, 2003, ANL 1 Several Topics in Recent Accelerator Studies Weiren Chou Fermilab June 10, 2003.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
CERN Test Beam Update and Schedule
Collective effects in EDM storage ring A.Sidorin, Electron cooling group, JINR, Dubna.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
INTENSITY LIMITATIONS IN THE LHC INJECTORS Discussion on Landau damping Ibon Santiago González Summer Student Session 2007.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
Elias Métral, LIS meeting, 29/01/2008 1/26 GAMMA TRANSITION JUMP FOR PS2 W. Bartmann, M. Benedikt, E. Métral and D. Möhl u Introduction with the case of.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
HEADTAIL simulation during the accelerating ramp in the PS S. Aumon - EPFL & CERN Acknowledgement to B. Salvant, G. Rumolo.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
LIU-PS Beam Dynamics Working Group Introduction and objectives
Longitudinal impedance of the SPS
TMCI Observations in AD
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Elena Wildner CERN CA15139 Meeting, Sofia 15/
Michael Benedikt AB/OP
Invited talk TOAC001 ( min, 21 slides)
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Elias Métral for the BLRWG ( min, 21 slides)
CSP Meeting CERN CERN Accelerators in th November 2010
Progress towards Pulsed Multi-MW CERN Proton Drivers
Limits on damping times
The LHC25ns cycle in the PS Triple splitting after 2nd injection
potential CERN facilities to study proton-driven plasma acceleration
STABILITY OF THE LONGITUDINAL BUNCHED-BEAM COHERENT MODES
W. Bartmann, M. Benedikt, E. Métral, D. Möhl, G. Rumolo and B. Salvant
Present and Future test facilities for High-intensity Targetry CERN
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Status & performance of the LHC (proton) Injector Complex
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
How to control the local beam density
Simulating transition crossing in the PS with HeadTail
STABILISING INTENSE BEAMS
Observation of Transverse Mode Coupling Instability at the PS and SPS
Collective effects in the SPS and LHC (longitudinal plane)
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
Presentation transcript:

The Proton Beam for the neutron Time Of Flight facility Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP

Geometry and optics of the transfer line Beam size on target (at 1 ) h = 12 mm v = 6 mm Beam at PS extraction (at 1 ) h = 1.9 m v = 1.3 m p/p= 1.5e-3 Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP Courtesy of M Giovannozzi

Two operation modes Dedicated (TOF 1.2s) Parasitic (EASTC 2.4s) Ejection for nTOF 20 Gev/c (C690) Dedicated (TOF 1.2s) 7e12 ppp fast extracted on TOF target Parasitic (EASTC 2.4s) 4e12 ppp fast extracted on TOF target 1e11 p+ slow extracted on EAST area Ejection for East Hall 24 Gev/c (from C1000) Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP

Difficulties Qh at low energy (6.1) Bunch compression 200 ns Qh at low energy (6.1) emittance blow-up Bunch compression rotation counter-rotation Beam Break-Up at transition 46 ns 4 ms 23 ns I peak ~ 70 A Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP

Beam Break-Up or TMC For nTOF: (as observed) Two stabilising methods The rise time of the TMC instability is given by Paper to be published on BBU & TMC unification For nTOF: WB PU in S98 , H, V (as observed) Two stabilising methods Synchrotron oscillation Strong Landau damping by momentum spread fast change large 10 ns/div ~ 700 MHz Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP

Conclusions The dedicated and parasitic beams were successfully set-up by the end of 2000 nTOF operation starts this year Acknowledgments Colleagues of the OP, AE, BD & RF groups for their help and particularly to Elias, Massimo and Roberto. Evian - PS Days 24-26January 2001 Gabriel Métral PS/OP