BA250 MANAGEMENT SCIENCE EXAMPLE PROBLEMS

Slides:



Advertisements
Similar presentations
Chapter 3: Linear Programming Modeling Applications © 2007 Pearson Education.
Advertisements

Managerial Decision Modeling with Spreadsheets
Marketing Applications: Media selection
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Prentice Hall Modeling and Optimization Section 4.4.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Prentice Hall 4.4 Modeling and Optimization.
תכנון ייצור חברה הפסיקה את קו ייצורו של אחד ממוצריה הלא רווחיים. בעקבות כך נוצרה אפשרות לייצור נוסף של התוצרים האחרים (עודף ייצור). לפיכך ההנהלה רוצה לנצל.
Operations Management
Learning Curve Analysis
1 1 Slides by John Loucks St. Edward’s University Modifications by A. Asef-Vaziri.
Slides by John Loucks St. Edward’s University.
Who Decides Wage Rates?. WHO DECIDES WAGE RATES? 0 OBJECTIVES 0 Students will be able to: 0 Explain how sellers of labor and buyers of labor interact.
1 1 Slides by John Loucks St. Edward’s University Modifications by A. Asef-Vaziri.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
BA 452 Lesson A.8 Marketing and Finance Applications 1 1ReadingsReadings Chapter 4 Linear Programming Applications in Marketing, Finance, and Operations.
CHAPTER 11 Input Demand: The Capital Market and the Investment Decision © 2009 Pearson Education, Inc. Publishing as Prentice Hall Principles of Economics.
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Copyright © 2015, 2011, and 2007 Pearson Education, Inc. 1 Chapter 6 Payroll Section 1 Gross Earnings: Wages and Salaries.
Managerial Decision Modeling with Spreadsheets
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Section 4.1 Linear Functions and Their Properties.
Unit 4 Determining Gross Earnings McGraw-Hill/Irwin Copyright © 2006 The McGraw-Hill Companies, Inc. All rights reserved.
MANGT 521 (B): Quantitative Management
MANGT 521 (B): Quantitative Management
4-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Linear Programming: Modeling Examples Chapter 4- Part2.
Chapter 24 Human Resource Planning
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
BA250 MANAGEMENT SCIENCE EXAMPLE PROBLEMS
11-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Managing Economies of Scale in a Supply Chain: Cycle Inventory Role of Cycle.
Learning Curve Analysis Supplement I Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall I - 01.
Business in Action 6e Bovée/Thill Human Resources Management Chapter 11.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Section 4.1 Linear Functions and Their Properties.
SHOW ME The MONEY Just how much do you know about how people get paid? UNIT 3 TAXES AND BANKING.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Warm-up: Mental Math and Estimation
The Inverse Trigonometric Functions (Continued)
Linear Programming Models: Graphical and Computer Methods
Application Problem - Marketing
Operations Management
Section 9.1 Polar Coordinates
Section R.8 nth Roots; Rational Exponents
Building Exponential, Logarithmic, and Logistic Models from Data
12 Developing Pricing Strategies and Programs
Section 2.4 Circles Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Employees (thousands)
John Loucks Modifications by A. Asef-Vaziri Slides by St. Edward’s
Book value is one of the easiest numbers to arrive at.
Section 8.3 The Law of Cosines
Section 11.8 Linear Programming
Copyright © 2008 Pearson Prentice Hall Inc.
Copyright © 2008 Pearson Prentice Hall Inc.
Mathematical Models: Building Functions
Copyright © 2008 Pearson Prentice Hall Inc.
Copyright © 2008 Pearson Prentice Hall Inc.
Unit #1: Earning Income.
Slides by John Loucks St. Edward’s University.
Section 3.2 The Graph of a Function
Quadratic Equations in the Complex Number System
Module B Linear Programming.
Properties of Rational Functions
All Service-providing Industries
Day 27 ELC 310.
Copyright © 2008 Pearson Prentice Hall Inc.
Copyright © 2008 Pearson Prentice Hall Inc.
The Inverse Trigonometric Functions (Continued)
Exhibit 2.4 Percentage of Firms Offering Health Benefits to At Least Some of Their Workers, by Firm Size, 2016 * Estimate is statistically different from.
Understanding Benefits
Presentation transcript:

BA250 MANAGEMENT SCIENCE EXAMPLE PROBLEMS

Example 1 Labor Scheduling Arlington Bank of Commerce and Industry is a busy bank that has requirements for between 10 and 18 tellers depending on the time of day. Lunchtime, from noon to 2 P.M., is usually heaviest. The table below indicates the workers needed at various hours that the bank is open. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

Example 1 Labor Scheduling The bank now employs 12 full-time tellers, but many people are on its roster of available part-time employees. A part-time employee must put in exactly 4 hours per day but can start anytime between 9 A.M. and 1 P.M. Fulltimers, on the other hand, work from 9 A.M. to 5 P.M. but are allowed 1 hour for lunch. (Half the full-timers eat at 11 A.M., the other half at noon.) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

Example 1 Labor Scheduling By corporate policy, the bank limits part-time hours to a maximum of 50% of the day’s total requirement. Part-timers earn $6 per hour (or $24 per day) on average, whereas full-timers earn $75 per day in salary and benefits on average. The bank would like to set a schedule that would minimize its total man-power costs. It will release 1 or more of its full-time tellers if it is profitable to do so. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall

Example 1 Labor Scheduling Time Number of Time Number of Period Tellers Required Period Tellers Required 9 AM - 10 AM 10 1 PM - 2 PM 18 10 AM - 11 AM 12 2 PM - 3 PM 17 11 AM - Noon 14 3 PM - 4 PM 15 Noon - 1 PM 16 4 PM - 5 PM 10 F = Full-time tellers P1 = Part-time tellers starting at 9 AM (leaving at 1 PM) P2 = Part-time tellers starting at 10 AM (leaving at 2 PM) P3 = Part-time tellers starting at 11 AM (leaving at 3 PM) P4 = Part-time tellers starting at noon (leaving at 4 PM) P5 = Part-time tellers starting at 1 PM (leaving at 5 PM)

Example2: MARKET SURVEY Market Survey, Inc. (MSI), is a marketing firm that specializes in evaluating consumer research to new products, services, and advertising campaigns. A client firm has requested assistance from MSI in ascertaining consumer reaction to a recently marketing product for household use. During meetings with the client it was agreed that door-to-door personal interviews would be used to obtain information from both households with children and households without children. In addition, it was agreed that both day and evening interviews would be necessary in order to allow for a variety of household work schedules. Specifically, the clients contract called for MSI to conduct 1000 interviews with the following quota guidelines: At least 400 households with children would be interviewed. At least 400 households without children would be interviewed. The total number of households interviewed during the evening would be at least as great as the number of households interviewed during the day. At least 40% of the interviews for households with children would be conducted during the evening. At least 60% of the interviews for households without children would be conducted during the evening. Since the interviews of households with children take additional interviewer time, and since evening interviewers are paid more than daytime interviewers, the cost of an interview varies with the type of interview. Based on previous research studies, estimates of the interview costs are as follows: INTERVIEW COST HOUSEHOLD DAY EVENING Children $20 $25 No children $18 $20 What is the household, time-of-day interview plan that will satisfy the contract requirements at a minimum total interviewing cost?

Example 3: Production Scheduling Chip Hoose is the owner of Hoose Custom Wheels. Chip has just received orders for 1,000 standard wheels and 1,250 deluxe wheels next month and for 800 standard and 1,500 deluxe the following month. All orders must be filled. The cost of making standard wheels is $10 and deluxe wheels is $16. Overtime rates are 50% higher. There are 1,000 hours of regular time and 500 hours of overtime available each month. It takes 0.5 hour to make a standard wheel and 0.6 hour to make a deluxe wheel. The cost of storing a wheel from one month to the next is $2.

Develop an LP model to determine the regular-time, overtime production and inventory quantities in each month for standard and deluxe wheels so that total production and inventory costs can be minimized.