Health of Distribution Sector…

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

Current and Forthcoming Issues in the South African Electricity Sector Ioannis N. Kessides The World Bank.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Mini Grids in Asia Sameer Kalra Sept 30 th, 2010.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Exploring Energy Opportunities In India NABC Conference June 29, 2006.
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
2015 World Forum on Energy Regulation May 25, 2015
HARVEST GROUP Smart Grid Harvest Power Technologies 30 th Aug 2014.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
 Energy Conclave 2006 Energy and Sustainable Development July 2006.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
Natural Gas Shortages in Developing Countries Natural gas: The bridging fuel in the next decades Bent Svensson World Bank ENERGY WEEK 2006.
How to Achieve Universal Modern Energy Access by 2030? Hisham Zerriffi (UBC) Shonali Pachauri (IIASA)
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
The Smart Grid: A Brief Introduction Qinran Hu Ph.D. Candidate Jun 12 th, 2014 Knoxville, Tennessee.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
The strategy for improved electricity distribution maintenance 9 June 2008.
India. Agenda Introduction Industry Structure and Regulations In Power Other Initiatives in Power Industry Natural Gas Markets Privatization Initiatives.
A new impetus for Europe's energy efficiency policy Paul Hodson Head of Unit DG Energy, European Commission 09/10/2012.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
Optimizing Power Availability -- Action Plan for Next Decade Challenges of Distribution -- Investment and Reforms 1.
Moving Forward with Clean Energy Priyantha Wijayatunga Principal Energy Specialist, Asian Development Bank
1 DRAFT DO NOT CITE OR QUOTE For NPC Resource Study Discussion Only NPC Demand Task Force – Residential and Commercial Findings & Recommendations January.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
Conference on Infrastructure. Some facts  “To sustain economic growth of 9 per cent every year, India would need an investment of $475 billion during.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Access Investment Model (AIM)
EQ Conference Mumbai 22nd Feb 2017 Anjan Ghosh – Ujaas Energy
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
CLEAN ENERGY FOR ALL EUROPEANS
Global Energy Problems and Counter Policies and Measures of Korea
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
Market aggregating models – scaling an EE portfolio
Jon Sibley Director, Energy and Waste Policy
Karl Vella - EURELECTRIC
Chairman of the Board and CEO,
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Distributed Generation
Fiscal Analysis Division
CURRENT STATUS - ENERGY TRANSITION
Innovation and Energy Aleksander Śniegocki
Renewable Energy Sources for Energy Security – Solar Power
Presentation to Australian Business Economists
16th Renewable Energy Summit
Renewable Energy Development in India
Financing of Solar power plants
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
The Transition to a High DER Future
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Smart Grid Market to reach $70bn by 2024: Global Market Insights Inc.
Opportunities in the Changing Energy System
Challenges in Distribution
Energy, Finance, Partnerships: Transforming Clean Business
Reforming the Energy Vision in New York State
Challenges and opportunities on Islands’ decarbonisation
A Global Perspective on Greening the Transport Sector
Power generation in Sri Lanka:
REVIEW OF KENYA ENERGY MIX FOR SUSTAINABLE DEVELOPMENT
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Detail | Customise | Optimise
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Smart Grid Market
New X-factors: Rooftop solar and electric mobility
Presentation transcript:

Health of Distribution Sector… Nov’17 India Energy Forum Gopal Saxena BSES Delhi Health of Distribution Sector…

Reality Check… AVAILABILITY POWERLESS AREAS Daily Load Shedding Unplanned Outages ...norm in large parts of country …1% Peak Shortage (YTM Sep’17) ( Ground Reality ???) Ahmedabad , Gandhinagar, Surat , Mumbai, Kolkatta… AFFORDABILITY ACCESS Distribution contributes 80% of losses FRPs failed to curb financial mess of state discoms “Rampant Power Theft” - plaguing society at large ‘Ability to Pay’ still driven by the Purchasing Power Parity (PPP) Areas without electricity Electrified areas with high New Connection pendency Unelectrified Villages ~260million people w/o electricity SEBs surviving on Govt aid/ subsidy  ~800 million Indians use traditional fuels for cooking /general heating needs  80 billion KWh generated by DG sets annually (~15 million tons of diesel oil) Source : World Wide Web

State Board Performance… 90% of DISCOMs are with State Governments; majority are: high on losses & costs higher on tariffs & heavily subsidised low on Operational Efficiency , n/w reliability.. minimal adherence to SOPs / Supply Codes & 24X7 Supply lack innovation for customer convenience Privatisation has shown commendable operational improvement despite this NO Privatisation (PPP) has taken place post enactment of the Electricity Act 2003 Future Of Distribution is Private / PPP Model built on transparency /good governance ....current model is riddled with disputes (Financial /Operational /Legal /Regulatory)

Challenges…

Discom Challenges [Internal] Financing & associated costs. Highly capital intensive Vicious Cycle trap (Operat’n Loss funded by high cost Debt) CAPEX prioritization Towards catering to New Demand Growth OR upgrading existing dilapidated legacy network. Human Resource / Skill Development: Highest Man : MW Ratio [Urban 1:5 ; Rural 1:10 ] Resistance to change / Industrial Unrest / Union Activity Absence of Training programs for all levels towards more technological advances Lack Of Innovation : “Distribution: Weakest link with least focus on R&D / Innovation” Piece meal Development : Equipment / Meter/ IT Upgradation instead of complete turnaround Full / Partial Cost Disallowances - Risk to be borne by the discoms/ promoters / developer. Most empirical performance ratios out of line

Discom Challenges [External] Electricity Tariff: Socio-political sensitive issue. Domestic / Agriculture tariffs heavily subsidised. Optimizing REAL COST of Power : Efficient & progressive Discoms battling with burden of high cost PPAs instead of being allowed to renegotiate existing Societal Environment : Theft Control – high community resistance with minimal political/ police support . Land Usage – minimal Policy framework for n/w extension Regulatory Environment : Unrealistic , Inadequate & non-cost reflective tariffs The “projection-based” Return, has a book-entry while in actual, the deficits keep on mounting. Overlooking / Defiance of the statutory orders (ATE/HC/SC) by the state regulator. Strong disconnect between CERC & SERC thereby weakening discom & hence sector as a whole. Policy discriminating between Public and Private DISCOMs, benefitting end consumers

Parity with Generation / Transmission Reduce Disparity Across the Power Chain

Per Capita Electricity consumption Aspiration ~2000 kWh / capita by Yr 2024 Per capita annual electricity consumption (kWh, 2015) 1075 kWh / capita in Yr 2016 Required Investment Rs ~30* lakh Crs 1/3rd of Global Average Increase @ 6% CAGR in the last decade At Rs 10 Cr/MW (6 Cr Gen. capacity, 1.5 Cr X’mission, and ~2.5 Cr Distribution CapEx - smart meters, etc.) Source : Wold Wide Web

Demand Revival …. Getting UDAY on track on Operational Issues - Post 2019, tariff fixation to be based on UDAY targets; & states to provide adequate subvention for any AT&C losses above the targets Pradhan Mantri Sahaj Bijli Har Ghar Yojana – “SAUBHAGYA” Rs 16,320 cr towards electrification over 40 million households (urban/rural) by Dec’18. Will add to additional generation / transmission costs… Incentivizing consumption for Industrial / Commercial category Discourage Diesel Gensets for Power backup ….Estimated 72 GW of DG based capacity installed is at prohibitive costs Demand Revival is imperative to absorb the Idling capacity, and to avoid build-up of Non-Performing Assets

When Discoms do well, entire power sector would do well… Future Road Map When Discoms do well, entire power sector would do well…

? How to bring reforms towards Improving ..... The Electricity Act (Amendment) Bill -2014 ? How to bring reforms towards Improving ..... Accessibility Affordability Regulatory Availability

Future Vision ... Compacting & Miniaturization of Network / equipments - lighter structures / enhanced properties. Processes : simplified & transparent Digital Technology (Data / Information) Management & Integration driven towards added value for customers through convergence of sensors /communication with household equipments & everything else connected. Clean Energy / Distributed Generation with more effective storage : for remote electrification, load flattening & distributed load controls. Reliable Operation/ Improved Grid Efficiency with Regulatory Support : Meeting market demand with “lowest total cost” (Capex & Opex) Cost reflective retail tariffs, linked with voltage wise cost of supply and differential tariff (peak, normal, off-peak hours) Minimized negative externalities - environmental impacts, greenhouse gas emissions etc. Project based initiatives : Rooftop Solar, Smart Grid, Internet of Things (IoT), Cognitive Analytics- self learning feedback loop, Smart Metering etc

Future Business model.... NETWORKED MODEL Integrated ecosystem of unique elements that are highly interrelated, notwithstanding the specific focus of these individual elements Need to focus on extending beyond independent views of each value chain element into a more integrated view of how these elements can interact with each other in the future. Non-traditional entrants will need to determine how they interact between incumbents and customers in a manner that does not ‘island’ assets or ‘diminish’ customer relationships. More Stakeholders.. ….More interconnections …More conflicts than ever before...

Thank You

A Mixed Bag of Discom’s Performance !!! UDAY … A Mixed Bag of Discom’s Performance !!! Background: biggest financial engineering exercise of its kind carried out in the market. 26 States & 1 UT signed up. Simply put, State governments that accede to this scheme take over 75% outstanding debt of discom; balance is restructured by lending institutions can also get the backing of a State guarantee. Future losses of discoms to be progressively borne by State governments’ budgets; provided - discom has to meet certain performance metrics (pricing / losses etc). Objective: AT&C loss target - 15% / ACS - ARR gap target - zero Status ** Bonds Issued: 2.3 lac crs (86%); AT&C: 21.5% ; ACS-ARR Gap Rs 0.35/unit ; Tariff Revision: 25 of 27 Only three states could beat their target for Loss Reduction (Goa, Gujarat and Rajasthan). Improved efficiency, however, hides under-performance by several states. Only four States could beat the ACS- ARR gap target (Gujarat, Haryana, Himachal Pradesh & U.P.). Performance on gap (Costs and Realisation) marginally better. States allowed issuing non-SLR state development (SDL) bonds in the market or directly to banks or financial institutions holding the DISCOM debt. Due to these bonds, the state gross fiscal deficit ratio is up by 0.7 percentage points to 3.6 per cent in 2015-16 from 2.9 per cent without UDAY - Economic Survey, Volume II Post 2019 tariff fixation should only be based on UDAY targets; and states should provide adequate subvention for any AT&C losses above the targets **Source : Uday portal) : Progress shown above is as per data provided/ entered by respective State Utilities.