8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Tuesday 22nd January - morning
LHC Morning Meeting - G. Arduini
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Wednesday 31 October: Morning
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Sunday morning Recovering from 400 kV disturbance.
Friday 14th December - morning
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Monday 3rd September - morning
Saturday 3rd November - morning
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Another Immortal Fill….
Tuesday Access…. QPS intervention at 09:00 in point 8 (quench heater exchange) QPS installation oscillo for the ISRM measurement EPC intervention in point.
Monday 10th December - morning
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
Monday 152 bunch operation summary
Presentation transcript:

Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B1 31-10-12 LHC status

Tuesday 30th October - morning 07:50 Access to PM56 (EPC & RP) 08:30 EPC exchanged an output module on IT.R5 08:40 precycle triplets 09:35 injecting probes 11:15 no beam from LINAC2 – back after 15 minutes vacuum interlock (sector valve closed) 12:40 Stable beams Fill 3240 Initial luminosity: 6.95e33 cm-2s-1 31-10-12 LHC status

Tuesday 30th October - afternoon 13:10 Lost RQS6.A67.B1 (but keep beam) Valerie: trip of auxiliary power module (due to radiation) – access required – we live without it for the moment 14:06 beams lost to QPS trigger on RQ5.L1 Fast Power Abort of main circuit, contact MPE for analysis and re-arming; heaters discharged RQ4.L1B1/2, RQ6.L1.B1/2 and RD2.L1 tripped as well Fill 3240: 32 pb-1 in 1h28m 14:45 MPE give green light to reset S81 circuits Pre-cycle 16:00 Give ADT team ~1 hour for adjustments (see over) 31-10-12 LHC status

Tuesday 30th – Weds. 31st October 18:10 Injecting physics beam 19:35 Stable beams – fill 3242 Initial luminosity: 7.04e33 cm-2s-1 00:04 Beams lost – RF trip Line4B1 – driver fault RF power piquet gives OK to restart Fill 3242: 84 pb-1 in 4h30m MKI8 C up – a little over limit – outlier 01:30 Filling 02:00 MKI8 faulty Vacuum spike on VGPB.138.5R8 Reset (Jan) and extended softstart 31-10-12 LHC status

Weds. 31st October 04:15 Stable beams fill 3244 Initial luminosity: 7.34e33 cm-2s-1 06:26 Beam lost – QPS – RQ4.L1 QPS trip on RQ4.L1 that took the whole powering subsector with it, even losing CS and CM for a while. Spurious self-trigger of heaters Fill 3244: 50 pb-1 in 2h14m Prepare for access in shadow of fibre optics cable move and SPS EDF intervention (which started at 08:00 on schedule) 31-10-12 LHC status

Access now A. Anthoine and N. Voumard for LBDS beam 2. EPC for RQS.A67B1 and possibly others (to be verified with Valerie). Vacuum: l’alimentation de pompe ionique au point 6 est à changer la vanne du point 8 qui ne se ferme pas, une intervention doit avoir lieu sur place pour le diagnostic TI – a couple of urgent interventions 2-3 hours followed by pre-cycle 31-10-12 LHC status

ADT adjustments Summary of ADT adjustments for high-bandwidth and 50 ns beam: With high bandwidth ADT settings checked the fine delay with 50 ns bunch spacing and made the required adjustments. Verified damping time with Qkicker at injection level 450 GeV and with high gain. Estimated damping is 15 turns, i.e. equal to standard bandwidth settings. More details in RF logbook. Comparison in collision of high and low bandwidth settings can be tested in a future fill by switching during the fill between the settings. Wolfgang and Daniel. 31-10-12 LHC status

ADT tests 1) Pilot shots with high sensitivity for coupling measurements by Tobias Persson with damper loop off 2) BBQ check with pilot beam with damper loop off (but level 3 on) with switch from BI open and closed to identify if a 8 kHz perturbance comes over the cable from BI to us (as seem during the weekend in BBQ tests), our electronics in high sensitivity mode 3) check of delay and damping time for the high bandwidth settings; this needs more beam than a pilot, 6 nominal bunches and a check with a full batch. With a circulating batch we would also compare the noise levels for high bandwidth and standard settings. 1) and 2) are relatively short and can easily be combined, 3) needs a bit more time Wolfgang/Daniel 31-10-12 LHC status

TCL scans This week we would like to perform TCL scans in stable beams, combined with cryogenics measurements in the magnets of the matching sections of IR1 and IR5. We have done similar scans in the past and they can be done parasitically during stable beams. Ideally, I would like to perform an initial test toward the end of one fill, and then repeat it one/two times with higher luminosities. The basic idea is to open the TCL's and monitor the additional heat loads on the cryogenics system. This work is also going to be useful for the TOTEM Roman pot insertions. Stefano Redaelli 31-10-12 LHC status

First 6 bunches in the ramp 31-10-12 LHC status

Bunch length 31-10-12 LHC status