Online DAQ Code Tutorial

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Endcap Trigger Emulation Xin Wang. 2 FEE DSM0 DSM1 DSM2 720 towers 90 trigger patches 12 ‘half’ jet patches 0.3x1 or 0.6x1 2 endcap halves Raw ADC from.
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
Takeo Higuchi Institute of Particle and Nuclear Studies, KEK; On behalf of COPPER working group Jan.20, 2004 Hawaii, USA Super B Factory Workshop Readout.
STaRBoard Jamal Rorie 5/09/06. Data Collection TDC Leading Edge Lo Level Discriminator Mean Timer 1:3 Splitter ADC Leading Edge Hi Level Discriminator.
Trigger-less and reconfigurable data acquisition system for J-PET
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Mott DAQ Speed December 18, How to speedup DAQ I.Reject low-energy electrons before reaching DAQ: 1.Increase E-detector hardware threshold 2.Vetoing.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Rl/ic/ukdmc cPCI - DAQ for NaI Crystals. rl/ic/ukdmc DC MS/s (*) Sampling Rate simultan. on all channels 150 MHz (*) Bandwidth 128 kpoints per.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Sound DirectMusic & DirectSound. Sound Formats Wav Midi (Musical Instrument Digital Interface) DLS (Downloadable Sounds) DirectMusic Producer Segments.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
Data-Acquisition Systems for Neutron-Induced Cross- Section Measurements at TUNL J.H. Kelley 1, A. Hutcheson 2, C.T. Angell 3, G. Rusev 2, A.P. Tonchev.
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
R&D for single gap -Use the HARDROC ASICs, SiGe technology (well tested and available) HARDROC : 64-channel, 2-bin readout (3 comparators, 3 thresholds),
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
General: # miniRODS # gains # samples # FIFO pairs EMEC data will contain (in whatever format …) things like: For each event: FIFO channel pattern miniROD.
ACS on VxWorks B.Gustafsson European Southern Observatory ESO Feb ESO.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
"North American" Electronics
CALICE Readout Board Front End FPGA
Baby-Mind SiPM Front End Electronics
ECAL Front-end development
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Data Aquisition System
KRB proposal (Read Board of Kyiv group)
Ewald Effinger, Bernd Dehning
Summer 2000 HF Beam Test. DAQ proposal.
FIT Front End Electronics & Readout
FORWARD CARRIAGE UPDATE – March-July 2015
Hideyuki Sakamoto CM22, RAL 19/10/08
Muon Recording Studies and Progress for the MICE Tracker
Slot number is not critical. Traditionally, Slot 2: ADC,
Online/Offline Analysis Code Tutorial
Mott DAQ Speed February 16, 2015.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
DEVELOPMENT OF A TOF-PET PROSTATE PROBE READOUT SYSTEM
ms vısual studıo 2008-Introductıon TUTORIAL
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Mott DAQ Timing R. Suleiman February 12, 2014.
TOP for g4superb Geometry 18 TOP modules Support structures
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
ZDD status BESIII Collaboration Meeting, September 2012
Preliminary tests and results on the TDC
Presentation transcript:

Online DAQ Code Tutorial Readout Online DAQ Code Tutorial Kevin Carnes 2/12/2018

C1290EventSegment.cpp – V1290N TDC Makefile – Linux file for compiling CCAENEventSegment.cpp – V785N ADC rdstart – Script for starting Readout CV560Scaler.cp – V560N Scaler Skeleton.cpp – Base file to define modules

Threshold for ADC. -1 means all inputs. 7 in units of 16 channels=126. Allow time for ADC to digitize after TDC trigger.

Names of *.cpp files included in Readout code.

Trigger TDC ADC Seconds between scaler reads.

aronline@ampere:~/argroup/Ringbuffer/COLTRIMS2/Readout$ ./rdstart