Inconsistencies in Comparison Criteria

Slides:



Advertisements
Similar presentations
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Advertisements

Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /222r3 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /702r0 Submission September 2003 Adrian Stephens, Intel CorporationSlide 1 Report of High Throughput Usage Model Special Committee.
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Doc.: IEEE /223r0 Submission July 2000 Taylor Salman, Opnet TechnologiesSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /XXXr0 Submission May 2004 Masahiro Takagi and Tomoko Adachi, TOSHIBASlide 1 Simulation Scenarios and Comparison Criteria for Coexistence.
Doc.: IEEE /1366r3 Submission November 2013 Laurent Cariou (Orange)Slide 1 Some propositions to progress towards the PAR definition Date: 2013-xx-11Authors:
Dense apartment building use case for HEW
TGn Chair’s Status Update
History of s Standardization
Application Characteristics for HT Usage Scenarios
Proposed wording revisions to HT PAR Wednesday, March 12, 2003.
Comments on HT PAR & 5 Criteria
VHTL6 task group work plan proposal (VHTL < 6 GHz)
Evaluation Criteria and Traffic Models Status Update
Interworking Study Group Justification
Proposed basis for PAR discussion
Supporting Document for TGac Evaluation Methodology
Requirements Discussion
<month year> doc.: IEEE <030158r0> March 2004
Below 6GHz 11vht PAR scope and purpose discussion
Below 6GHz 11vht PAR scope and purpose discussion
Stephen McCann, Siemens Roke Manor
HT SG PAR Proposal Colin Lanzl Aware, Inc.
On High Efficiency WLAN (HEW) TG PAR Scope
Some propositions to progress towards the PAR definition
Proposed PAR and 5 Criteria for High Throughput Task Group
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Applications and requirements for mm wave.
Some propositions to progress towards the PAR definition
TGn Overview Portland, Oregon, US July 2004
Remaining incoherence in Comparison Criteria
How to Describe ax Functional Requirements
Evaluation of the saturation of the 5GHz band
Application parameters definition for usage models
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Applications and requirements for mm wave.
Evaluation of the saturation of the 5GHz band
Usage Scenarios for ESS Mesh Network
Adrian P Stephens Chair, FRCC
TGn FRCC Jan 2004 Report Adrian P Stephens
TGn FRCC Report March 2004 Adrian P Stephens Chair TGn FRCC
TGn Closing Report November 2003
TGn FRCC Jan 2004 Report Adrian P Stephens
Updates to TGn FRCC Documents
Proposal for HT PAR Title, Scope and Purpose
The need and complexity of in-home entertainment scenario with OBSS
Proposed text for HTSG draft PAR and 5 Criteria
TGn Chair’s Status Update
Proposed text for HTSG draft PAR and 5 Criteria
for video transmission
Below 6GHz 11vht PAR scope and purpose discussion
Dense apartment building use case for HEW
Motion to a Start High Throughput Study Group
IEEE Comments on aq PAR and 5C
Selection Procedure for TGai
GEN ad hoc Summary - Sep 14 ‘07
Some propositions to progress towards the PAR definition
June, 2006 doc.: IEEE /xxxr0 June, 2006
TGn Overview Portland, Oregon, US July 2004
Below 6GHz 11vht PAR scope and purpose discussion
WLAN Overlay with 60 GHz Channels
Month 2002 doc.: IEEE /xxxr0 November 2003
TGn Closing Report Orlando , Fl, US March 2004
TGn FRCC Jan 2004 Report Adrian P Stephens
LC MAC submission – follow up
Proposed basis for PAR discussion
LC MAC submission – follow up
doc.: IEEE yy/xxxxr0 Date: September, 2019
Presentation transcript:

Inconsistencies in Comparison Criteria B.Jechoux, H.Bonneville Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Objective Highlight and resolve inconsistencies between Comparison Criteria (11-03-0814r25) and baseline documents (PAR and 5 criteria) H.Bonneville, B.Jechoux, Mitsubishi ITE

Nature of inconsistencies CC vs CC CCs vs PAR CCs vs 5Criteria H.Bonneville, B.Jechoux, Mitsubishi ITE

CC vs CC Environments applicable for system simulations Month 2003 doc.: IEEE 802.11-03/xxxr0 CC vs CC Environments applicable for system simulations  Market Requirements: QoS support and aggregate throughput are key metrics for Hot Spots and can not be ignored. H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

CCs vs PAR (1/2) TGn PAR clearly prioritised 3 environments: Month 2003 doc.: IEEE 802.11-03/xxxr0 CCs vs PAR (1/2) TGn PAR clearly prioritised 3 environments: “Initial usage models envisioned include hot-spot, enterprise and residential; others may be included” System performance comparison does not include key metrics (CCs 19 & 20) for Scenario 6 (hot-spot).  Performance evaluation for scenario 6 does not satisfy the PAR. H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

CCs vs PAR (2/2) TGn PAR targets new market segment : Month 2003 doc.: IEEE 802.11-03/xxxr0 CCs vs PAR (2/2) TGn PAR targets new market segment : “The purpose of the project is to improve the 802.11 wireless local area network (LAN) user experience by providing significantly higher throughput for current applications and to enable new applications and market segments.” CC19 (QoS applications support) is optional, while most of foreseen new market segments will require QoS support.  Optional CC 19 does not satisfy the PAR. H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Month 2003 doc.: IEEE 802.11-03/xxxr0 CC vs 5 Criteria TGn 5Criteria clearly states that the standard amendment shall address A/V applications “New usages such as simultaneous transmission of multiple HDTV signals, audio, and on-line gaming, will drive the need for higher throughput in the home” CC19 (QoS applications support) is optional for ALL Scenarios – Residential, Enterprise and Hot Spot.  Expectations of the 5 Criteria are not met if CCs do not require A/V traffic support. H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

A Quick and Clean fix 1) Include Scenario 6 in CCs 19 and 20 Month 2003 doc.: IEEE 802.11-03/xxxr0 A Quick and Clean fix 1) Include Scenario 6 in CCs 19 and 20 2) Make CC19 mandatory  Cost is negligible Requires no extra simulation (same as for CC18 and CC24) Some additional effort to compile results H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Motion Include Scenario 6 in CCs 19 and 20 and make CC19 mandatory. Mover: Bruno Jechoux Second: H.Bonneville, B.Jechoux, Mitsubishi ITE