Preparation of Components for the Mounting of

Slides:



Advertisements
Similar presentations
ITPA Avilla January 2008 © Matej Mayer Surface modifications and blistering of tungsten exposed in ASDEX Upgrade M. Mayer, M. Balden, S. Lindig, J. Roth,
Advertisements

Fusion Experiment WENDELSTEIN 7-X
The Direct Current (DC) Electric Motor
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
The Next Step SPACE ROBOTICS INITIATIVE TIM Robotic Assembly and Maintenance of Space Solar Power Facilities Red Whittaker The Robotics Institute.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
1 INTRUSION ALARM TECHNOLOGY DETECTION DEVICES. 2 INTRUSION ALARM TECHNOLOGY Detection devices can be either passive or active. Passive devices typically.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
ELECTRONIC IGNITION SYSTEMS
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
Eddy Current Testing This method is widely used to detect surface flaws, to measure thin walls from one surface only, to measure thin coatings and in some.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
Electrical Fundamentals Parts Technician First Period Material Identification and Calculations e.
Vadodara institute of engineering,kotambi NAME:NAFISKHANPATHAN(13ELEE181) BARIYA VIPUL(13ELEE182) PATEL AMIT(13ELEE180) BRANCH:EE-2 PPT OF EEE.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
PRINCIPLES OF OPERATION
Max-Planck- Institut für Plasmaphysik Device Assembly K.-H. Oelgemöller NCSX Engineers in IPP – Dokumentennummer NCSX.
Typical product developments and applications JF Daucourt Product Development & Quality Manager.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Quick Build - Mechanical The University of Memphis.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
UNIT 6 ELECTRICITY AND MAGNETISIM GLOSSARY. Circuit: A set of different components conected which allow the flow of a electrical current These are: a.
Max-Planck-Institut für Plasmaphysik 21 st IAEA Fusion Energy Conference, Chengdu, 16 – 21 October Experience Gained during Fabrication and Construction.
Zack Burchman Travis Gang Dana Geer Matt Seekins Faculty Advisor: Mike Rosen GMCR Contacts: Wade Hodge Paul Comey Jason King.
IPC Mounting Over Conductive Areas Metal-cased components shall be mounted insulated from adjacent electrically conductive elements. Insulation.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
Electric Energy Notes.
Tim Marker Discussion of Burnthrough Test Method for Aircraft Thermal Acoustic Insulation Blankets FAA Technical Center.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 7 PowerPoint presentation Supporting information.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Removing the VTPC from the VERTEX magnets
Eddy Current Inspection
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
SeaPerch Structural System
SeaPerch Structural System
Internal review of IR2 LEP cryostats (WP11/WP5) Close out session
Introduction to W7-X Coil Testing at CEA – Saclay, France
E3D: status report and application to DIII-D
Eric building the fin mount.
Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D Greifswald, Germany Main-Components of the Wendelstein 7-X.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
Common termination methods:
SeaPerch Structural System
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
Electric Energy Notes.
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Electricity and Magnetism
SeaPerch Structural System
US-LARP Task: IR Commissioning
Activity 1.3.1a Solar Hydrogen Automobile Assembly Guide
US-LARP Task: IR Commissioning
Circuits.
Prof. Anderson Electrical and Computer Engineering
Electric Machine Design Course
Presentation transcript:

Preparation of Components for the Mounting of Max-Planck-Institut für Plasmaphysik, EURATOM Association, TI Greifswald Preparation of Components for the Mounting of Wendelstein 7-X L. Reinke and the W7-X Team Coil preparation Add-on components are completed electric insulation sensors and cables header pads to coat the NSE-area reflection foil The components still require some completion works before they can be put together. The different components get an incoming inspection at IPP and then they are completed in the Component-Preparation for the assembly process. mark of depth for grinding Narrow – Support – Element installation of pad and pad frame burnishing the slide face to fix the reflection foil photogrammetry measuring points installation of sensors and cables Furthermore, tests and dimensional accuracy, inspection are accomplished threads surfaces fits mechanical rework to form tail ends through flow test of the conductor An important requirement for the success is the effective cooperation of the different divisions (AS – Assembly, QM – Quality Management, MC – Magnets & Cryostat, DC – Design & Configuration and EN – Engineering). 25th SOFT, Rostock, Germany, 15 – 19 September 2008