Barriers for Access to Accelerator Enclosures Barriers for Rigging the Westinghouse Rotor and Stator Photo of the Week E. Lessard Collider-Accelerator.

Slides:



Advertisements
Similar presentations
Basic terms and equipment
Advertisements

Welcome to Who Wants to be a Millionaire
PPE Personal Protective Equipment. PPE - Personal Protective Equipment n PROPER CLOTHING & DRESS IS REQUIRED IN THE MILL AT ALL TIMES n Coming From and.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Fundamentals of Cost Management Chapter 10 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
List and Search Grants Chapter 2. List and Search Grants 2-2 Objectives Understand the option My Grants List Grant Screen Viewing a Grant Understand the.
0 - 0.
Welcome to Who Wants to be a Millionaire
Working Safely in an Engineering Environment Element 3 - Apply safe working practices and procedures Page 2File ref:
Working Around/Under Loads
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Safe Work Practices WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Operations Management
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Safety Integrity Teamwork Excellence April 7, 2011 Forehead/Eye Laceration at B1244 Annex IRIS # S Classification: OSHA Recordable.
Locked Doors/Security PPE in Machine Shops Yale Machine Shop Death Proposed BNL Action Items E. Lessard Collider-Accelerator Department Take 5.
Brownfields the Need for Training. Steel Foundry Inc.
February 17-18, 2010 R&D ERL Edward T. Lessard R&D ERL Meeting Accelerator Safety Order (ASO) Requirements E. Lessard, Associate Chair for ESSHQ Collider-Accelerator.
DOE Electrical Assessment of C-AD: Inaccurate Electrical Panel Schedules Missing Knockouts Panel Modifications Picture of the Week Collider-Accelerator.
Module 14 Major Incident Management Module 14 Major Incident Management incident Problems in major and complex incident management Major incident management.
Proactive Safety Programs Save Money in a BIG, BIG, WAY! Presented by: Dobson Associates Human Performance Consultants.
Chapter 9 Capacity Decisions IDS 605 Spring 1999.
(Company) Induction. Policies These can be found on all notice boards and you must spend the time to read them. Company have the following Policies: Health.
Module 9 Confined Space.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 1 – Overview and Administrative Functions.
Site Safety Visitors Induction
4.1 Powers of 10.
Test B, 100 Subtraction Facts
Week 1.
1 United States Department of Labor Mine Safety and Health Administration Robert M. Friend Administrator Metal and Nonmetal Mine Safety and Health.
NEAR MISS SAFETY REPORT TRAINING DIVISION. The purpose of this Near Miss Safety Report is not to place blame, fault or be used for any disciplinary action.
1 Westinghouse Non-Proprietary Class 3© 2012 Westinghouse Electric Company LLC. All Rights Reserved. Structural Analysis of a Nuclear Fuel Handling Machine.
Applying Lean to EHS. Key Points 5 Principles of Lean Application within EHS Real World Value Results.
Credited Controls at C-AD Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
PHYSICAL SECURITY Attacker. Physical Security Not all attacks on your organization's data come across the network. Many companies focus on an “iron-clad”
HELP Accident Prevention Memory Tool. 2 FY2011 Injuries In short: TOO MANY! FY2011: 6635 total, 1410 Lost time cases. Just over 5.28% of the State of.
1 Module 1 Requirements for Flaggers This training is provided under Susan B. Harwood No. SH F-8. It does not necessarily reflect the views.
Systems of Safety Applied to Focus Four Hazards USDOL-OSHA Susan Harwood Grant SHT21005SH0.
Copyright  Progressive Business Publications New Employee Orientation.
General Industry Standards Personal Protective Equipment.
Be unobtrusive (avoid any interference with worker performance) Sample needs to be representative of the people and the work performed (e.g., demographics,
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
Eliminating and Controlling Dust & Noise Hazards July 2002.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
Job Safety Analysis (JSA)
The Future of Lafarge Remember, Safety First.
Risk Management Services OVERVIEW of FY2013 WC Injury Review Memory Toolbox: A Review of Loss Control Acronyms.
Accelerator Safety Workshop SLAC John Blaikie Health Physics Program Manager – SC Office of Science, U.S. Department of Energy Access Control and.
CAS in My Department Page 2 Outline The Long Shut Down Mid-term LSD Status LSD schedule, Re-baseline, Review process Challenges ahead.
MODULE FOUR. AIM To understand the causes and spread of infection and be able to apply the principles of infection prevention and control.
Mechanical Equipment.
JOB SAFETY ANALYSIS Presentation. ANY New Job/ Activity Recognize the Hazards Plan the work Protect the people Before starting ANY new job/ activity,
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Accident analysis One-hour training.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Radiation Protection Standards for Prompt Radiation Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Personal Protective Equipment (PPE) Awareness Training
Working Around/Under Loads
Hazard Identification and Control
For Labs And Proving Grounds
Mechanical Power Press Safety
First Aid At Work First aid is defined as the first help given to
DID YOU KNOW KEY CONTROLS CAN BE IMPLEMENTED TO REDUCE DROPS AND DROP-RELATED INJURIES Key controls include: DROP Zones – Restrict areas where there.
Click anywhere to get started…
Personal Protective Equipment (PPE) Awareness Training
Risk Assessments for Camps and Excursions
Managing health and safety risks
Crane Operators Association of Bermuda
Working Near Forklifts
Mechanical Power Press Safety
Presentation transcript:

Barriers for Access to Accelerator Enclosures Barriers for Rigging the Westinghouse Rotor and Stator Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety

Barriers for Access to Accelerator Enclosures The probability of two independent gate interlocks failing to remove beam and causing an accident as a result of an individual entering an interlocked gate is in a year (National Commission on Radiological Protection, NCRP 88 Appendix A, 1986); that is, once in 100,000 years Each interlock was assumed to fail once every 100 years For Administrative Controls failure, NCRP 88 assumed it to be 0.1 failures per year without explanation C-AD adds a bolt-home interlock on C-AD gates to prevent forced access, which reduces the probability of an engineered control to once in 10 million years Assuming 100 gates, the probability of failure at C-AD is once in 100,000 years similar to NCRP 88 2

Barriers for Access to Accelerator Enclosures – Admin Controls Human performance shows the Administrative Controls fail at the rate 0.01 to per use and not all failures cause an accident Assuming all failures cause an accident and a failure rate of 0.01 per use, the probability of an accident due to two Administrative Control failures at C-AD is: Work Planning (0.01) Training and Qualification of Workers (0.01) That is (0.01)(0.01) = or once in 10,000 years Assuming 10,000 entries per year into the accelerator enclosures at C-AD, that works out to 1 Administrative Control failure per year Combining C-AD Administrative and Engineered Controls (100 doors and 10,000 entries per year) gives an estimated failure rate of once in 100,000 years verses the NCRP 88 value of once in 100,000 years for a one gate dual- interlocked accelerator and an assumed Admin Control failure rate of 0.1 per year Estimates of probability are first order estimates 3

General View of Westinghouse Machine 4

Gantry Used for Lifting 5

First step of Rigging Process Removal of Pedestal and Support Rotor 6

Breaking the Coupling, Hooking the Rotor, Hooking the Stator 7

Rotor and Stator Moved Together Away from Coupling 8

Rotor Supported Independently at CG 9

Rotor Moved Out To Access Stator 10

Stator Rewound in New Jersey Facility 11

Rewound Stator and Rotor Returning to Normal Position 12

Barriers for Rigging the Westinghouse Stator and Rotor Four subcontractors were rigging the rotor and the stator Barriers observed: Work Planning (critical lift permit, PPE: hard hats, high-visibility vests, safety glasses, steel toed shoes, fall protection, gloves when pulling chains) Experienced, trained and qualified subcontractors specializing in rigging this type of equipment Lead person was present and controlling position of everyone including observers; hand signals between lead person and the three persons rigging the stator and rotor; each person was actively watching out for the others Three administrative-control barriers; ~(0.01) 3 Crew performs similar task 100 times per year; one chance in 10,000 of failure 13

What barriers are here? 14