Technical Report ISCC Meeting 16th February 2009

Slides:



Advertisements
Similar presentations
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
Advertisements

Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Richard Catherall EN-STI CERN, 1 st February 2012 ISOLDE Technical Report for the INTC.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Mats Lindroos ISOLDE Technical report INTC 14/2/2007 Mats Lindroos.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Technical report for ISOLDE Mats Lindroos on behalf of the ISOLDE team.
Technical report for ISOLDE INTC 19 May 2007 Mats Lindroos.
Trends in Heavy Ion Physics Research, Dubna, May Present and future physics possibilities at ISOLDE Karsten Riisager PH Department, CERN
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Report Technical Director Storage-Ring-Installation Completed
ISOLDE Technical Report for the ISCC
Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.
CBETA Technical Review
Richard Catherall EN-STI 2nd February 2011
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
ISOLDE and n_TOF Consolidation
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hosting Orsay Walid KAABI
Technical Report for ISOLDE
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Status of the beta-beam study
WP11: electron and proton beam testing
EN-CV interventions during EYETS for PS and PSB
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
HIE-ISOLDE Project: Planning & Resources
ISOLDE Technical report for INTC 21/5/2007
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
Technical report for ISOLDE INTC 19 May 2007
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
HIE-LINAC status report
Technical Report for ISOLDE
Progress towards Pulsed Multi-MW CERN Proton Drivers
INTC September 2002 ISOLDE Mats Lindroos Mats Lindroos.
Report on HIE-ISOLDE Status
Present and Future test facilities for High-intensity Targetry CERN
Mats Lindroos for The ISOLDE team
HIE-ISOLDE contribution packages
Technical Developments at ISOLDE ISCC Meeting 3rd November 2008
SLHC-PP kick-off meeting, CERN 9 April 2008
Technical report Mats Lindroos.
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Technical Report ISCC Meeting 16th February 2009 R. Catherall, M. Lindroos. EN-STI-RBS

Outline Shutdown Work HIE-Isolde Target Area ISOLDE Hall REX Target Production Section HIE-Isolde R. Catherall M. Lindroos

Target Area Improvement of cameras and motorization in the target area P. Fernier Replacement of neon and security lights - E. Siesling Before After R. Catherall M. Lindroos

Target Area Robot repair, maintenance and check Staubli S. A., E. Siesling Target removal Safety checks Ventilation and cooling interventions BTY beam line checks BLM’s, magnets Cables for new FE turbo pumps Front end maintenance R. Catherall M. Lindroos

ISOLDE Compressed air tube replacement Due to a frequent breakdown of compressed air tubes (hardened with time) during 2008, a decision was taken to replace all 400 metres E. Barbero, M. Owen R. Catherall M. Lindroos

ISOLDE Repair of Scanners, wire grids and fixed needle beam scanner M. Durrafourg, G. J. Focker Integration of RFQ Cooler into vacuum system J. de Freitas, H. Vestergard R. Catherall M. Lindroos

ISOLDE Hall Vacuum pump maintenance Target cooling water regulation Power supply maintenance and modifications Cabling Vacuum interlocks, power supplies Drawings Migration from Euclid to Catia, updating etc. Fast tape station controls and integration Laser barrack interlocks …etc R. Catherall M. Lindroos

REX Shielding In view of removing the close-clad lead shielding and to limit the x-ray exposure in the hall, the construction of a shielding tunnel around the REX linac is under way. D. Voulot Implementation of new alignment reference points before shielding installation Remaining: Lighting Fire alarms Roof Removal of lead shielding and end-closure installation with shielded interlock doors... shutdown 2009/2010 R. Catherall M. Lindroos

REX One good reason to remove lead-clad shielding! R. Catherall M. Lindroos

REX Repair and re-installation of the MQT4 focusing magnet. D. Voulot, A. Newborough Displacement of MQD2 between 9 gap and bender D. Voulot Development and design of tilted foil mechanism for polarized beams. F. Wenander, D. Mladinov Installation foreseen during shutdown. Controls to be integrated. R. Catherall M. Lindroos

REX Magnets REXEBIS REXTRAP RF Vacuum Controls and Applications Power supplies installed for future corrector magnets, protection to be installed… REXEBIS General maintenance, verify motor generator, exchange electron cathode… REXTRAP Diaphragm on extraction side to be installed, improve 60kV insulation… RF Implement auto-restart of HIS in PLC, maintenance of 7 gap, interlocks… Vacuum General vacuum maintenance and consolidation, interlocks, gauges… Controls and Applications Element scanning vs faraday cup, debugging, modify equiparray input, finish applications for REXEBIS… Beam Diagnostics Consolidation of diagnostics boxes, check MCP’s … Alignment Cooling Documentation …. R. Catherall M. Lindroos

EN-STI-RBS Delivery of the first batch of 35 targets constructed under the new contract with Alca, Italy S. Marzari Adoption of the Versatile Arc Discharge Ion Source (VADIS) for all plasma targets in 2009. Expected improvement in yields of all elements. L. Penescu, T. Stora Element He Ne Ar Kr Xe Rn ISOLDE MK7 ionization eff. (%) 0.14 0.36 2.0 4.3 11 - ISOLDE VD7 ionization eff. (%) 1.4 6.7 26 38 47 62 R. Catherall M. Lindroos

Acknowledgements Detailed planning well defined by E. Siesling Follow up and weekly progress reports Most of the planning organized around the availability of A. Dorsival from Radiation Protection Multi-tasks in multi-areas. Availability most appreciated. …and thank you to all those who are participating in the ISOLDE shutdown work. R. Catherall M. Lindroos

HIE-ISOLDE: Next step with three objectives ENERGY: REX energy upgrade and increase of current capacity (Matteo Pasini) Energy upgrade in 3 stages: 5.5 MeV and 10 MeV/u and lower energy capacity INTENSITY: ISOLDE proton driver beam intensity upgrade - strongly linked to PS Booster improvements including linac4 (INTENSITY WP, Richard Catherall) Faster cycling of the booster New target stations for ISOLDE New targets New target handling system QUALITY: ISOLDE radioactive ion beam quality – more than half already financed through the ISOLDE collaboration Smaller longitudinal and transverse emittance Done – RFQ cooler operational RILIS upgrade and LARIS construction Done Charge breeder upgrade Better mass resolution Continue target and ion source developments

ENERGY WP: The proposed HIE-LINAC 3 stages installation 1.2 MeV/u 3 MeV/u 5.5 MeV/u 10 MeV/u Standing group for the upgrade of the ISOLDE facility meeting TTC Meeting, Geneva Nov. 4, 2008

ENERGY WP: The proposed HIE-LINAC Layout

INTENSITY WP: Higher driver beam intensities Cost for the faster cycling of the booster included in this proposal Linac 4 will have major impact on the ISOLDE “targetry” and the project includes necessary modifications for linac 4 (but not the cost of linac 4!) Target handling, targets, waste handling and general safety in target area Major improvement of working conditions for radiation workers compared to present situation and fully in line with European legislation

Manipulator concept design 6-DOF Manipulator mounted on ceiling monorails Equipped with tool changer for mounting different tools Recoverable by decoupling (remotely) rail gear drive High lifting capacity (FFE) Target & electrode accurate / sensitive operations Options: Teleoperation with force reflection into Master ... 8.11.2018

Cloud of point in the CERN coordinate system 1.5 - The 3D Laser Scan Cloud of point in the CERN coordinate system Reference Points J. Sarret, L. Bruno May, 2008

QUALITY: well controlled beam characteristics Beam manipulation with traps and ionization with lasers permits tailoring of RI beams for Users Essential to strengthen target R&D to keep ISOLDE as a world leading ISOL lab. Major contribution received from UK and Sweden for RILIS and RFQ cooler (2655 kCHF)

REX space charge limits – REX trap and chargebreeder The low energy stage at REX can today not handle the full intensity of some ISOLDE beams: A new EBIS with higher fields and higher electron currents A RFQ cooler for operation in continuous injection mode (ACCU mode) with the EBIS Proposal submitted to the DOE in collaboration with MSU, TRIUMF, LLNL, MPI-K and ORNL

DOE proposal - Comparison EBIS/ECR/1+ Proposed High-Intensity EBIT MSU EBIT TITAN EBIT BNL test EBIS REX-EBIS Electron beam energy (keV) < 60 < 30 <30 < 6 Electron beam current (A) < 10 < 5 <5 <20 < 0.5 Central current density (A/cm2) <105 <104 <600 <200 Magnet design Helmholtz Coil + Solenoid Helmholtz Coil Solenoid Maximum magnetic field (T) 9 6 5 2 Trap length (m) 1 m 0.5 m 0.1 m 0.7 m 0.8 m O. Kester et al.

Upgrade of HRS Improved emittance, multipole corrections and instrumentation Challenge to implement it at existing facility

HIE-ISOLDE external contribution: Where are we? External grant from Belgium Second grant from Belgium approved for both physics programme and SC linac construction for HIE-ISOLDE Proposal submitted in the UK for HIE-linac Approved WP in EUCARD for R&D on thin film techniques RFQ cooler WP and RILIS WP financed and (almost) completed Proposal being prepared in the US to DOE for joint development of new high-intensity EBIS Discussions with CERN Mgt on CERN contribution.

Total all parts of project

Next steps The HIE-ISOLDE project Presentation at workshop for CERN non LHC meeting Full project approval Review panel of HIE-LINAC R&D work on first Belgium grant, 15-16 June 2009 New grant proposals , in-kind contributions and collaborations HIE-linac (UK grant proposal) New EBIS construction, commissioning and installation (DOE proposal) New High Resolution Mass separator Looking for collaboration partner(s) Study and engineering support for intensity upgrade (SPES, EURISOL collaboration) Highly complex, interaction with other ISOL facilities is essential Target development (ESS-S training program) New beams and higher instantaneous beam power