Agenda Review homework Lecture/discussion Week 10 assignment

Slides:



Advertisements
Similar presentations
Chapter 6 - Statistical Process Control
Advertisements

Control Charts for Variables
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
BPT2423 – STATISTICAL PROCESS CONTROL
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Quality management: SPC II
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Chapter 6 - Part 1 Introduction to SPC.
Chapter 5. Methods and Philosophy of Statistical Process Control
Agenda Review homework Lecture/discussion Week 10 assignment
 Variable - a single quality characteristic that can be measured on a numerical scale.  When working with variables, we should monitor both the mean.
Chapter 18 Introduction to Quality
Copyright (c) 2009 John Wiley & Sons, Inc.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
Goal Sharing Team Training Statistical Resource Leaders (1)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Control Charts for Variables
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
Methods and Philosophy of Statistical Process Control
X-bar and R Control Charts
Statistical Process Control
Quality Control.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
STATISTICAL PROCESS CONTROL AND QUALITY MANAGEMENT
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Statistical Process Control
Variables Control Chart Chapter 10. Variables Control Chart Dr. Walter Shewhart ( ) –Father of Statistical Process Control –Inventor of Control.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Slide Slide 1 Copyright © 2007 Pearson Education, Inc Publishing as Pearson Addison-Wesley. Lecture Slides Elementary Statistics Tenth Edition and the.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Process Control
MORE THAN MEETS THE EYE Wayne Gaul, Ph.D., CHP, CHMM Tidewater Environmental Columbia, SC SRHPS Technical Seminar, April 15, 2011.
Business Statistics, A First Course (4e) © 2006 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Statistical Applications in Quality and Productivity Management.
Statistical Quality Control
Copyright © 2010, 2007, 2004 Pearson Education, Inc Lecture Slides Elementary Statistics Eleventh Edition and the Triola Statistics Series by.
Quality Improvement Tools CHAPTER SIX SUPPLEMENT McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
10 March 2016Materi ke-3 Lecture 3 Statistical Process Control Using Control Charts.
VARIABLE CONTROL CHART : Mean and Dispersion  - Chart  R - Chart  S - Chart.
Control Charts. Statistical Process Control Statistical process control is a collection of tools that when used together can result in process stability.
Chapter 51Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc.
Section Copyright © 2014, 2012, 2010 Pearson Education, Inc. Lecture Slides Elementary Statistics Twelfth Edition and the Triola Statistics Series.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
OPSM301 Operations Management Spring 2012
36.3 Inspection to Control Quality
Tech 31: Unit 3 Control Charts for Variables
Chapter 7 Process Control.
36.1 Introduction Objective of Quality Engineering:
PCB 3043L - General Ecology Data Analysis.
IENG 486: Statistical Quality & Process Control
What is the point of these sports?
Statistical Process Control
Process Capability.
Statistics Process Control
Statistics for Business and Economics
Basic Training for Statistical Process Control
Statistical Quality Control
Presentation transcript:

Agenda Review homework Lecture/discussion Week 10 assignment Ch 4 – 8, 10, 24, 26, 36, 44, 49 Lecture/discussion Variable control charts SPC at Maine Medical Week 10 assignment Homework Ch 5 – 2, 8, 18, and control chart handout Read Chapters 6 and 7 Process Capability Other Variable Control Charts Control Charts

Control Charts Chapter Five Control Charts

Control chart functions Control charts are decision-making tools - they provide an economic basis for deciding whether to alter a process or leave it alone Control charts are problem-solving tools - they provide a basis on which to formulate improvement actions SPC exposes problems; it does not solve them! Control Charts

What’s causing variability? Control charts Control charts are powerful aids to understanding the performance of a process over time. Output Input PROCESS What’s causing variability? Control Charts

Control charts identify variation Chance causes - “common cause” inherent to the process or random and not controllable if only common cause present, the process is considered stable or “in control” Assignable causes - “special cause” variation due to outside influences if present, the process is “out of control” Control Charts

Control charts help us learn more about processes Separate common and special causes of variation Determine whether a process is in a state of statistical control or out-of-control Estimate the process parameters (mean, variation) and assess the performance of a process or its capability Control Charts

Control charts to monitor processes To monitor output, we use a control chart we check things like the mean, range, standard deviation To monitor a process, we typically use two control charts mean (or some other central tendency measure) variation (typically using range or standard deviation) Control Charts

Control chart components Centerline shows where the process average is centered or the central tendency of the data Upper control limit (UCL) and Lower control limit (LCL) describes the process spread Control Charts

Control chart for variables (Ch 5) Variables are the measurable characteristics of a product or service. Measurement data is taken and arrayed on charts. Control Charts

X-bar and R charts The X-bar chart - used to detect changes in the mean between subgroups tests central tendency or location effects The R chart - used to detect changes in variation within subgroups tests dispersion effects Control Charts

Step 1 Define the problem Use other quality tools to help determine the general problem that’s occurring and the process that’s suspected of causing it. brainstorm using cause and effect diagram, why-why, Pareto charts, etc. Control Charts

Step 2 Select a quality characteristic to be measured Identify a characteristic to study - for example, part length or any other variable affecting performance typically choose characteristics which are creating quality problems possible characteristics include: length, height, viscosity, color, temperature, velocity, weight, volume, density, etc. Control Charts

Step 3 Choose a subgroup size to be sampled Choose homogeneous subgroups Homogeneous subgroups are produced under the same conditions, by the same machine, the same operator, the same mold, at approximately the same time. Try to maximize chance to detect differences between subgroups, while minimizing chance for difference with a group. Control Charts

Other guidelines The larger the subgroup size, the more sensitive the chart becomes to small variations. This increases data collection costs. Destructive testing may make large subgroup sizes infeasible. Subgroup sizes smaller than 4 aren’t representative of the distribution averages. Subgroups over 10 should use S chart. Control Charts

Step 4 Collect the data Run the process untouched to gather initial data for control limits. Generally, collect 20-25 subgroups (100 total samples) before calculating the control limits. Each time a subgroup of sample size n is taken, an average is calculated for the subgroup and plotted on the control chart. Control Charts

Step 5 Determine trial centerline The centerline should be the population mean,  Since it is unknown, we use X double bar, or the grand average of the subgroup averages. Control Charts

Step 6 Determine trial control limits - Xbar chart The normal curve displays the distribution of the sample averages. A control chart is a time-dependent pictorial representation of a normal curve. Processes that are considered under control will have 99.73% of their graphed averages fall within six standard deviations. Control Charts

UCL LCL calculation Control Charts

Determining an alternative value for the standard deviation Control Charts

Step 7 Determine trial control limits - R chart The range chart shows the spread or dispersion of the individual samples within the subgroup. If the product shows a wide spread, then the individuals within the subgroup are not similar to each other. Equal averages can be deceiving. Calculated similar to x-bar charts; Use D3 and D4 (appendix 2) Control Charts

R-bar chart exceptions Because range values cannot be negative, a value of 0 is given for the lower control limit of sample sizes of six or less. Control Charts

Step 8 Examine the process - Interpret the charts A process is considered to be stable and in a state of control, or under control, when the performance of the process falls within the statistically calculated control limits and exhibits only chance, or common causes. Control Charts

Consequences of misinterpreting the process Blaming people for problems that they cannot control Spending time and money looking for problems that do not exist Spending time and money on unnecessary process adjustments Taking action where no action is warranted Asking for worker-related improvements when process improvements are needed first Control Charts

Process variation When a system is subject to only chance causes of variation, 99.73% of the measurements will fall within 3 standard deviations If 1000 subgroups are measured, 997 will fall within the six sigma limits. Control Charts

Chart zones Two thirds of all points are near the center value. Based on our knowledge of the normal curve, a control chart exhibits a state of control when: Two thirds of all points are near the center value. The points appear to float back and forth across the centerline. The points are balanced on both sides of the centerline. No points beyond the control limits. No patterns or trends. Control Charts

Identifying patterns Trends Change, jump, or shift in level steady, progressive changes in level Change, jump, or shift in level Runs - 7 points above or below; six increasing or decreasing, clusters Recurring cycles Two populations Mistakes Control Charts

Step 9 Revise the charts In certain cases, control limits are revised because: out-of-control points were included in the calculation of the control limits. The process is in-control but the within subgroup variation significantly improves. Control Charts

Revising the charts Interpret the original charts Isolate the causes Take corrective action Revise the chart Only remove points for which you can determine an assignable cause Control Charts

Step 10 Achieve the purpose Our goal is to decrease the variation inherent in a process over time. As we improve the process, the spread of the data will continue to decrease. Quality improves!! Control Charts