Grafton Solar Photovoltaics (PV) March 28, 2013

Slides:



Advertisements
Similar presentations
Solar Energy Overview Overview of the technology, benefits, as well as technical and financial project considerations for photovoltaic systems. Prepared.
Advertisements

G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
Town of Hopkinton Solar Energy Project Proposal March 2013 Presented by Hopkinton Sustainable Green Committee.
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Power from the Sun: The ups and downs of installing solar in Lethbridge Mark Goettel SACPA April 24, 2014.
Improving the quality of life for people in Dorset, now and for the future Pete West Renewable Energy Development Officer Dorset County Council Wessex.
Boxborough and Littleton Solar Program Training 5/15/15 Arnie Epstein – “Solar Coach” Stow Solar Challenge
K "A thing is right when it tends to preserve the integrity, stability, and beauty of the biotic community.
Energy Management & Alternative Energy Use in the Water Sector John S. Young, Jr., P.E. President – American Water Works Service Co. November 19, 2008.
What is Solar Power? A Simple Example How Does Solar Work? Where do we use Solar Power? What is Photovoltaic Power? What are the Components of a Solar.
Siting Considerations for Utility Scale Photovoltaic Power Generation Systems. Tim Green, Brookhaven National Laboratory NE FWS Biologists Conference February.
What - How Does Solar System Work? Grid-connected projects can apply for Net Metering (utility meter spins backwards)
So much more than a lamp and ballast change out ENERGY SERVICES PEOPLE.PLANET.PROFIT.
Genesis Solar Module Brochure ™
Making Clean Energy Simple and Profitable for Our Clients Page Solar Closed Landfills: Project Economics in Massachusetts June 2009.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Jennifer A. Senick, Executive Director Rutgers Center for Green Building Cheap and Green: Environmentally Preferable Purchasing and other Sustainable Choices.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
CCM ENERGY SOLAR PV CAWPCA November 1, Chapel Street New Haven, CT
Sustainability Denise Beall Jessica Sprankle Jordan Clayton Matthew Frankel March 5, 2012.
Soaring Heights Communities Family Housing Solar Project (at Davis-Monthan AFB) Presented by John Karelis, Utility Manager,
Benefits Of A Green Home Main Menu. Navigation/Menu Quit.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
Solar Energy Ashley Valera & Edrick Moreno Period 6.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
Tracking and Reporting Electronics Stewardship If You Can’t Count It, It Doesn’t Count Jeff Eagan Office of Environmental Policy and Assistance U.S. Department.
Renewable Distributed Generation and Public Water Supply Utilities CWWA/CTAWWA Fall Conference Paul R. Michaud, Esq. October 20, 2015.
Lee Lenox● 13.9 MW ● Lee & Lenox, MA. GREEN POWER.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Solar PV Mounting Systems Market share to reach $9bn by 2024: Global Market.
Solar photovoltaic (PV)
Plug-in to the Future of Hybrids
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
Erin Buchanan Iowa League of Cities Annual Conference
Photovoltaics (PV) Mr. Huebsch.
Solar information Session
Refills, Not Landfills Louisiana State University
Local Energy Solutions: NH Community Supported Solar
PV SOLAR PROJECT OPPORTUNITIES
Solar Initiative – Next Phase Opportunity
UK Climate Change Policy
Photovoltaic Systems Engineering Session 26
Development of Solar PV Projects on Brownfields
How does solar energy work?
PEPCO Energy here Used there
Indian Energy Initiatives Panel
Rose Drive Friends Church Solar Project Proposal
Energy in Denmark 2014 Danish Energy Agency.
Net Metering John McComb: P.E.
Park Encinitas HOA Solar Project Proposal
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
City Council April 30, 2018 Item 13
Environmental Sustainability Manager
The GridSolar Project Presentation – NRCM January 21, 2010
Net Metering John McComb: P.E.
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
Solar Energy Commercialization Session 11
Herb Stevens Jeff Lesk Genevieve Hulick
ENERGY HUNTSVILLE 2019 Sofos Harbert Renewable Energy and
Photovoltaic Systems Engineering Session 22
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Michigan Energy Summit | April 25, 2019
Municipal Solar: Taking the lead on a growing renewable movement.
Spokane Indian Housing Authority
Presentation transcript:

Grafton Solar Photovoltaics (PV) March 28, 2013

Proposed Solar Electricity in Grafton Site System Size (kW DC) (kW AC) Energy (kWh/year) Area (Acres) Grafton Campus 11,325,421 Science Park 1,296 1,000 1,702,000 4.8 Knoll 2,580 2,000 3,380,000 14.00 Total 3,876 3,000 5,082,000 18.80 Grafton solar % Grafton Total 45% Grafton solar % University Total 8%

Proposed Grafton Solar Project Two ground mounted systems Owned and operated by solar developer Solar developer sells Tufts electricity All solar generated electricity is used by Tufts Contractual vehicle is Power Purchase Agreement (PPA)

Power Purchase Agreement (PPA) Long-term (20 year) agreement between the solar provider and the host (Tufts) Host is obligated to buy ALL power generated from the solar installation Fair market value buyout option starts in year 6 of contract Contractual financial guarantees for system removal and site restoration

Solar PPA Benefits Affordable No on-going maintenance costs Locks in “all in” price of electricity Provides hedge against future price increases for 45% of campus needs Demonstrates Tufts’ leadership and commitment to climate change action

Emissions Reductions U. S Emissions Reductions U.S. Environmental Protection Agency’s Greenhouse Gas Equivalencies Calculator The systems will generate approximately 3,586 Metric Tons of Carbon Dioxide emissions 5,082,000 kWh of electricity annually to avoid This is equivalent to: Annual greenhouse gas emissions from 747 passenger vehicles CO2 emissions from 401,974 gallons of gasoline consumed 8,339 barrels of oil consumed 47 tanker trucks' worth of gasoline CO2 emissions from electricity use of 537 homes for one year CO2 emissions from energy use of 185 Carbon sequesterd by 91,939 tree seedlings grown for 10 years Carbon sequesterd annually by 2,939 acres of pine or fir forests 28 acres of forest preserved 149,400 propane cylinders used for home barbeques Greenhouse gas emissions avoided by recycling 1,343 tons of waste instead of sending it to landfill Estimated forest acreage to be removed: 11

Benefits of Ground Mounted Ability to build large scale systems Simpler, less expensive installation Easiest to maintain Lower installation costs reflected in cost of power for 20 years Mounting angle is optimized (usually 30 degrees) Direction is optimized (due south)

The Solar Developer SunEdison selected after a rigorous competitive process lead by PowerOptions Selection based on best PPA pricing methodology, 10 year SREC fixed value, willingness to develop large and small projects, strength of company and team, financial backing SunEdison is a subsidiary of MEMC Electronics Materials, a global leader in polysilicon and silicon wafer manufacturing (the foundation of most solar cells and semiconductor devices)

Sites Selected for Development The Knoll Science Park Phase II

Grafton Science Park

Science Park Phase II South East Revised Location shifted Reduced system size Net-metered: Generation assigned to main campus meter

Science Park System engineering just completed To be reviewed by Tufts Submitted to National Grid for review SunEdison performing due diligence at the site

The Knoll

The Knoll View from Route 30 Looking South

The Knoll – Existing View from Route 30 Looking South

The Knoll – Simulated View from Route 30 Looking South

The Knoll View from Access Road Looking South (near Wildlife Clinic)

The Knoll – Existing View from Access Road Looking South

The Knoll – Simulated View from Access Road Looking South

What is the technology? The preliminary designs use: Modules: MEMC-M310AMC Manufacturing locations in the US and worldwide Inverters: AE Solaron 500 AE Solaron 333 Solaron products built in the US are fully compliant with the Buy American Act The final design could use a different manufacturers’ panel

Important to remember that… The solar system cannot provide power during an emergency Electric code requires that the photovoltaic arrays automatically disconnect with the loss of utility power to prevent back feeding the utility grid and possible electrocution of personnel

Project Status Sites finalized PPA language amended with “out clause” should property tax negotiations fail PPA signed September 2012 Preliminary engineering completed Knoll interconnection submitted to Ngrid January 2013 Science Park interconnection to be submitted April 2013 Local permitting process Construction anticipated in Fall 2013 or spring of 2014

More information: PowerOptions www.poweroptions.org SunEdison www.sunedison.com