SMA ENVIRONMENTAL FORUM 2018

Slides:



Advertisements
Similar presentations
Surface Mining Control and Reclamation Act of 1977 By Nadia Farjood Period 6.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
ECE FYP BRIEFING SEMESTER ii, 2014/2015
National Statement Country II. Current Status of the Country 1. Nuclear power stations are not planned in the county. 2. Widespread of SRS for industrial.
Cost-Share Funding Opportunities – How the Lower Souris Watershed Committee Can Help You? Karmen Kyle Group Plan Advisor, Lower Souris Watershed Committee.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
The BC Oil & Gas Commission Proactively Participating in Project Decision Making Processes James O’Hanley Deputy Commissioner.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
IAEA International Atomic Energy Agency PRESENTATION TEMPLATE How to Prepare Presentation R. Martincic Incident and Emergency Centre International Atomic.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
Ministry of the Environment Certificates of Approval Anaerobic Digestion Facility Pre-Construction DIGGING INTO BIOGAS DETAIL WORKSHOP April 5, 2008.
Where to find Information About Facilities. Overview of Title V Permits.
Institutional Control Program Long Term Care and Control of Decommissioned Mine/Mill Sites Located On Crown Land Saskatchewan Ministry of the Economy April.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Insert Your Firm’s Logo Here
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Regulatory Framework for Uranium Production Facilities in the U.S.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Environmental Assessment Act – Overview Environmental Media Group.
Ministry of Environment Environmental Protection Branch Solid Waste Management Strategy November 2015.
A presentation on the stages of the mining cycle and how communities can be involved. Module No. 3 Life Cycle of Large-Scale Mining.
Bulgarian Geology and Mining Ministry of Environment and Water.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Hydro One Community Liaison Committee Minister’s Conditions Meeting #2 August 19, 2014 Solina Hall.
Proper Waste Management Today For A Better Tomorrow SWANA Waste Management Workshops Saskatchewan November 2015.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
PRESENTATION TEMPLATE Suggestions on How to Prepare a Presentation ! Do not use the SMA design of this presentation! SMA ENVIRONMENTAL FORUM 2016 Saskatoon,
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
Low-Level Radioactive Waste Forum Spring 2016 Meeting – Park City, UT
RCE Saskatchewan Response to:
PLWG Review 6.9 and the Interconnection process
Project Project Objective Component 1 Component 2 Component n …
F-Gases.
Parliament and the National Budget Process
Introduction to the Definition of Solid Waste Final Rule
(Your Presentation/ Paper Title)
Lecture 15 Environmental auditing
Grid Code Development Forum – 6 September 2017
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Addressing Costs of Methane Waste and Future Policy Actions
(Your Presentation/ Paper Title)
NATIONAL ENVIRONMENTAL MANAGEMENT LAWS AMENDMENT BILL [B14 – 2017] PORTFOLIO COMMITTEE ON ENVIRONMENTAL AFFAIRS MEETING OF 30 JANUARY 2018.
PRESENTATION OUTLINE Introduction and Background
Communication and Consultation with Interested Parties by the RB
What is the UL QFCP? FCIA Webinar Presenters:
Poster Name [Align Center]
WHAT YOU NEED TO KNOW ABOUT FINANCIAL ASSURANCE
Maternity Survey 2018: Contractor webinar
Environmental Assessment and Licensing (EAL) in Manitoba
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
IEPPEC Conference Moderators
Dr. Jim Thomas Desert Research Institute
ETS – Air Data submission Training
GUIDE FOR THE PREPARATION
PUBLIC HEARING PRESENTATION: RESIDENTS’ CONCERNS
Ministry of National Economy of The Republic of Kazakhstan
Institutional Controls At Voluntary Cleanup Sites
Navajo Nation Minor Source Regulations
DO NOT MODIFY THE MASTER SLIDE IN ANY WAY
Presentation transcript:

SMA ENVIRONMENTAL FORUM 2018 PRESENTATION TEMPLATE Suggestions on How to Prepare a Presentation ! Do not use the SMA design of this presentation! Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program. Saskatoon, Saskatchewan October 17-18, 2016

Introduction Presentations for the SMA Environmental Forum 2018 must be prepared in MS PowerPoint Presentations must be in widescreen (16x9) format This presentation is a sample template You are kindly asked to consider it when preparing your presentation; however, presenters may prepare their presentations according to their needs Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program.

Start Decide on presentation design Choose your company/organization presentation template or Create your own Do not use the SMA design of this presentation Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program.

A Few Tips Keep It Simple Keywords only Minimize the use of sentences Refrain from simply reading your slides, talk freely no one appreciates a talking PowerPoint Head  Conclude with a Take Home Message(s) Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program.

Instructions Maximum length of presentation is 30 minutes (20-25 minutes presentation, 5-10 minutes for questions/transition to next speaker. Please be respectful of the time constraints as other presenters have interesting presentations as well. You must submit your presentation to Brad Sigurdson at bsigurdson@saskmining,ca The deadline for submission of the presentation in PPT/PPTX format is Monday October 15, 2018. Submission prior to this date is encouraged and changes to submitted presentations will be allowed until the above deadline. Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program.

Conclusions Presentations will be posted on the SMA website as unedited presentations in PDF format by December 2018. The Programme Committee acknowledges that some presented information may be provided by a third party, and as such, the SMA will accept presentations that have been modified from their originally presented form, where authors receive prior approval from the SMA from Brad Sigurdson at bsigurdson@saskmining.ca. All other presentations will be posted on the SMA website as presented at the forum. Permits/approvals are required at all stages of the mining life cycle – Exploration permits, Environmental Assessment Approvals, Construction Approvals (mine/mill/HSWDG, tailings and waste rock areas, air emission abatement equipment, potable waterworks etc), Operating Approvals for the site as well as potable waterworks, Decommissioning and Reclamation Approvals. One requirement of The Mineral Industry Environmental Protection Regulations is that mining companies are required to provide the Ministry of Environment with an updated Decommissioning and Reclamation plan at least once every 5 years and that they must also post financial assurance (generally through an Irrevocable Letter of Credit or D&R Trust Fund) to cover the cost of decommissioning and reclamation in the event that the company is no longer economically viable. In this way, the taxpayers of Saskatchewan are assured that they won’t bear the cost of decommissioning and reclaiming a site. Also mention that for mines on Crown Lands the final step in the process is Institutional Control. In 2007, the province legislated The Reclaimed Industrial Sites Act and The Reclaimed Industrial Sites Regulations to establish and enforce the Institutional Control Program (ICP).  The ICP implements the process for the long term monitoring and maintenance of sites when mining/milling activities have ended, remediation has been completed and approved; and the process for transfer of the site to provincial responsibility.  The two primary components of the ICP are the Institutional Control Registry and the Institutional Control funds: the Monitoring and Maintenance Fund and the Unforeseen Events Fund.  The Registry will maintain a formal record of closed sites, manage the funding and perform any required monitoring and maintenance work.  This process is managed by the Ministry of Economy who also administer the Orphan Oil and Gas Well and Facility Program.