“Regulatory Inspection and Enforcement by PNRA” Application Set

Slides:



Advertisements
Similar presentations
Pakistan Nuclear Regulatory Authority
Advertisements

IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
 To provide for the health and safety of persons at work and for the health and safety of persons in connection with the use of plant and machinery;
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Regulatory Body MODIFIED Day 8 – Lecture 3.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Authorization and Inspection of Cyclotron Facilities Inspections.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency. IAEA Photo: V. Friedrich Outline Learning Objectives General Safety Requirements Part 1 Other General Safety.
IAEA International Atomic Energy Agency Governmental, Legal and Regulatory Framework for Safety and Regulatory Functions William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Incident Reporting And Investigation Program
Designated substance requirements
Regulatory Control Training Workshop
Regulatory Control Training Workshop
SESSION 3 Policy Framework
Third Party Activities for FH1 Project
Clinical Engineering Lecture (3).
Flooding Walkdown Guidance
United Kingdom arrangements for national registers of radioactive sources Ian Streatfield IAEA International Workshop on National Registers of Radiation.
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Temporary Works Co-ordination
GMP Inspection Process
Regulatory Control Training Workshop
Incident Reporting And Investigation Program
Communication and Consultation with Interested Parties by the RB
RECORDS AND INFORMATION
Regulatory Framework for Safety in Pakistan
Regulatory Oversight of HOF in Finland
USNRC IRRS TRAINING Lecture 14
USNRC IRRS TRAINING Lecture18
Research and Test Reactor Decommissioning Inspections
GMP Inspection Process
How to conduct Effective Stage-1 Audit
OSU Controlled Substances Training Module for Researchers
Research and Test Reactor Decommissioning Inspections
LEARNING OBJECTIVES The key objectives of this lecture are to familiarize the workshop participants with the: Different stages of the licensing process.
Presentation transcript:

“Regulatory Inspection and Enforcement by PNRA” Application Set

CONTENTS PNRA inspection policy Inspection program for nuclear power plants Types of inspections Methods of inspection Areas of inspection Inspectors qualification criteria Inspection reports and findings PNRA Enforcement Process

PNRA INSPECTION POLICY Under Section 16(2)(i) of PNRA Ordinance, PNRA is responsible to inspect all nuclear installations and nuclear material to ensure that regulations concerning safety measures are properly followed. The purpose of the inspections is to make licensee aware of its ultimate responsibility The management of PNRA is committed to provide necessary resources for the inspections. The regulatory inspections cover all structures, systems, components and activities important to safety. The inspections are performed by PNRA authorized inspectors and are conducted as per approved inspection plan. The results of the inspections are documented in the form of inspection reports which form the basis for any subsequent enforcement action.

POWERS OF INSPECTOR Under Section 29 of the PNRA Ordinance, an inspector shall have the powers to: Enter any premises for the purpose of satisfying himself as to whether the provisions of the rules and regulations have been or are being adequately complied with; Examine designs, drawings, records, reports or documents; carry out any tests and investigations; obtain and analyze any samples; lock and seal any premises, nuclear installation, radiation generator, or any part thereof, where any nuclear substance or radiation generator is being used, stored, operated or maintained

PNRA INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS PNRA inspection program forms the basis for inspection activities of nuclear power plants. PNRA performs regulatory inspections to ensure compliance with: national regulations, conditions attached to the license and; commitments made by the applicant/licensee for safety These inspections, however, do not relieve the licensee of its ultimate responsibility for safety The inspections of nuclear power plants are performed by respective regional Directorates in coordination with the Licensing Directorate (NSD) responsible for authorization and Licensing (NSD)

PNRA INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS The inspection of equipment manufacturing is the responsibility of NSD The Regional Directorates (R-2) and R-3 located at respective nuclear power plant sites Chashma and Karachi are responsible for inspections The regional Directorate R-1 is located at Headquarters and is responsible for authorization and inspections of radiation facilities. PNRA authorized inspectors mainly conducts two types of inspections, namely planned inspections and reactive inspections. Either type of inspection may be announced or unannounced, however, announced inspections are more common. The planned inspections are conducted as per approved inspection plan and are generally announced to the licensee in advance, however, un-announced inspections may also be performed.

PLANNED INSPECTIONS are carried in accordance with a baseline inspection plan may be linked to licensee’s schedule for performing or completion of certain activities at different stages of the authorization process differ from reactive inspections in that they are scheduled in advance and are not initiated by unusual or unexpected circumstances, provide an opportunity for detailed examination of the licensee's activities to identify problems at an early stage.

REACTIVE INSPECTIONS initiated in response to an unexpected, unplanned or unusual situation or event to assess its significance and implications and the adequacy of corrective actions. may be occasioned in response to a generic problem encountered at another plant, or identified during the review and assessment process. Are conducted by employing maximum resources in case of a serious event Make use of licensee’s reports of safety related activities or event reports May involve a multidisciplinary inspection team according to the need of the situation. .

ANNOUNCED AND UNANNOUNCED INSPECTIONS In case of an announced inspection the licensee will be notified in advance by the Regional Directorate Inspections are announced when PNRA intends to observe a specific test or activity The main advantages of such inspections are: the inspector is able to discuss plans and needs with the licensee in advance, Assurances may be secured from the licensee that documentation or personnel will be available for inspection or interview Hence, announced inspections may enhance the efficiency of inspections.

METHODS OF INSPECTION Discussion and interviews with the licensee's and contractor's personnel Monitoring and direct observation (e.g. of working practices and equipment) Examination of procedures, records and other relevant documentation Tests and measurements (may be performed only in rare cases e.g. environmental radiation monitoring to verify the data of licensee) The inspectors are free to make their own judgment whether to use one or more of the above methods in a balanced way depending upon the specific situation.

AREAS OF INSPECTION The major inspection areas/activities which are included in the inspection plan are described below: Siting Construction Installation and Equipment manufacturing Commissioning Testing before fuel loading Initial fuel loading and criticality Power ascension testing Operation Decommissioning

SITING INSPECTIONS The inspection plan for siting covers the following areas/activities: Studies for determining site characteristics; Excavation and earthwork; Experiments, if any, to study dispersion models; Implementation of QAP. The applicant is required to inform about the work schedules so that PNRA inspectors may perform the inspections.

INSPECTIONS DURING CONSTRUCTION AND INSTALLATION Objective: To Verify that Construction, Installation, Manufacturing Activities are carried out in accordance with agreed codes & Standards, National& International and adequate Quality Assurance is maintained as per Quality Assurance Programs (QAP). Document to be consulted: PSAR, 50-C/SG-Q-1996 Regulatory Guide Codes & Standards (ACI, ASME, ASTM, IEEE etc) Design Specs Equipment Specs License Conditions, etc

INSPECTIONS DURING CONSTRUCTION AND INSTALLATION Control Point Inspections: Inspection carried out against selected control points from Q- plans Hold Point (H) Witness Point (W) Record Point (R) General Surveillance: To observe the working conditions and activities being taken place without any intimation and objectives as in the case of control points inspections QA Administrative Inspections: To verify overall quality assurance system of the organization of licensee and its contractors and sub-contractors

EQUIPMENT MANUFACTURING Main items/activities to be include: Processes having an effect on the quality of the equipment such as welding, etc. Qualification tests (seismic and environmental qualification), Functional tests. implementation of QAP

COMMISSIONING Control Points for inspections are selected from the Commissioning program which include hold points, witness points and record points Inspection during the commissioning stage should focus on four broad areas: Testing before fuel loading (e.g hydrostatic testing of reactor coolant system, containment integrity or leak rate testing, testing of ESF etc.) Initial fuel loading and criticality and low power testing Power ascension testing (e.g. Main coolant pump trip, loss of off- site power, turbine trip etc.) Other commissioning activities such as management of commissioning activities, modifications and maintenance, implementation of RP program etc.

OPERATION The areas to be inspected during operation phase include: Operational limits and conditions Operating procedures Control room visits Radiological protection Operator training and competence Effluent and radioactive waste management Emergency Response Planning and Procedure Refueling On-site fuel handling and storage

PROVISION OF GUIDANCE TO INSPECTORS Written procedures which ensure that all nuclear installations are inspected on the basis of a common standard and consistency in the level of safety Training program of the inspectors emphasizing upon: legal basis of inspection and the extent of inspector's authority. applicable regulatory requirements, regulations, guides and industrial standards. Inspection Program Policies of PNRA that may affect inspection Standards of conduct of inspectors The importance of objectivity and fairness on the part of inspectors and need to respect appropriate facility rules established by the licensee.

INSPECTORS QUALIFICATION CRITERIA Master degree in Nuclear Engineering / System Engineering/Medical Physics, Physical Sciences or Bachelor Degree in Engineering and more than six months training course in Medical Physics/health physics/ Radiation Protection or related fields. Successful completion of: PNRA level-I & level-II (or equivalent) professional training courses. Training Course on PNRA Regulations Training Course on Inspection & Enforcement Techniques.

INSPECTORS QUALIFICATION CRITERIA 1. Nuclear Safety Inspector Participation in at least two major inspections, under the supervision of a licensed inspector Participation in at least ten general surveillances inspections under the supervision of a licensed inspector 2. Physical Protection Inspector Six (06) inspections on physical protection of nuclear power plants or research reactors. Ten (10) inspections on physical protection of radioactive sources Category 1

NECESSARY SUPPORT FROM LICENSEES As per the Ordinance, the licensees are bound to provide the inspectors with such equipment, assistance and support as may be necessary for carrying out their responsibilities e.g. on-site working facilities transport at the site access to means of communication facilitation of access to all pertinent information copies of the relevant documents meetings with appropriate staff personal protection equipment

INSPECTION REPORTS AND FINDINGS The results of the inspections are documented in the form of inspection reports which form the basis for any subsequent enforcement actions. Report of each regulatory inspection is prepared by the inspector(s) who conducted the regulatory inspection within seven days after the inspection, with the approval of the respective Director. The approved report is communicated to the respective licensee and circulated to concerned Directorates of PNRA. Records of all inspection reports are maintained with respect to each nuclear power plant in a retrievable manner.

PNRA ENFORCEMENT PROCESS Under section 44 of PNRA Ordinance, any person who contravenes any provision of the Ordinance and the Regulations issued there under is liable to be prosecuted. PNRA Enforcement Regulations (PAK/950) provide the mechanism to deal with the violators of the PNRA Ordinance and rules and regulations made there under. As a general policy of PNRA, the prosecution will be used as a last resort when all the other mechanisms described in the procedure i.e. serving of show cause notice and hearing proceedings do not result in a positive outcome.

PNRA ENFORCEMENT PROCESS Licensees Non-licensees Reporting of Violation Assessment of Violation Issuance of Warning Notice Issuance of Show Cause Notice Conduct of Hearing Issuance of Legal Notice Filing of Complaint for Prosecution Cancellation of Licence Reporting of Offence Rectification of Violation or Offence C

THANK YOU