T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

California Public Utilities Commission December 4, 2013
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Pay for Performance Regulation Donald Tretheway Senior Market Design and Policy Specialist January 11, 2012.
Presentation to WECC Market Interface Committee March 24, 2015
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
D.R.E.A.M Task Force Distributed Resource Energy/Ancillary Market Task Force August 2015 Meeting.
Victoria L. Ravenscroft Senior Policy Analyst Reliability Planning and Performance Analysis Information Sharing Policy Update March 25-26, 2014 Standing.
Slide 1 Convergence Bidding Working Group – 10/22/09 Teleconference Information Dial-in Number: (800) International Dial-in: (612) There.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Transmission Planning at the California ISO September 10, 2015.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ERCOT Staff Demand Integration Update to DSWG 3/08/2013 DSWG Meeting.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERS Update – DSWG Presentation September 21, 2012.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Market Operations Standing Committee of the IMO Market Operations Standing Committee June 3, 2003.
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
© 2015 Stem, Inc. Proprietary and Confidential 1 © 2016 Stem, Inc. Proprietary and Confidential 1 DRP Data Access Workshop May 23, 2016 Matt Owens Director.
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Signalling Programme External Stakeholder Meeting on September 17, 2009.
Joint CPUC-CAISO Workshop: IOU Energy Storage Track 2, R May 3, 2016 Multiple-Use Application of Energy Storage Systems Gabriel Petlin/ Manisha.
1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 14, 2009 Eric Winkler, Ph.D. Project.
Power of choice – embedded networks information session
LNBA Subgroup: Avoided Transmission Value
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Transmission-Distribution Interface Working Group Meeting
Causer Pays Workshop 20 March 2017.
Overview of the NYISO Demand Response Programs
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
August ICA Agenda Time Topic 8:00 – 8:15
DCPP Curtailment Guidelines
Transmission Access Charges (TAC)
Town of Georgetown Comprehensive Plan
CCWG September 29th Meeting
The TPB’s Draft Participation Plan
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
Cost of Service Analysis & Rate Design
The Future of Demand Response in New England
Update on European Network Codes
Rule 21 Working Group 2 Issue 6 subgroup
Market Interface Committee
California Climate Landscape 2016
Convergence Bidding Working Group – 10/22/09
Working Group Meeting #2 Measurement, Metering and Settlement:
Pay for Performance Regulation
Enhanced Proxy Demand Resource: ESDER 3 PDR-LSR
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Market Interface Committee
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 21, 2018
Load Shift Working Group
Forecasting and Operations CAISO Case
Developments in Connecticut
DER Growth Scenarios and Load Forecasts Working Group
GRID2.0 DC Solar United Neighbors Solar Congress June 1, 2019
Information Sharing Policy Update March 25-26, 2014
Today’s Agenda! Today will be a work day for your social action campaigns. You will need to set up your websites today. Please stay on track and pace.
The Future Grid and Energy Storage
Updating the Transportation Impact Fee – The Proposed Calendar and Public Input Process Town Council Meeting March 15, 2017.
The Seller’s Webinar will begin promptly at 1:03
Presentation transcript:

T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers

ISO Policy Initiative Stakeholder Process POLICY AND PLAN DEVELOPMENT We are here Issue Paper Straw Proposal Draft Final Proposal Board Stakeholder Input Milestone Date Post issue paper September 29, 2017 Stakeholder call October 12, 2017 Stakeholder comments due October 18, 2017 11 set of comments received Page 4

Below are the potential scope items that were proposed in the Issue Paper Demand Response Multiple-Use Application Demand response modeling limitations 24x7 CAISO participation requirement for DERs Weather-sensitive demand response Wholesale market participation model for a micro-grid Resource design constraints Demand response aggregation rules Non-Generator Resource Reflecting costs and NGR use limitations RDRR economic buy-back of day-ahead awards Managing SOC and throughput limitations for MUA Recognition of behind the meter EVSE load curtailment Load consumption and regulation Load shift product

Next Steps Agenda Milestone Date Stakeholder workshop - Issue Paper November 6, 2017 Stakeholder comments due – Nov 6 workshop discussion and presentations November 13, 2017 Agenda Time Item Speaker 9:00 – 9:10 Introductions James Bishara 9:10 – 9:15 Review Agenda and Expectations Eric Kim Emotorwerks STEM 9:15 – 11:00 Potential Scope for Demand Response 11:00 – 12:00 Potential Scope for Multiple-Use Applications 12:00 – 1:00 Lunch 1:00 – 2:45 Potential Scope for Non-Generator Resource 2:45 - 3:00 Next Steps Materials related to the ESDER Phase 3 initiative are available on the ISO website at http://www.caiso.com/informed/Pages/StakeholderProcesses/EnergyStorage_DistributedEnergyResources.aspx