Joint Classroom Steering Committee Report

Slides:



Advertisements
Similar presentations
Construction Report July 28, Projects KMS Phase IIClose out –KMS CafeteriaClose out –KMS Renovations & AdditionsClose out –Royalwood Elementary.
Advertisements

Smart Classroom Orientation: KHS-199 Lecture Hall
How To Use The Podium Touch Panel. Volume Up Volume Down Volume Mute Microphone On/Off Power Off / Exit The touch panel can operate by touching anywhere.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
TV Studio at Belzer Middle School!!!!!!!. General Information The TV studio in Belzer Middle School is located down the hall from the main office on.
College of Education 103 Conference Room The Multimedia Podium.
Detailed Room Guides Select from the list of Willard Building technology classrooms to view more detailed operating instructions. The instructions are.
EClassroom Standards The University of West Florida.
Remote Monitoring of Classroom A.V. Equipment by Bob Hageny, CTS SUNY Oswego Chuck Perkins, CTS SUNY Oswego.
Schacht aslani architects P ENINSULA C OLLEGE business and humanities building predesign study Classroom Programming 2 May 2006.
Lecture Theatre User Guide – Using the AV Pod, Projector and Screens If the touch panel is blank, press firmly to wake up. Start up the Pod To turn on.
FEATURES OF CLASSROOM 230 SMART PODIUM FOR TECHNICAL SUPPORT CONTACT: Jim Epting
The Current State of Instructional Technology in General Purpose Classrooms George Preisinger/Steve ShablinFeb. 14, 2002.
Designing Smart Facilities for Distance Learning Environments Presented by Israel Fletes UCR - Multimedia Technologies.
COMPUTER ON WHEELS (COW) Equipped with Laptop, VHS/DVD Player, Video Projector, and Amplified Speaker Mobile Cart AC Powered with Ethernet Cable provided.
Board Meeting – June 24,  Communication  The Countdown!
Summer 2010 Technology Projects. K-6 Pods 88 Pod Rooms Computers unboxed/imaged and installed in classrooms 88 Pod Rooms Computers unboxed/imaged.
HIGH TECH AV SOLUTIONS FOR YOUR AUDIO/VISUAL NEEDS.
What is a smart classroom? Smart classroom general equipments. Examples for smart classroom’s specific tools. What are the advantages of smart classrooms?
Welcome to Dixon University Center Technology at Your Fingertips.
SmartClassrooms A SmartClassroom is a general assignment classroom (GAC) containing technology to enhance and assist in instruction.
CLASSROOM REVIEW BOARD Proposal Presentation to the UTFAB Tuesday, March 1, 2005, 5 PM, Library Tom Maher, Dir. of OIS,
Classroom Technology Upgrades: The 2013 Edition For TIF May 29, 2013.
 137 Campus Buildings on 1,250 acre campus  11,603 Students overall  8,352 undergraduate students  853 Full-time faculty, 111 Part-time  Faculty to.
Industry Park & Ride Project Update. Industry Park & Ride Construction completed on time and under budget Parking structure opened to public on October.
Physical I&IT Infrastructure Proposal Presentation to the UTFAB Monday, February 16, 2003, 4-5 PM, 202 Weber Pat Burns, IAVPIIT,
Robbing Peter to Pay Paul 2014 – 2015 Tough Choices: 2 Options.
Classroom Refresh Overview eTech is funding ongoing replacement of (and improvements to) classroom equipment Initial SmartClassroom renovations began in.
Informational Update Student Success Fee Funded Project Status Emerging Technologies & Instructional Technologies Committees IT Governance Executive Committee.
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Instructional E-Classroom Instructional Guide Seneca College, Audio-Visual Services.
Recommendations for: Upgrading Technology Enhanced Learning Spaces Upgrade of Computers in Open & College Labs IT Governance Executive Committee January.
HIGH TECH AV Solutions for your audio/visual needs.
Classroom Technology Fall 2009 Update Presentation to the UTFAB Tuesday, October 27, 2009 By - Douglas Satterfield Classroom Support Services-ACNS,
Presentation to the UTFAB Presentation to the UTFAB Monday March, 9 th, 2015 Monday March, 9 th, 2015 By – Douglas Satterfield By – Douglas Satterfield.
Presentation to the UTFAB Presentation to the UTFAB Monday, April 21, 2014 Monday, April 21, 2014 By – Douglas Satterfield By – Douglas Satterfield Classroom.
A Collaborative Blueprint for Classroom Design Barbara Brandt, ITD Carole Meyers, Emory College Emory University Copyright Barbara Brandt and Carole Meyers.
Presentation to the UTFAB Presentation to the UTFAB Tuesday, October 23, 2012 Tuesday, October 23, 2012 By – Douglas Satterfield By – Douglas Satterfield.
University Technology Fee Advisory Board Funding Request April 13, 2010 Colorado State University Libraries.
CRESTRON SYSTEMS OPERATION: FOR CLASSROOMS IN COCC’S SCIENCE BUILDING & HEALTH CAREERS CENTER.
Presentation to the UTFAB Presentation to the UTFAB Monday, April 1, 2013 Monday, April 1, 2013 By – Douglas Satterfield By – Douglas Satterfield Classroom.
Presentation to the UTFAB Presentation to the UTFAB December, 1 st, 2014 December, 1 st, 2014 By – Douglas Satterfield By – Douglas Satterfield Classroom.
Al Powell Director, Learning Technologies Classroom Support & CSU Online.
Cornerstone Free Will Baptist Church TECHNOLOGY STRATEGIC PLAN.
Presentation to the UTFAB Presentation to the UTFAB Monday, December 2, 2013 Monday, December 2, 2013 By – Douglas Satterfield By – Douglas Satterfield.
Classroom Podium Tutorial The Academic Computing Center
BUILDING, RENOVATING, AND MAINTAINING TECHNOLOGY-ENABLED CLASSROOMS
IT Department Introduction
Center for Advanced Technology and Training CATT Room Instruction Demo
Classroom Support FY 2018 UTFAB Proposal
Classroom Technology Report UTFAB October 2016
Technology Support Strategy for UNI Learning Spaces
Designing a DM Classroom
University Technology Fee Advisory Board
Building 400 Conference Room A/V System (press esc to exit)
Hi-Tech Classroom Replacement Cycle Update
A Collaborative Blueprint for Classroom Design
Classroom Technology Proposal 2009/2010
University Technology Fee Advisory Board Status and Updates
Classroom support 2018 update – 2019 preview
X-ray Pump-Probe Instrument
Room 1804 classroom control system
University of Northern Colorado
Classroom Support - Supplemental request - Follow-up on 2017 funding
Automation and JROTC Unit Management Systems (JUMS)
A/V computer connections V2 - 4-March-2016
Using the Dean’s Boardroom
Classroom Technology at CSU
Digital Literacy Update
Singapore Management University
Presentation transcript:

Joint Classroom Steering Committee Report Mark Oliver Presenting on behalf JCSC committee 03/22/2018 Deals with AV, furniture, & lighting General Assignment classrooms Information Technology Services

JCSC Report Recent AV Updates from funds allocated last year Summer 2017 Ballentine Hall, Rooms 101, 102, 105, 111, 112, 113 Replaced projector Added Air Media, Wall touch panel, Document camera Chafee Hall, Room 244 Replaced control system, touch panel, Document camera Information Technology Services

JCSC Report Recent AV Updates from funds allocated last year CBLS 010 Summer 2017 CBLS 010 Replaced projector East Auditorium Installed Laser Projector New touch panel and AV processor East Aud Information Technology Services

JCSC Report Recent AV Updates from funds allocated this year: January 2018 Quinn, White, and Kirk Auditoriums Installed Laser Projectors Installed podium Added Air Media, Touch screen, Document camera Added matching tables for instructor materials Information Technology Services

JCSC Report Information Technology Services

JCSC Report Recent AV Updates Information Technology Services January 2018 Keaney 208 and 209 With exception of structural and electrical work, all other labor performed by CMA staff Room construction started on January 5th and rooms were ready to go for January 22nd Information Technology Services

JCSC Report Recent Furniture Updates from funds this year Summer 2017 Added benches to Chafee atrium Chafee Atrium Information Technology Services

JCSC Report Remaining FY ‘18 funds and a portion of FY ’19 funds: Thirty-nine “black box” classrooms These classrooms were part of the original 52 installed in 2010 JCSC funds will be used to purchase new processors and equipment to go inside the black boxes CMA will perform all installations, saving URI approximately $250K. Equipment for thirteen rooms will come from FY ‘18 funds, the remainder from FY ‘19. Information Technology Services

JCSC Report Future Plans Chafee Auditoriums Preliminary Discussions for FY ‘19 Chafee Auditoriums Laser projectors, all new internal AV equipment New podiums, document cameras, sound systems Computer in the podium 271: $ 140K for AV system $ 100K for construction 273, 275, 277: $ 85K for AV system $ 70K for construction Information Technology Services

Classroom Media Assistance Statistical Report Top Ten Misbehaving Classrooms (9/17 to 3/18): Beaupre 100 * 10 Chafee 219 * Chafee 244 * Pastore 305 9 Quinn 104 CBLS 010 * 8 Chafee 277 Quinn 219 White Aud {mic} 7 White 205 Information Technology Services

Classroom Media Assistance Statistical Report Classroom Equipment Issues (9/17 to 3/18):  Device Count Pct System 59 21.53% Cables 52 18.98% Projector 50 18.25% Room Computer 35 12.77% Microphone/Speaker 26 9.49% Other 25 9.12% Blu Ray Player 21 7.66% LCD/Monitor 5 1.82% Information Technology Services

Classroom Media Assistance Statistical Report September 2016 to mid-March 2017: 336 problem tickets September 2017 to mid-March 2018: 274 problem tickets Approximately 20% reduction in tickets Information Technology Services