Citrus Park Drive Extension

Slides:



Advertisements
Similar presentations
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Advertisements

County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Traffic Signals, Signs and Pavement Markings  are used for traffic control to provide a smooth, orderly flow of traffic Remember: Obey all signs and signals.
Signs, Signals and Roadway Markings
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
Signals, Signs, and Road Markings Sophomore Driver Education.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
PTO Back to School Night Introduction to our new Access Drive “We are committed to making our school and community safer”
NORTHFIELD COMMUNITY SCHOOL Elementary School Entrance Cedarbridge Road Side NORTHFIELD POLICE NJ 1.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS
Signs, Signals and Pavement Markings
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Roadway markings - where you can go and what you can do Designates lanes Directs traffic Warns of hazards Signals permission to pass Office 2010 Presentation.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Signs, Signals, and Lane Markings. Three types of traffic control devices. Signs Signals Lane Markings.
Signs Signals and Pavement Markings
Road Markings Chapter 4. Roadway markings What do the LINES ON THE ROAD WAY indicate? Tell you which direction traffic is flowing.
 Warn drivers about dangerous situations  The are for road conditions that need caution for specific hazards that may be encountered.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Drop Off and Pick Up Procedures. Front parking lot is reserved for school buses only. If you need to come into the school please enter front.
 Every sign’s shape and color have special meaning  Regulatory Signs: Signs that set limits, or give commands.  Example: stop sign, Yield, One Way,
1 Section III Day 2. 2 In this picture are a pedestrian, an inline skater, and a cyclist. They are all going the same way. Which roadway user has right.
ROAD SAFETY BE SAFE, BE SENSIBLE AT DROP OFF AND PICK UP TIME.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Driver Education Ch. 4: Safe Driving Rules & Regulations
Signs Power Point Assignment
Saving the King Street Bicycle Boulevard
Unit 13 SHARING THE ROAD COMMUNICATING WITH OTHER ROAD USERS
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
US 92 Pedestrian Connectivity & Safety Assessment Study
Col. Pike Multimodal: About the Project
Signs, Signals, and Roadway Markings
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
CHAPTER 3 Signs, Signals, and Pavement Markings
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
US 92 Pedestrian Connectivity & Safety Assessment Study
2017 PCA CAR POOL PLAN.
Rules of the Road.
Signs, Signals, and Markings
Meeting of the Hillsborough MPO Board December 5, 2017
Gilda’s Run 2018 – 5K Route Runner Red Bids
Signs, Signals and Roadway Markings
City of Wilmington Bike Plan Update
Marin-Curtis Safe Routes to School
Traffic Safety.
State Aid Standards Development
SIGNS, SIGNALS, and MARKINGS
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Lockheed Martin – Building 100
CHAPTER 4 SAFE DRIVING RULES & REGULATIONS
Proposed Driscoll Expansion Brookline, Massachusetts
Design Standards.
Remember the traffic rules.
Rules of the Road Chapter 10
Safe Routes to School John Schaefer State Coordinator.
CHURCHPOINT ROAD BUS LANE BLACK PARKING LOT Freshman HWY 431 Academy
Chapter 2 Signs, Signals, and Roadway Markings
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Staff Will Assist Students Getting Out of Cars
Presentation transcript:

Citrus Park Drive Extension From Sheldon Road to Countryway Boulevard CIP Project: #61134 Hillsborough County Public Works Department

Citrus Park Drive Extension Scope of the Project Project Goals Project Improvements Schedule Information Outreach Today we will go over the scope of the project and how it fulfills the Purpose and Need developed in the PD&E stage and how we accommodated requests for bicycle and pedestrian safety for the benefit of local residents and the needs for Deer Park Elementary. We will also touch on the cost, schedule and our continued public outreach.

Location Map new signals Here is our location map starting at the intersection with Countryway Blvd. and ending at Sheldon Road. <CLICK> Note the project has 2 new signals at both Fawn Ridge Blvd. and Deer Park Elementary

Project Need and General Information Connects End Points of Citrus Park Drive Extends from Sheldon Road to Countryway Boulevard – over 2 ½ miles Four-Lane divided Urban Road – 6 foot wide buffered bike lanes + sidewalk

Project Goals Provides East-West Mobility in NW Hillsborough Reduces volume for existing roadways Linebaugh Avenue South Mobley Road Mobility includes pedestrian and bicycling users Safe Routes to School Bike Boxes Connectivity to Upper Tampa Bay Trail

Citrus Park Drive – West End Here is a view of the western end of the project. Currently Citrus Park Drive in this area is 2-lane road which ends in a cul-de-sac. The new improvements show a 4-lane roadway with modified entrance to Deer Park Elementary.

Citrus Park Drive and Countryway Blvd. Adding new sidewalk (west) on Countryway Blvd. from Citrus Park Drive to Racetrack Road One of the major features of the project will be to improve the bicycle and pedestrian access in the area. Notice the green bicycle box intended to benefit cyclists that use the new 6ft. Wide bicycle lane. Also note that as part of the new crossings at Countryway there will be a “Blank Out” box letting drivers know not to proceed northbound on Countryway when pedestrians are in the sidewalk. In addition <CLICK> we will be adding a new sidewalk on the western side of Countryway from Citrus park to Racetrack Road. Citrus Park Drive and Countryway Blvd.

Deer Park Elementary – Ingress / Egress In this slide we show the future circulation patterns for the school. Right now the parents queue up at the cul-de-sac before getting into the school. Here we have a left turn-in (in orange) at a signalized intersection for both cars (yellow) and buses (red), where the buses turn left for drop off. The parents can enter either the east or west entrance for dropping off and picking up (noted in yellow). Note that we included long turn lanes at both the left turn in and the area for a U-turn to the east to help accommodate traffic. Deer Park Elementary – Ingress / Egress

Deer Park Elementary – Ingress / Egress To Parent Drop Off To Bus / Office Here is a close up of the intersection at Deer Park Elementary. We will be closing the connection for exiting parents so that the on site queue for pick up can be maximized. The orange arrows indicate driving patterns for parent drop off and red for the buses entering and dropping off. The yellow arrows show the exit patterns. Deer Park Elementary – Ingress / Egress

Citrus Park Drive – East End Here we are reconfiguring the entrance to Fawn Ridge, where the existing entrance off Sheldon will now only be open to residents south of Citrus Park Drive and the residents of Fawn Ridge will have a new signal onto Citrus Park Drive. These improvements also include new pedestrian access and turn lanes into Citrus Park Drive.

Total Construction Cost = $57M Current Schedule Final Design Spring 2018 Procurement Summer/Fall 2018 Construction Winter 2018 We have finalized design pending some outstanding permitting items and intend to go to bid later this summer with a construction start date of late this year. Total Construction Cost = $57M Total Project Cost = $65M

For More Information… hcflgov.net

Thank you!