Conclusions of LCWS08 & ILC08, Chicago, November ‘08

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Status of ATF Fast Kicker Experiment
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Damping Ring Session Summary S. Guiducci TILC09 Tsukuba 21 April 2009.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
DA  NE KICKERS David Alesini (LNF, INFN Frascati) 4th Low Emittance Rings Workshop INFN-LNF September 2014.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
The Survey of the Power Supply Reliability at SSRF
DR Kicker R&D: Goals and Work Scope
Phase Feed-Forward Piotr Skowroński (CERN)
Hua Shi, Jinhui Chen, Lei Wang, Na Wang, Lihua Huo, Peng Liu, Yan Li
AD consolidation activities in LS2
Main Septa Solid State Pulsers & Kicker Thyratron Pulsers
Horizontal e+ instability Study & Solution
CTF3 kicker activities at CIEMAT
F.Marcellini, D.Alesini, A.Ghigo
ELENA tune measurement
Puls-Plasmatechnik GmbH
Fast Kicker R&D in the Americas Region
Junji Urakawa (KEK) for ATF International Collaboration
Stainless Steel Water Well Casing.
Tapered Beams: Engineers often taper beams so that the beam strength is larger where the bending moment is larger.
Beam Injection and Extraction Scheme
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
XFEL Collimation and Beam Switchyard Vacuum Issues
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Fourier Series Pulse Compression Damping Ring Kicker
Lithium lens and window tests
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

Conclusions of LCWS08 & ILC08, Chicago, November ‘08 The new DAFNE injection kickers, installed one year ago, work well and are very versatile devices. Used with both FID and old DAFNE pulsers and even as a feedback kicker! Reliability problems of the fast pulse generators by FID remain to be solved, we hope with the 24kV units. A tapered stripline kicker has been designed for ATF, mechanical drawings already done. Ready to be realized.

kck1 kck2 beam fast pulse Injection with hybrid system 24kV FIDs have been tested in the electron ring kickers (“hybrid” configuration). They worked well for about one month, then one FID failed followed by the other one after one more week of test in the lab. 20kV fast pulser 20kV fast pulser The 24kV FID e- ring old pulser old pulser

Present situation horizontal horizontal fdbk fdbk We are now waiting for two new 24kV FIDs. They are at the moment under test at FID GmbH. e+ ring old pulser old pulser e- ring old pulser

Mechanical drawing of the kicker ready. Fabrication started. Completed for middle of April. Kicker is made in stainless steel, 320 mm long. Feedthroughs are commercial available HN-type connectors (CERAMTEC).