THE BC(A)R 2014 INSPECTION & CERTIFICATION SYSTEM

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Auditing, Assurance and Governance in Local Government
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
ZHRC/HTI Financial Management Training
BUILDING AND DEVELOPMENT CONTROL Willie Hannigan.
Building Control (Amendment) Regulations 2013 Legal issues – compliance and the consumer perspective Engineers Ireland 17 January 2014 Deirdre Ní Fhloinn.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Draft Code of Practice – General Consultation / Implementation Sue Woodgate.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
THE PROFESSIONAL REVIEW – DOCUMENTATION 1.The documentation you must supply, ie, the Engineering Practice Reports Part 1: Training and Experience Part.
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
Proposed Irish Standard — Code of Practice for Procurement and Use of Unbound Granular Fill (Hardcore) for Use under Concrete Floors. Hubert Fitzpatrick.
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Mike Ellis Executive Director – Property + Projects
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Building Control Amendment Regulations - Health Services Perspective
Auditing & Investigations II
ISO/IEC
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
EPA CONTRACT TEMPLATE Overview
Drawings Introduction to FIDIC - Drawings -.
APARTMENT BLOCKS – DEALING WITH DEFECTS
RIBA Plan of Work 2013.
Overview of the WTO SPS Agreement and the role of
EPA SUBCONTRACT TEMPLATE Overview September 2017
General Data Protection Regulation
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Particular Conditions of Contract & Appendix to Tender
Temporary Works Co-ordination
Project Development and Managing your Build Agenda
MODULE C - LEGAL SUBMODULES C1. Conflict Of Interest/Code Of Ethics
Standards and Certification Training
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Amendments to the Building Control Regulations S.I. No.9 of 2014
Forest Professionals in timber cruising
Institutional changes The role of Bilateral Oversight Boards
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Effective Building Control System
Introduction DEFINATION :-
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
BC(A)R Practicalities & issues arising
Insurance, Liability and Indemnity issues for Assigned Certifiers
The assigned certifier conference 2019
Candidate Registration & Induction
About ACE Purpose of ACE Values
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
BUILDING DEFECTS: a legal perspective
RIGHTS, DUTIES AND LIABILITIES OF AUDITOR
BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound
FIRE UPGRADES OF EXISTING BUILDINGS
ANCILLARY CERTIFICATION UNDER BC(A)R
RIBA Plan of Work 2013.
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Restricted Building Work (RBW) Training For Trainers
Presentation transcript:

THE BC(A)R 2014 INSPECTION & CERTIFICATION SYSTEM 21-06-2018 6th June 2013 Presented by: Michael Moriarty T.J.O’Connor & Associates BE, MEngSc, CEng, FIEI, FCons.EI 1

SCOPE of BCAR – SI No. 9 of 2014 Came into operation on 1st March 2014. the design and construction of a new building, an extension to a dwelling involving a total floor area greater than 40 square metres, works to which Part III applies.

OPT-OUT PROVISIONS SI No. 365 of 2015 Came into operation on 1st September 2015. Provides an Opt Out Option for Owners of A New Single Dwelling on a Single Unit Development, or A Domestic Extension (without size limitation)

OPT-OUT PROVISIONS SI No. 365 of 2015 The Dwelling or Extension Must be Designed and Constructed in accordance with the Building Regulations. The Regulations do not Prevent an Owner from Taking on the Role of the Builder.

OPEN / OCCUPIED / USED Regulation 20F (1) “ ----- a Certificate of Compliance on Completion shall be submitted ----- and relevant particulars thereof shall be included on the register ------ before works or a building to which Part II or Part IIIA applies may be opened, occupied or used.”

BCAR – SI No. 9 of 2014 Commencement Notice Appointments by Building Owner. Notice of Assignment of Person to Inspect and Certify Works (Assigned Certifier) Notice of Assignment of Builder

BCAR – SI No. 9 of 2014 (Contd) Statutory Certificates Certificate of Compliance (Design) by Design Certifier Certificate of Compliance (Undertaking to Inspect and Certify Works) by Assigned Certifier Certificate of Compliance (Undertaking by Builder) Certificate of Compliance on Completion by Assigned Certifier and Builder

Ancillary Certificates Competence – Core Principle of BC(A)R. Assigned Certifier & Design Certifier Their Competence is Not All Encompassing Must Rely on Competence of Others for Areas Outside Their Own Competence Ancillary Certificates Provide Mechanism for this Reliance

Ancillary Certificates (Contd) Statutory Certificates Refer to Ancillary Certificates Certificate of Compliance (Design) Certificate of Compliance on Completion

CERTIFICATE OF COMPLIANCE (DESIGN) CERTIFICATE IN SI No. 9 of 2014

CERTIFICATE OF COMPLIANCE (COMPLETION) CERTIFICATE IN SI No. 9 of 2014

CERTIFICATE OF COMPLIANCE (COMPLETION) CERTIFICATE IN SI No. 9 of 2014

PHASED COMPLETION Clause 8.4 (COP) “For buildings that are completed for occupation on a phased basis for example houses or apartment blocks, it is appropriate that Certificates of Compliance on Completion for each phase may be submitted separately. ----- In such circumstances, one or more certificates of compliance on completion may be referenced to a single commencement notice”

THE CODE OF PRACTICE, COP REVISED SEPTEMBER 2016

REGULATION 20G.(2) – CODE OF PRACTICE – PRIMA FACIE EVIDENCE Article 20G (1) of the Building Control Regulations makes provision for the Minister to publish a Code of Practice. COP has the same status as the Technical Guidance Documents (TGD’s) The Code of Practice shall, prima facie, indicate compliance with Regulations.

Ancillary Certificates (Contd) Code of Practice COP Defines Ancillary Certificates as:

Ancillary Certificates (Contd) COP Defines a Competent Person as:

Cl. 4.2 – QUALIFICATIONS OF THE DESIGN CERTIFIER AND/OR ASSIGNED CERTIFIER Architects that are on the register maintained by the RIAI under Part 3 of the Building Control Act 2007; or Building Surveyors that are on the register maintained by the SCSI under Part 5 of the Building Control Act 2007, or Chartered Engineers on the register maintained by Engineers Ireland under section 7 of the Institution of Civil Engineers of Ireland (Charter Amendment) Act 1969.

ENGINEER: WHICH ANCILLARY CERTIFICATES Chartered Engineer Can Sign Engineer’s Ancillary Certificates ED, EC and EI. Non-Chartered Engineer Would Have to Complete Ancillary Certificates SD, SC and SI - For Specialist or Unregistered Consultants.

Cl. 4.2.2 - ANCILLARY CERTIFIERS Apart from Assigned Certifier & Design Certifier Range of Certifiers on Most Projects Appointed by: The Building Owner and his Design Team The Builder

Cl. 4.2.2 - ANCILLARY CERTIFIERS Ancillary Certifies may Include: Architects, Architectural Technologists/Technicians Consulting Engineers (Civil/ Structural & Mech/Elec) appointed by Building Owner to design inspect and certify relevant elements

Cl. 4.2.2 - ANCILLARY CERTIFIERS Designers (e.g Piling, Mech/Elec, etc.) appointed by the Builder to design and certify relevant elements Other competent technical and trade persons

Cl. 4.2.2 - ANCILLARY CERTIFIERS The Builder , Sub-contractors, Suppliers & Manufacturers Every Certifier Should Exercise Reasonable Skill, Care and Diligence.

Cl. 3.4 – DESIGNER’S ROLE Design their respective elements; Provide information to the Design Certifier and the Assigned Certifier; Carry out work inspections, as agreed with the Assigned Certifier;

Cl. 3.4 – DESIGNER’S ROLE (Contd) Notify the Assigned Certifier of their proposed inspection regime; Provide the Ancillary Certificates when required by the Assigned Certifier and Design Certifier.

DESIGN CERTIFIER - DEFINITION Definition in COP “Design Certifier” means the competent registered professional person: who has been commissioned by the Building Owner to design, in conjunction with others, the building or works described in the relevant Commencement Notice (or 7 Day Notice), and to certify such design ----, and

DESIGN CERTIFIER – DEFINITION (Contd) who confirms that the documentation included in the schedule to the Commencement Notice (or 7 Day Notice) which has been prepared by him/her, other members of the design team and specialist designers whose design activities he/she has coordinated, has been prepared to demonstrate such compliance.

ASSIGNED CERTIFIER - DEFINITION Definition in COP “Assigned Certifier” means the competent, registered professional person assigned by the Building Owner to inspect and certify works in accordance with the Building Control Regulations.

CL 3.5 ASSIGNED CERTIFIER'S ROLE The Assigned Certifier is assigned by the Building Owner as required under the Building Control Regulations. They undertake to inspect and to co-ordinate the inspection activities of others during construction, and to certify the building or works on completion. The role of Assigned Certifier does not include responsibility for the supervision of any builder. They may or may not be a member of the design team. The Assigned Certifier should -

CL 3.5 ASSIGNED CERTIFIER'S ROLE (Contd) provide and sign the relevant statutory certificates – the form of undertaking at commencement and the Certificates of Compliance on Completion; co-ordinate the ancillary certification by members of the design team and other relevant bodies for the Certificate of Compliance on Completion; (c) identify all design professionals and specialists, in conjunction with the Builder, from whom certificates are required;

CL 3.5 ASSIGNED CERTIFIER'S ROLE (Contd) (d) identify all certificates required and obtain them; (e) co-ordinate and collate all certification of compliance for completion in conjunction with the Builder; (f) in consultation with the members of the design team, plan and oversee the implementation of the Inspection Plan during Construction;

CL 3.5 ASSIGNED CERTIFIER'S ROLE (Contd) (g) prepare the Preliminary Inspection Plan and oversee adherence to this plan, and on completion provide the Inspection Plan as implemented; (h) on termination or relinquishment of their appointment make available to the Building Owner all certification prepared and inspection reports carried out;

CL 3.5 ASSIGNED CERTIFIER'S ROLE (Contd) act as the single point of contact with the Building Control Authority during construction; seek advice from the Building Control Authority, in respect of compliance matters relating to the building or works where disputes or differences of opinion arise between the parties to the project; and Maintains records of inspection

CL 3.5 ASSIGNED CERTIFIER'S ROLE (Contd) Assigned Certifier’s Certification will rely on Inputs of Others Quinn -v- Quality Homes & Others [1976] ILRM Liability will depend on the reasonableness of his approach and his inquiry of others

Ancillary Certificates The Professional Bodies and the CIF Produced: A Suite of Ancillary Certificates Practice Notes on the Ancillary Certificates Plus A Practice Note on Commencement Notice Documentation A Practice Note on Inspection Plans

ANCILLARY CERTIFICATES PRACTICE NOTE 1 ANCILLARY CERTIFICATES

ANCILLARY CERTIFICATES PROFESSIONAL BODY ANCILLARY CERTIFICATES SUMMARY SHEET 1

ANCILLARY CERTIFICATES PROFESSIONAL BODY ANCILLARY CERTIFICATES SUMMARY SHEET 2

ANCILLARY CERTIFICATES CIF ANCILLARY CERTIFICATES SUMMARY SHEET

ANCILLARY DESIGN CERTIFICATE ENGINEER ANCILLARY DESIGN CERTIFICATE ACEI / EI BCR 1401

ANCILLARY COMPLETION CERTIFICATE – DESIGN ENGINEER ANCILLARY COMPLETION CERTIFICATE – DESIGN ACEI / EI BCR 1402

ANCILLARY COMPLETION CERTIFICATE – INSPECTION PLAN ENGINEER ANCILLARY COMPLETION CERTIFICATE – INSPECTION PLAN ACEI / EI BCR 1403

ANCILLARY DESIGN CERTIFICATE ARCHITECT ANCILLARY DESIGN CERTIFICATE RIAI ACD 01

ANCILLARY DESIGN CERTIFICATE SURVEYOR ANCILLARY DESIGN CERTIFICATE SCSI-BS ACD

ANCILLARY DESIGN CERTIFICATE SPECIALIST ANCILLARY DESIGN CERTIFICATE RIAI ACD 02

CIF ANCILLARY COMPLETION CERTIFICATE FOR SUB-CONTRACTOR / SPECIALIST CONTRACTOR

ANNEX TO CIF 01

CIF ANCILLARY COMPLETION CERTIFICATE FOR SUB-SUB-CONTRACTOR CIF 02

ANNEX TO CIF 02

GUIDANCE ON ANCILLARY CERTIFICATES PRACTICE NOTE 2 GUIDANCE ON ANCILLARY CERTIFICATES

PRECAST CONCRETE UNITS EXAMPLE 1 PRECAST CONCRETE UNITS

EXAMPLE 2 STRUCTURAL STEELWORK

TIMBER TRUSSED RAFTERS EXAMPLE 3 TIMBER TRUSSED RAFTERS & OPEN WEB JOISTS

TIMBER TRUSSED RAFTERS EXAMPLE 3 TIMBER TRUSSED RAFTERS & OPEN WEB JOISTS Cont’d

TIMBER FRAMED BUILDINGS EXAMPLE 4 TIMBER FRAMED BUILDINGS

TIMBER FRAMED BUILDINGS EXAMPLE 4 TIMBER FRAMED BUILDINGS Cont’d

EXAMPLE 5 ANCHORS

EXAMPLE 6 PILING

EXAMPLE 7 FACADES

EXAMPLE 8 FIRE ALARM SYSTEMS

FIRE ALARM SYSTEMS Cont’d EXAMPLE 8 FIRE ALARM SYSTEMS Cont’d

UNBOUND GRANULAR FILL UNDER CONCRETE FLOORS & FOOTPATHS EXAMPLE 9 UNBOUND GRANULAR FILL UNDER CONCRETE FLOORS & FOOTPATHS

EXAMPLE 10 SPECIALIST SYSTEMS

PRACTICE NOTE 2 NOTES

COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION PRACTICE NOTE 3 COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION

COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION PRACTICE NOTE 3 COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION (Contd)

COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION PRACTICE NOTE 3 COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION Contd

COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION PRACTICE NOTE 3 COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION Contd

COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION PRACTICE NOTE 3 COMMENCEMENT NOTICE DRAWINGS & DOCUMENTATION Contd

PRACTICE NOTE 4 INSPECTION PLAN

PRACTICE NOTE 4 INSPECTION PLAN Contd

PRACTICE NOTE 4 INSPECTION PLAN Contd

PRACTICE NOTE 4 INSPECTION PLAN Contd

PRACTICE NOTE 4 INSPECTION PLAN Contd

PRACTICE NOTE 4 INSPECTION PLAN Contd

PRACTICE NOTE 4 INSPECTION PLAN Contd

Cl. 7.1 – INSPECTION PLAN Certifiers shall adopt an appropriate Inspection Plan. Adequate site inspections and records sufficient to demonstrate the application of reasonable skill, care and diligence.

Cl. 7.1 – INSPECTION PLAN (Contd) Not practicable to inspect every item of work. Supervision by the Builder is critical. Test of the Inspection Plan – its success in achieving reasonable standards of health and safety in or about buildings, and of energy conservation, accessibility and sustainability for building users .

Cl. 7.1 – INSPECTION PLAN (Contd) Use professional skill and judgement in selecting priorities for inspection. Complexity of project should be taken into account.

CL. 7.1.1 – INSPECTION PLAN (CONTD) Depends on: Type of building Method and speed of construction Recent experience in achieving compliance Consequences of a particular contravention Feasibility of later inspections

CL. 7.1.2 – INSPECTION PLAN (CONTD) Subject to professional judgement or risk assessment, normally inspect elements: Whose failure would be significant With unusual designs or methods of construction Relating to fire safety; Fundamental to achieving compliance with Building Regulations Necessary to issue completion certificate.

Cl. 7.2 – INSPECTION FREQUENCY Periodic inspection depending on size and nature of building. Critical milestone inspections as set out in the Inspection Notification Framework (INF).

Cl. 7.3 – INSPECTION NOTIFICATION FRAMEWORK (INF) The Assigned Certifier shall before commencement on site agree an INF with the building owner and the Builder. Identify generally stages or items of work to be notified by the Builder when ready for inspection. Free to carry out unannounced inspections. A Sample Inspection Plan will be included in the Code of Practice

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER Building Owner Must: Submit a New Notice of Assignment Submit Form of Undertaking Signed by New Assignee

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) The Assigned Certifier Must Provide to the Building Owner and the Building Control Authority (BCA): Records of Inspections to Date Any Available Certification of Compliance of Design and/or Construction to Date. Measures Should be Taken to Ensure that Matters of Fees do not Hinder This.

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) Assigned Certifier / Builder Must Notify the BCA Before Ceasing Their Role If this is not Possible the Building Owner is Required to do so.

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) Change of Assigned Certifier or Builder Significant Alert to Risk Analysis System of the BCA May Trigger Inspection of Design and Other Documents May Trigger a Site Inspection

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) New Assigned Certifier and/or New Builder Should: Review Status of Compliance of Work Completed Deal Appropriately with the Findings This may Involve Consultation with the BCA.

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) Change of Assigned Certifier or Builder Will Require Liaison with the BCA BCA Expected to Advise and Assist the Parties so that The Building or Works Notified at Commencement Stage may get a Valid Certificate of Compliance on Completion

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) May Require: New Commencement Notice including a new Preliminary Inspection Plan These Enable the New Assigned Certifier or Builder to Describe: The Works for Which They are Responsible The Basis Upon Which a Completion Certificate will be issued.

Cl. 4.7 – CHANGE OF ASSIGNED CERTIFIER AND/OR BUILDER (Contd) The New Preliminary Inspection Plan Sets out Necessary Agreed Additional Inspections, Testing or Reports on the Works Already Built.

CL 8.1 SUBMISSIONS AT COMPLETION STAGE (a) A Certificate of Compliance on Completion -------- (b) Plans, calculations, specifications and particulars, showing how the completed building has achieved compliance with the Building Regulations ---- (c) The Inspection Plan as implemented ------

APPENDIX B GUIDANCE FOR INSPECTION PLAN

TABLE C.1 INSPECTION TEMPLATE

TYPICAL SUPPORTING DOCUMENTATION TABLE C.2 TYPICAL SUPPORTING DOCUMENTATION

USE OF PROPER MATERIALS TABLE C.3 USE OF PROPER MATERIALS

BUILDING CONTROL MANAGEMENT SYSTEM (BCMS) New Information Technology Based System Hosted by Local Government Management Agency Preferred Means of Building Control Administration

BUILDING CONTROL MANAGEMENT SYSTEM (BCMS) (CONTD) Only the Four “Statutory” Roles can Engage with the IT system Owner Design Certifier Builder Assigned Certifier

FRAMEWORK FOR BCA's REVISED JUNE 2016

FRAMEWORK FOR BCA’s Revised June 2016 Defines Roles and Duties of BCA’s Risk Assessment by BCA’s Consistency and Standardisation Inspection Levels by BCA’s

COP Cl.3.6 – ROLE OF BUILDING CONTROL AUTHORITIES (BCAs) Code of Practice (COP) BCAs should undertake a risk analysis of each commencement notice to inform its own inspection arrangements. Carry out an appropriate level of assessment and inspection.

COP Cl.3.6 – ROLE OF BUILDING CONTROL AUTHORITIES (BCAs) Carry out a level of inspection equivalent to 12% to 15% of new buildings for which a valid commencement notice has been received. Responsibility remains with the Assigned Certifier, The Builder, Designers and Building Owners.

VALIDATION & REGISTRATION OF COMPLETION CERTIFICATE METHOD 1

VALIDATION & REGISTRATION OF COMPLETION CERTIFICATE METHOD 2

REGISTRATION OF BUILDERS CIRI - Construction Industry Register Ireland Voluntary Registration Initially Compulsory in Future ? Construction Industry Registration Board Complaints and Appeals Committee

LATENT DEFECTS INSURANCE Defects Remedied by LDI Waving of Subrogation Rights ? Excess Critical RIAI Scheme / Homebond Scheme

SI No. 9 - LIABILITY OF THE CONSULTING ENGINEER Liabilities Arise Under Contract In Tort Under Statute

SI No. 9 - LIABILITY OF THE CONSULTING ENGINEER Negligence – Failure to Exercise Reasonable Skill, Care and Diligence. Limit on Liability Direct Loss

SI No. 9 - LIABILITY OF THE CONSULTING ENGINEER PII is Annually Renewable Each and Every Claim / In the Aggregate Limit of Indemnity PII operates on a Claims Made Basis

SI No. 9 - LIABILITY OF THE CONSULTING ENGINEER Joint & Several Liability – Last Man Standing Importance of Notification Fitness for Purpose / Indemnities Excess

Burj Khalifa, Dubai Finished in 2010 829.8m High

Kingdom Tower, Jeddah Construction started in 2013 Estimated Completion 2019 At Least 1000m High

Millau Viaduct, France Opened 2004 2460m Long, 32 Millau Viaduct, France Opened 2004 2460m Long, 32.05m Wide, 343m Highest Pylon above ground, 343m Longest Span

When It All Goes Wrong ?

ONE WORLD TRADE CENTRE NEW YORK Budget: £337m Cost at Opening in 2014: £2.5bn The Most Expensive Skyscraper Ever Built

SCOTTISH PARLIAMENT BUILDING Completion - 2004 Three Year Delay Original Cost: £10m - £40m Actual Cost: £414m

JUBILEE LINE EXTENSION Completion - 1999 Delay - One Year Original Cost: £2.1 bn Actual Cost: £3.5 bn

SYDNEY OPERA HOUSE Completion - 1973 Delay - Ten Years Original Cost: £3.5m Actual Cost: £51m

THE BIG DIG, BOSTON Completion - 2007 Delay - Nine Years Original Cost: £3.8 bn Actual Cost: £14 bn (est.)

ELBPHILHARMONIE, HAMBURG Completion - 2016 Delay - Six Years Original Budget: € 77 m Final Cost: € 789 m

GUGGENHEIM BILBAO Bilbao Effect 300,000 Extra Visitors Anually