Designers’ Manual Appendix Contents

Slides:



Advertisements
Similar presentations
USDA - RURAL DEVELOPMENT
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Contract CloseOut.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Close Out CTC-470.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
Construction Engineering 221 Drawings and Specifications.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Module 7: Construction Phase
Standards of Practice Course
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Walkthrough February 27 – Mar 3, 2006, Zagreb, ECA.
Specification & Quantities Estimating
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
VI. Developing a VSMP Program General Stormwater Training Workshop.
PMP Study Guide Procurement Management (Chapters 9, 10, and 12)
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Office of Procurement Services.  Vendor Application Website: 
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
FIDIC Tendering Procedures
CONSTRUCTION ADMINISTRATION Quality Control, Responsibility & Liability TQC Presentation 01/17/08.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Sun City Lift Station Odor Control Improvements
Understanding and Complying with Audits
Construction Oversight
Guidelines for auditing Grid CAs
State Aid Construction
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
City of New Bedford HOUSING REHABILITATION DEPARTMENT OF PLANNING,
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
Administrator of Construction Todd Wilson Senior Project Manager
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Manajemen Konstruksi Bidding & Award
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
State Aid Construction
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Presentation transcript:

Designers’ Manual Appendix Contents Training Session for LGIs June 20, 2018

Appendix 1: AGENDAS A31 Agenda for Pre-Design Conference A32 Program Phase Meeting Agenda A34 Schematic Design Phase Meeting Agenda A36 Design Development Phase Meeting Agenda A38 Construction Document Phase Meeting Agenda

Appendix 1: AGENDAS (continued) A52 Pre-Bid Conference Agenda A62 Pre-Construction Conference Agenda A64 Construction Progress Meeting Agenda A66 Substantial Completion Meeting Agenda A68 Final Inspection Meeting Agenda

Appendix 1: CHECKLISTS C32 Schematic Design Phase Document Checklist C34 Design Development Phase Document Checklist C36 Construction Document Phase Document Checklist C38 Bid Document Submittal Checklist

Appendix 1: CHECKLISTS (continued) C42 Standard Document Instructions and Checklist C44 Stormwater Review Plan Checklist C62 Stormwater Site Audit Checklist C72 Project Closeout Checklist

Appendix 1: FORMS F22 Designers Agreement Information F23 Attestation F32 Designer's Cost Estimate F54 Bid Tab

Appendix 1: FORMS (continued) F62 Pre-Construction Data Sheet F64 Request for Proposal F66 Proposal Recommendation F68 Report of Final Inspection

Appendix 1: FORMS (continued) F72 Certificate of Substantial Completion F74 Stormwater As-Built Certification F78 Advertisement of Final Payment F79 Report of One-Year Corrective Inspection SBC-25 Project Information

Appendix 2: STANDARD BIDDING AND CONSTRUCTION DOCUMENTS 00 11 16 Invitation to Bid 00 21 13 Instructions to Bidders 00 30 00 Information Available to Bidders 00 31 26 Asbestos Survey Information Available to Bidders 00 31 32 Geotechnical Information Available to Bidders

Appendix 2: STANDARD DOCS (continued) 00 41 13 Bid Form 00 47 13 Construction Bid Envelope 00 52 13 Agreement 00 61 13 Contract Bond 00 61 43 Three Year Roof Bond

Appendix 2: STANDARD DOCS (continued) 00 72 03 General Conditions marker for AIA A201 00 72 13 General Conditions of the Contract for Construction (in AIA Contract Documents Site) 00 73 16 Supplementary Conditions (??) 00 73 43 Supplementary Conditions: State Wages (??) 00 73 45 Supplementary Conditions: Federal Wages

Appendix 2: STANDARD DOCS (continued) 01 00 00 General Requirements 01 21 13 Allowances 01 21 15 List of Allowances 01 22 13 Unit Prices 01 22 15 List of Unit Prices 01 23 00 Alternates 01 25 13 Product Substitution Procedures 01 25 33 Product Substitution Request Form

Appendix 2: STANDARD DOCS (continued) 01 26 00 Contract Modification Procedures 01 26 20 Weather Delays 01 26 25 Weather Delay Report 01 26 40 Form for Amendment, Change Order, or Directive 01 26 54 Form for Price Summary 01 26 55 Form for Price of Work 01 26 56 Form for Price of Time

Appendix 2: STANDARD DOCS (continued) 01 29 54 Retainage Escrow Initiation 01 29 73 Schedule of Values 01 29 76 Progress Payment Procedures 01 31 19 Project Meetings 01 31 90 Administrative Logs 01 31 93 Visitor Log

Appendix 2: STANDARD DOCS (continued) 01 32 00 Construction Progress Documentation 01 41 15 Basic Regulatory Requirements 01 50 00 Temporary Facilities and Controls 01 57 23 Temporary Storm Water Pollution Control 01 60 00 Product Requirements

Appendix 2: STANDARD DOCS (continued) 01 77 70 Closeout Procedures 01 78 01 Closeout Submittals 01 78 02 Closeout Submittals 01 78 25 Data Binder Receipt 01 78 88 Report of Subcontractors and Suppliers 01 79 21 Demonstration and Training 01 79 25 Demonstration and Training Verification

Appendix 2: STANDARD DOCS (continued) 01 81 13 HPBr 01 81 14 HPBr Contractor Requirements 01 91 13 Commissioning 01 91 23 Performance Testing Identification Form 01 91 26 Performance Testing Procedures Form 01 91 29 Functional Performance Test Certification

Appendix 2: STANDARD DOCS (continued) 07 50 36 Total Roofing System Warranty 07 61 02 Twenty Year Total Metal Roofing System Warranty 23 08 00 Mechanical & Control Systems Commissioning 23 08 13 Sensor Point Calibration Check Sheet

Appendix 2: STANDARD DOCS (continued) 23 08 16 Terminal Box Point Calibration Check Sheet 26 08 00 Electrical & Lighting Systems Commissioning 26 08 06 Panelboard Check Sheet 26 08 13 Power Circuit Check Sheet 26 08 30 Generator Testing Procedures Form 26 08 32 Generator Testing Findings Form 26 08 50 Lighting Check Sheet

Appendix 3: SYSTEM OR CAMPUS SPECIVIC GUIDELINES AND REQUIREMENTS Campus Design Guidelines SBC Approved Proprietary Standards IT Requirements System or Campus Storm Water Requirements, SWPPP System or Campus Commissioning Record Documents Requirements, Formats Campus Flow Charts

Appendix 3: PROPRIETARY SPECIFICATIONS In general, campus specific specifications should be considered guidelines, for use by the Designer to prepare specifications to assure consistency with the design and contract documents. All proprietary items must have approval by the OSA in advance of bidding, or must be developed into competitive bid items, or as performance specifications.