P802.11s report to EC on request for approval to proceed to RevCom

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
HTC 34; 5656 AE Eindhoven, the Netherlands
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
TGs San Diego Closing Report
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
HTC 34; 5656 AE Eindhoven, the Netherlands
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
TGs Waikoloa Closing Report
TGs LA Closing Report Date: Author: January 2011
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
TGs Waikoloa Closing Report
TGs Dallas Closing Report
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
July 2011 EC Motions Date: Authors: July 2011
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
TGs San Diego Closing Report
Presentation transcript:

P802.11s report to EC on request for approval to proceed to RevCom November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 P802.11s report to EC on request for approval to proceed to RevCom Date: 2011-07-22 Authors: Name Company Address Phone Email Dee Denteneer Philips HTC 34; 5656AE Eindhoven; The Netherlands +31 40 2749743 Dee.denteneer@philips.com Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for approval to send IEEE P802.11s to RevCom. This document was approved during the closing plenary session of the 802.11 working group on July 22, 2011. Passed in the Working Group x-x-x D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

TGs is ready for RevCom Recirculation ballots are complete November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 TGs is ready for RevCom Recirculation ballots are complete After the last recirculation ballot: The approval percentage was 97.2%. There were no new valid disapprove votes. There were no new valid disapprove comments. No changes were made as a result of the final recirculation ballot. D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

IEEE 802 Sponsor Ballot Results – P802.11s November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 IEEE 802 Sponsor Ballot Results – P802.11s Draft Opened Closed Days Ballot Type Pool Approve Disapprove Abstain Return D7.0 2010-10-02 2010-11-01 30 Initial 184 123 95% 6 5% 10 7% 139 83% D8.0 2010-12-20 2011-01-10 21 Recirc 1 131 96% 4% 11 148 88% D9.0 2011-02-18 2011-03-05 15 Recirc 2 134 7 9 6% 150 D10.0 2011-03-25 2011-04-09 Recirc 3 140 97% 5 3% 154 89% D11.0 2011-04-22 2011-05-07 Recirc 4 D12.0 2011-05-20 2011-06-04 Recirc 5 141* 4 *After the final recirculation ballot, two of the disapprove voters indicated their wish to change their vote form “Disapprove” to “Approve” increasing approval rate to 99% D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Comments by Ballot – P802.11s July 2011 November 2008 doc.: IEEE 802.11-08/1437r1 Comments by Ballot – P802.11s July 2011 Draft Ballot Total Known Unsatisfied D7.0 Initial 307 2 D8.0 Recirc 1 367 D9.0 Recirc 2 291 D10.0 Recirc 3 246 D11.0 Recirc 4 236 D12.0 Recirc 5 1 1448 D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments by Commenter November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 Unsatisfied Comments by Commenter Commenter D7.0 D8.0 D9.0 D10.0 D11.0 D12.0 Total J. Rosdahl (CSR) 1 M. Benveniste (En-aerion) 2 D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments – Topics November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 Unsatisfied Comments – Topics Topic #Comments Definition 1 MAC Total 2 D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2011 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. D. Denteneer (Philips), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Mandatory coordination June 2009 November 2008 doc.: IEEE 802.11-09/0674r0 doc.: IEEE 802.11-08/1437r1 July 2011 Mandatory coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D7.0 July 2010 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) D. Denteneer (Philips), B.Kraemer (Marvell) Page 9 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

802.11 EC Motion –Approval to send P802.11s to RevCom June 2009 November 2008 doc.: IEEE 802.11-09/0674r0 doc.: IEEE 802.11-08/1437r1 July 2011 802.11 EC Motion –Approval to send P802.11s to RevCom Motion: Approve sending P802.11s D12.0 to RevCom. Moved: Bruce Kraemer Second: Jon Rosdahl Working Group vote on the motion passes: y-n-a D. Denteneer (Philips), B.Kraemer (Marvell) Page 10 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel