Status of T18 in resonant ring processing

Slides:



Advertisements
Similar presentations
Dual mode bph6 bph TM F TM R TE R TE F TM F TM R.
Advertisements

IK Slide 0 First look at the WCM data from July 2012 September 6 th 2012 Ian Kirkman.
Lab 10 :Serial Data Transfer System:
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Single-Cell Standing Wave Structures: Design
Single cell standing wave tests data analysis Jiaru Shi Sep 27, 2011 LCWS11, Granada, Spain.
Sciences Lesson Plans Lesson Plans. Jason April 21 What is energy? What is energy? Workbook 37 Workbook 37.
2.4 (cont.) Changing Units of Measurement How shifting and rescaling data affect data summaries.
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
Injector RF Design Review November 3, 2004 John Schmerge, SLAC  and 0 Mode Interaction in RF Gun John Schmerge, SLAC November.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Dual Mode Cavity for Testing Effects of RF Magnetic field on Breakdown Properties A. Dian Yeremian, Valery Dolgashev, Sami Tantawi SLAC National Accelerator.
Design of Standing-Wave Accelerator Structure
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
Unit 12 Registers and Counters Ku-Yaw Chang Assistant Professor, Department of Computer Science and Information Engineering Da-Yeh.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Photonic Band Gap Accelerator Experiments Roark Marsh Massachusetts Institute of Technology, Plasma Science and Fusion Center Accelerator Seminar 1/27/2009.
Particle-in-Cell Modeling of Rf Breakdown in Accelerating Structures and Waveguides Valery Dolgashev, SLAC National Accelerator Laboratory Breakdown physics.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
WIRE: many pulses effects Goran Skoro (University of Sheffield) Target Meeting 6 April 2006.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
June 2007, CERN. HDS 60 (cells) copper was processed from both sides Low Vg a/λ=0.16 High Vg a/λ=0.19 HDS 11 titanium Very often we do observe, that after.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
David H. Dowell and Friends SLAC National Accelerator Laboratory David H. Dowell and Friends SLAC National Accelerator Laboratory The LCLS Gun ICFA Beam.
A. Fabich, CERN MERIT collaboration meeting, CERN, 7-8 February 2008 MERIT beam intensities, Feb 08A. Fabich, CERN1.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
Heat load of the radiation cooled Ti target of the undulator based e+ source Felix Dietrich (DESY, TH-Wildau),Sabine Riemann(DESY), Andriy Ushakov(U- Hamburg),
Frequency-domain study of acceleration & beam loading based on a circuit model by raquel fandos.
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
MEIC Electron Ring Injection from CEBAF
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
I. Syratchev, structure team meeting, Re-circulation Re-visited I. Syratchev.
The US High Gradient Collaboration Vision for Research and Development on Ultra High Gradient Accelerator Structures Sami Tantawi, SLAC ( on behalf of.
Tao Tang, Craig Burkhart
June 16, 2015 CLIC WORKSHOP JANUARY 18 – 22, 2016 OPTIMIZED RF UNIT I 1 January 21, 2016 By: Mikael Lindholm.
TTF-III Coupler Parts Processing and Multipacting Simulation using Magic Faya Wang Dec Wake Fest 07 – ILC wakefield workshop at SLAC.
Superconducting Materials Testing With a High-Q Copper RF Cavity Sami Tantawi, Valery Dolgashev, Gordon Bowden, James Lewandowski, Christopher Nantista.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
CLOUD. CLOUD: Data Flow HS2 HS2 XYZ XYZ Load HS2 Files, Save HS2 or XYZ Load MTX Files, Save MTX or XYZ Load XYZ Files, Save XYZ MTX MTX LAS,LAZ E57LASLAZ.
High Speed Properties of Digital Gates, Copyright F. Canavero, R. Fantino Licensed to HDT - High Design Technology
Directing groups.
e-Cloud Simulations for LHC LPA upgrade scheme
DRAWING ATOMIC MODELS.
Using Time-Resolved Retarding Field Analyzer Measurements to Determine the SEY Mitigation Effectiveness of Grooves -- Bonus: first look at last night's.
SLAC National Accelerator Laboratory
Review of rf structure test results
MERIT beam intensities
Simple machines - Levers
Beam Loading Effect in CEPC APDR
Dual mode bph 30 bph TMF TMR TMF TMR TEF TER.
Phone Number BINGO!!!.
ILC DR instability simulations
RF Pulse Shaping.
Beam dump for J-Parc neutrino facility
Calorimeter Transient Analysis
Harmonic Cancellation Connecting Loads Through Phase Shifting Transformers Dave Loucks, Ph.D., PE, CEM.
Atomic Structure An atom is the smallest unit of matter
CEPC SRF Parameters (100 km Main Ring)
Characterization of Wired-OR prototype board
Field-Emission mapping measurement on Copper Surface
Presentation transcript:

Status of T18 in resonant ring processing Valery Dolgashev, Jim Lewandowski and Stephen Weathersby 13 April 2011 SLAC

Pulse shape, 100 ns charging + 1500 ns flat structure input ring load structure input ring input pulse heating File: ppm_data_Mar29_2011, trace#: 1200 with time stamp:{29,3,2011,10,29,51,210} PulseLength:1.54 [us] Pulse Heating: 8.63429 [deg. C]

Pulse shape, 100 ns charging + 600 ns flat structure input structure input ring load ring input pulse heating File: ppm_data_Apr05_2011 , trace#: 1200 with time stamp: {5,4,2011,8,39,44,128} PulseLength: 0.64 [us] Pulse Heating: 34.037 [deg. C]

Pulse shape, 100 ns charging + 250 ns flat structure input structure input ring input pulse heating ring load File: ppm_data_Apr12_2011, trace#: 1200 with time stamp:{12,4,2011,8,41,20,757} Max. PulseLength:0.28 [us] Pulse Heating: 24.885 [deg. C]

Pulse shape, 100 ns charging + 100 ns flat structure input structure input ring input pulse heating ring load File: ppm_data_Apr20_2011 , trace#: 1200 with time stamp: {20,4,2011,8,22,35,155} PulseLength: 0.12 [us] Pulse Heating: 18.169 [deg. C]

T18 in resonant ring, last ~180 hours of processing up to end of shift on April 21st 2011 100 ns flat 250 ns flat 1.5 us flat 600 ns flat 100 ns flat 250 ns flat 1.5 us flat 600 ns flat 1.5 us flat 600 ns flat 250 ns flat 100 ns flat

Summary of T18 in resonant ring up to end of shift on April 12th 2011 250 ns 400 ns 200 ns 200 ns 1500 ns 250 ns 100 ns 1500 ns 100 ns 600 ns 600 ns 400 ns Valery Dolgashev, Jim Lewandowski and Stephen Weathersby, 13 April 2011

Summary of T18 in resonant ring up to end of shift on April 21st 2011 250 ns 400 ns 200 ns 200 ns 1500 ns 250 ns 100 ns 1500 ns 100 ns 600 ns 600 ns 400 ns 100 ns (2nd experiment) 100 ns (2nd experiment) Valery Dolgashev, Jim Lewandowski and Stephen Weathersby, 26 April 2011