CSP – Remodel Gate Services Building for USDA at Bayport Terminal

Slides:



Advertisements
Similar presentations
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Advertisements

Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session 05 August 2013 The Road Accident Fund.
Security Equipment RAF/2012/00042 Compulsory Briefing Session 15 April 2013 RAF – Centurion - GP.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session 06 August 2013 The Road Accident Fund.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
What Small Method Is It? Presented by Jan Giffin, CPPO, CPPB, VCO eVA Business Manager And Katherine Bosdell, CPPB, VCO Statewide Contract Officer.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
DOING BUSINESS WITH ALBERTA INFRASTRUCTURE
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Procurement & Strategic Sourcing Commercial Print Services
Project # Prakash Vara Sourcing Specialist
Pre-Bid/Proposal Meeting
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing Boiler T&M Repair & Maintenance
Offsite Storage RAF/2013/00023 Compulsory Briefing Session
Tender Evaluation and Award Process
Joint Parking Task Force Update Procurement & Strategic Sourcing
After the FCC Form 471 E-rate Program Applicant Training
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing Charter Bus Transportation Services
Office Alterations RAF/2012/00027 Compulsory Briefing Session
PRE-PROPOSAL CONFERENCE
Joint Parking Task Force Update Procurement & Strategic Sourcing
Security Equipment RAF/2012/00042 Compulsory Briefing Session
Memorandum of Understanding with GE Osmonics, Inc
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Office Space-Relocation of Johannesburg RAF Office: RAF/2013/00024 Non -Compulsory Briefing Session The Road Accident Fund 06 August 2013.
Procurement & Strategic Sourcing FPM Parking Structure Lighting
Procurement & Strategic Sourcing
Washington Metropolitan Area Transit Authority (WMATA)
Joint Parking Task Force Update Procurement & Strategic Sourcing
CSB Wharf 11/12 Collision Repair at Turning Basin Terminal – DC 1170
Request for Proposal and Specifications for
Request for Proposal and Specifications for
Drainage Improvements at VW Yard (RFQ-101)
Procurement & Strategic Sourcing Elliman Air Handling Units
Procurement & Strategic Sourcing Matthaei Weight Room Flooring
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Procurement & Strategic Sourcing Elliman Air Handling Units REBID
Security Equipment RAF/2012/00030 Compulsory Briefing Session
Washington Metropolitan Area Transit Authority (WMATA)
Procurement & Strategic Sourcing
CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
Procurement & Strategic Sourcing
Learn about bidding the Facility Services Targeted Small Business Enterprise Tier 2 Program Welcome Confirm who is doing the speaking for each slide……
Outagamie County Pre-Proposal Meeting
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO CONDUCT A MARKET DEMAND STUDY AND BUSINESS CASE ANALYSIS FOR REDUCTION OF EMISSIONS THROUGH INTERMODAL.
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session The Road Accident Fund 05 August 2013.
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Presentation transcript:

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics

Port Commission John D. Kennedy Dean E. Corgey Clyde Fitzgerald Theldon R. Branch, III Stephen H. DonCarlos Roy D. Mease Janiece M. Longoria Chairman WELCOME MESSAGE | 2

All attendees must sign-in and indicate attendance for site visit CSCSP – Vegetate Middle Berm at Bayport Container Vegetate Middle Berm at Bayport at Bayport Container Terminal e Middle Berm at Bayport Container Terminal AGENDA Introductions Harris County Small Business Procurement Services Selection Criteria [Site] Parameters Questions All attendees must sign-in and indicate attendance for site visit

CSP – Remodel Gate Services Building for USDA at Bayport Terminal PHA Personnel: Roger H. Hoh, P.E. – Director, PCM Nick Kotsatos–Construction Manager Bill Aguirre, P.E. – Project Manager Ross Talbot – Construction Delivery Mgr. Pedro Gonzales – Small Business Development Ryan Mariacher– Sr. Dir. Container Terminals Harris County: Robert Rocha – Wage Rate Monitor

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Harris County Wage Rate Compliance & Requirements: Attendance at pre-bid/proposal meetings and pre- construction meetings Review and approve weekly certified payroll records Monitor wage rate compliance Review claims of non-compliance from the field and recommend appreciate responses as required or permitted under the Wage Scale Act

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Small Business Requirement: Participation Goal Small Business is 0% of the Purchase Price Small Business Participation and the Local Business criterion shall not exceed the Relative Weight of 3%.

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Procurement: Competitive Sealed Proposals(CSP) are due on November 14th, 2018 no later than 11:00 A.M. One original and five copies, packaged in one sealed envelope All proposals will be opened and read publicly in the PHA first floor conference room by Procurement Services on Wednesday, November 14th, 2018 at 11:30 A.M.

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Selection Criteria The Port Commission will award the contract to the responsible proposer submitting the lowest and best proposal. Responsible: Meet the applicable Small Business Participation requirements, if any; Have the ability to comply with the required delivery or performance schedule, taking into consideration other business commitments; Have a satisfactory record of performance and integrity; Have satisfactory safety and environmental record; Have satisfactory references; and Have the necessary facilities, equipment, materials, personnel, organization, experience, authorizations, technical skills, and financial resources to fulfill the terms of the contract for the project

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Competitive Sealed Proposal Response: Page 2 – Required Attachments

CSP – Remodel Gate Services Building for USDA at Bayport Terminal Price Exhibit – organized by specification division Not a divisible proposal Items identified for add and deduct must be justified prior to use and are not in contract cost ALL BLANKS MUST BE FILLED IN ON EVERY PAGE OF THE PRICE EXHIBIT

CSP – Remodel Gate Services Building for USDA at Bayport Terminal All references to price are on the pricing sheet Specifications govern over drawings Fixed Price items will be billed on a Schedule of Values

Special Conditions Excerpts A site walk is not mandatory for every respondent Contract is for a maximum of 140 calendar days No incentive paid for early completion Work by Own Forces is a minimum of 10% Liquidated damages is $2802/day North end of the building must remain operational during the construction period. Coordination with Operations and Maintenance Personnel will be coordinated in advance This is a TWIC secure project Escort services are required

Safety vests, hard hat, safety glasses, where required CSP – Remodel Gate Services Building for USDA at Bayport Terminal Site Visit on October 18, 2018 10pm Safety vests, hard hat, safety glasses, where required No open-toed shoes Personal flotation devices if within 20’ of face of wharf Comply with your company’s safety policy photographs – only in specified areas of the building Stay with group A valid government issued Photo ID is required to go on the walk

THANK YOU Questions? www.PortHouston.com Brenda C. Trevino, P.E. Project Manager Port Houston Questions? www.PortHouston.com 111 East Loop North Houston, TX 77029