OUTLINE of TALK Overview Motivation, LC-TPC R&D Status

Slides:



Advertisements
Similar presentations
TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
Advertisements

Amsterdam, March 31, 2003 P. Colas - European R&D for gaseous trackers 1 European gaseous tracking hardware HistoryHistory GEM and MicromegasGEM and Micromegas.
D. Peterson, “Gaseous Tracking”, Review of US Program for Detector R&D for the ILC, Argonne Nat. Lab., Gaseous Tracking Daniel Peterson, Cornell.
D. Peterson, “Development of a TPC for the ILC”, NSF Site Visit, 18-April of 24 Development of a TPC for the ILC Dan Peterson L. Fields R. S. Galik.
D. Peterson, Cornell Univ., “Round table” 23-Jan-2003 Cornell Linear Collider Detector Research Cornell Interests: The Cornell group proposes to contribute.
28/10/2004 Ron Settles MPI-Munich/DESY Desy Physics Review Committee Meeting October LC-TPC R&D (Goals, Status, Plans) Ron Settles MPI-Munich/DESY.
Carleton University A. Bellerive, K. Boudjemline, R. Carnegie, A. Kochermin, J. Miyamoto, E. Neuheimer, E. Rollin & K. Sachs University of Montreal J.-P.
LC TPC R&D Results Cornell WS July Selected LC TPC R&D Results (DESY RPC) for the Cornell WS July 2003 The LC TPC R&D Groups of the PRC R&D-01/03.
IHEP, Bejing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
13/09/2006Ron Settles MPI-Munich/DESY 9th WP phonemeeting 13 September LCTPC/LPWP-9th phonemeeting –Date 13 September 2006 –Time 7:00 west coast.
21/12/2006 Ron Settles MPI-Munich TUM Dec ILC, LCTPC Design Issues: R&D Planning 1 Status of the ILC, issues for the LCTPC design and their feedback.
27/11/2006 Ron Settles MPI-Munich Tsinghua Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback to the R&D program.
Snowmass, August, 2005P. Colas - Micromegas TPC beam tests1 A.M. Bacala, A. Bellerive, K. Boudjemline, P. Colas, M. Dixit, K. Fujii, A. Giganon, I. Giomataris,
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
TPC in ILD ILC/ECFA - Warsaw 11 June 2008 Jan Timmermans NIKHEF.
09/11/2006 Ron Settles MPI-Munich/DESY Valencia ECFA WS Nov LCTPC Design Issues: R&D Planning 1 Issues for the LCTPC design and their feedback.
An Integrated Single Electron Readout System for the TESLA TPC Ton Boerkamp Alessandro Fornaini Wim Gotink Harry van der Graaf Dimitri John Joop Rovekamp.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
23/08/2005 Ron Settles MPI-Munich/DESY Snowmass2005 TPC Large Prototype1 TPC R&D, Tasks towards the Design of the ILC TPC LC TPC R&D Groups OUTLINE of.
Development of a TPC for the Future Linear Collider on behalf of the LC TPC groups Aachen, Berkeley, Carleton, Cracow, DESY, Hamburg, Karlsruhe, MIT, Montreal,
ILC TPC resolution studies with charge dispersion in MPGDs with a resistive anode Madhu Dixit Carleton University & TRIUMF IPNS KEK 14/05/2005.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
10 Nov Ron Settles MPI-Munich LCTPC advanced-endcap studies for the LOI1 Continuation of LCTPC “advanced- endcap” planning for the ILD LOI ILD Logo.
30/08/2006Ron Settles MPI-Munich/DESY 8th WP phonemeeting 30 August LCTPC/LPWP-8th phonemeeting –Date 30 August 2006 –Time 7:00 west coast 10:00.
IHEP, Beijing 9th ACFA ILC Physics and Detector Workshop & ILC GDE Meeting The preliminary results of MPGD-based TPC performance at KEK beam.
2/9/04 1 LBNL LC-TPC Activities ● International LC-TPC R&D ● Physics and Detector Simulations ● Micromegas-based TPC R&D ● US-Japan TPC R&D Proposal ●
A New GEM Module for a Large Prototype TPC: Status and Plans By Stefano Caiazza On behalf of the FLC DESY.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
21/10/2007 Ron Settles MPI-Munich/DESY LCTPC Collaboration Meeting Fermilab 21 October MOA and Addendum General idea: 1. Short (“loose”) MOA giving.
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
GLD central-tracker task-list (with start of assigning names to the tasks) Performance/Simulation (names) Design (names) Backgrounds/alignment/distortion.
07/03/2008 Ron Settles MPI-Munich TPC B-field1 On the Magnetic-field Requirements for the LC TPC OUTLINE of TALK Status of Discussion.
11/10/2006Ron Settles MPI-Munich/DESY 11th WP phonemeeting 11 October LCTPC/LPWP-11th phonemeeting –Date 11 October 2006 –Time 7:00 west coast 10:00.
11/09/2008 Ron Settles MPI-Munich/DESY LCTPC planning for the LOI1 LCTPC issues for the ILD LOI ILD Logo goes here.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
5 February 2007 Ron Settles MPI-Munich/Desy Beijing BILCW07 Tracking Review LCTPC Design, R&D Issues1 TPC R&D for an ILC Detector Beijing Tracking Review.
02/08/2006Ron Settles MPI-Munich/DESY 6th WP phonemeeting 02 August LCTPC/LPWP-6th phonemeeting –Date 2 August 2006 –Time 7:00 west coast 10:00.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
ROSIER Ph End cap – TPC - LC Arrangements of detectors on the active area of the end cap (1/2) Squares, rectangles, lozenge of 300/350 mm or.
19 Jan Ron Settles MPI-Munich LCTPC advanced-endcap for the ILD- LOI1 ILD Logo goes here Iteration on LCTPC “advanced-endcap” for the ILD LOI…
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Gaseous Tracker R&D ILC Detector Test Beam Workshop Fermi National Accelerator Laboratory January 17-19, Madhu Dixit Carleton University & TRIUMF.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
TPC for 4-th concept S.Popescu IFIN-HH, Bucharest.
Large Prototype TPC using Micro-Pattern Gaseous Detectors
P. Colas for the LC TPC collaboration
ILC Detector R&D in Japan
Micromegas module for ILC-TPC
Toward the final design of a TPC for the ILD detector
Recents Analysis Results From Micromegas TPC
Ron Settles MPI-Munich/DESY 7th ACFA WS Taipei 9-12 Nov. 2004
OUTLINE of TALK Overview of the question Framework, TPC R&D status
Progress at Snowmass on some ILC physics, machine and detector issues
Carleton/Montreal/Victoria
WP-conveners 3rd phone meeting
Why do we want a TPC? P. Colas, CEA Saclay
Issues for the LC-TPC design and their feedback to the R&D program
WP-conveners 2nd phone meeting
TPC Paul Colas Technical meeting, Lyon.
LCTPC remarks for closed session
Paul Colas, CEA Saclay, Akira Sugiyama, Saga U.
TPC Development at Cornell
Ron Settles MPI-Munich ALCPG09 Testbeam Session
Ron Settles MPI-Munich/DESY TPC Collaboration
Why do we want a TPC? P. Colas, CEA Saclay
WP-conveners 1st phone meeting
Large TPCs for HEP RD51 P. Colas Lanzhou U., Saclay, Tsinghua U.
Covering a Large Area ILC-TPC endplate
Presentation transcript:

R&D issues for the LC-TPC design and their feedback to the Large Prototype OUTLINE of TALK Overview Motivation, LC-TPC R&D Status Next step: Build the Large Prototype (LP) The LC TPC design issues LC-TPC/LP Work Packages 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Temple/Wayne State (UCLC) TPC R&D Groups Europe RWTH Aachen CERN DESY U Hamburg U Freiburg U Karlsruhe UMM Krakow Lund MPI-Munich NIKHEF BINP Novosibirsk LAL Orsay IPN Orsay U Rostock CEA Saclay PNPI StPetersburg U Siegen America Carleton U Cornell/Purdue Indiana U LBNL MIT U Montreal U Victoria Yale Asia Tsinghua U XCDC: Hiroshima U Minadamo SU-IIT Kinki U U Osaka Saga U Tokyo UAT U Tokyo Kogakuin U Tokyo KEK Tsukuba U Tsukuba Other MIT (LCRD) Temple/Wayne State (UCLC) …Other groups interested? NB: Started as subset of these groups working together reporting to the DESY PRC; it has recently been expanding so that the organization has to be updated… 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

To design and build an ultra-high performance HISTORY 1992: First discussions on detectors in Garmisch-Partenkirschen (LC92). Silicon? Gas? 1996-1997: TESLA Conceptual Design Report. Large wire TPC, 0.7Mchan. 1/2001: TESLA Technical Design Report. Micropattern (GEM, Micromegas) as a baseline, 1.5Mchan. 5/2001: Kick-off of Detector R&D 11/2001: DESY PRC proposal. for TPC R&D (European & North American teams) 2002: UCLC/LCRD proposals 2004: After ITRP, WWS R&D panel Europe Chris Damerell (Rutherford Lab. UK) Jean-Claude Brient (Ecole Polytechnique, France) Wolfgang Lohmann (DESY-Zeuthen, Germany) Asia HongJoo Kim (Korean National U.) Tohru Takeshita (Shinsu U., Japan) Yasuhiro Sugimoto (KEK, Japan) North America Dan Peterson (Cornell U., USA) Ray Frey (U. of Oregon, USA) Harry Weerts (Fermilab, USA) GOAL To design and build an ultra-high performance Time Projection Chamber …as central tracker for the ILC detector, where excellent vertex, momentum and jet-energy precision are required 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Large Detector Concept example Particle Flow .30 (N.B. below are TDR dimensions, which have changed for latest LDC iteration) -5 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Physics determines detector design momentum: d(1/p) ~ 10-4/GeV(TPC only) ~ 0.6x10-4/GeV(w/vertex) (1/10xLEP) e+e-gZHgll X goal: dMmm <0.1x GZ  dMH dominated by beamstrahlung tracking efficiency: 98% (overall) excellent and robust tracking efficiency by combining vertex detector and TPC, each with excellent tracking efficiency 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

R&D Planning 1) Demonstration phase 2) Consolidation phase Continue work with small prototypes on mapping out parameter space, understanding resolution, etc, to prove feasibility of an MPGD TPC. For CMOS/Si-based ideas this will include a basic proof-of-principle. 2) Consolidation phase Build and operate the LP, large prototype, (Ø ≥ 75cm, drift ≥ 100cm), with EUDET infrastructure as basis, to test manufacturing techniques for MPGD endplates, fieldcage and electronics. LP design is starting  building and testing will take another ~ 3 years. 3) Design phase After phase 2, the decision as to which endplate technology to use for the LC TPC would be taken and final design started. 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

“To-do” list for next few weeks/months Detector Outline Documents (LDC and GLD) LP planning Detector Workshops (Instrumentation@Slac and TPC Applications@LBNL) 3-8April2006 Status report to the Desy PRC 11May2006 (written version due four weeks earlier) Organization of the LC TPC collaboration 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

What are we doing in Phase 1 ? 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Gas-Amplification Systems: Wires & MPGDs GEM: Two copper foils separated by kapton, multiplication takes place in holes, uses 2 or 3 stages Micromegas: micromesh sustained by 50μm pillars, multiplication between anode and mesh, one stage P~140 μm D~60 μm S1/S2 ~ Eamplif / Edrift S1 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning S2

Examples of Prototype TPCs Carleton, Aachen, Cornell/Purdue,Desy(n.s.) for B=0or1T studies Saclay, Victoria, Desy (fit in 2-5T magnets) Karlsruhe, MPI/Asia, Aachen built test TPCs for magnets (not shown), other groups built small special-study chambers 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Facilities Saclay 2T magnet, cosmics Desy 5T magnet, cosmics, laser Cern test-beam (not shown) Kek 1.2T, 4GeV hadr.test-beam Desy 1T, 6GeV e- test-beam 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Pixel TPC Development Nikhef on CMOS readout techniques, joined by Saclay ~ 50 x 50 μm^2 CMOS pixel matrix + Micromegas or Gem ~ preamp, discr, thr.daq, 14-bit ctr, time-stamp logic / pixel ~ huge granularity(digital TPC), diffusion limited, sensitive to indiv. clusters for right gas ~ 1st tests with Micromegas + MediPix2 chip  more later… 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

TPC R&D Summary Now 4 years of MPGD experience gathered Gas properties rather well understood “Diffusion-limited” resolution being understood Resistive foil charge-spreading demonstrated CMOS RO demonstrated Design work starting for the Large Prototype 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

The Eudet infrastructure gives us a starting basis for the LP work Phase 2 Basic Idea: LP should be a prototype for the LC TPC design and test as many of the issues as possible (like, e.g., TPC90 @ Aleph) The Eudet infrastructure gives us a starting basis for the LP work There other LC TPC R&D issues in addition to the LP R&D which will be planned in conjunction with it 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

I3 Proposal  “Integrated Infrastructure Initiative” 7 M € from EU over 4 years approved to provide infrastructure for detector R&D  Kickoff meeting in Feb 06 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

This is for infrastructure for detector R&D, but not yet the R&D itself, to which all of the TPC R&D groups will have to contribute if the LP is going to be successful. The idea is that this will provide a basis for the LC TPC groups to help get funding for the LP and other LC TPC work. 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC 0) Workpackage: TPC R&D programme A job for LC TPC collaboration to define 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC 1) Workpackage MECHANICS Groups expressing interest to date(others?) a) LP design (incl. endplate structure) Cornell, Desy, IPNOrsay, MPI, +contribution from Eudet b) Fieldcage, laser, gas Aachen, Desy, St.Petersburg, +contribution from Eudet c) GEM panels for endplate Aachen, Carleton, Cornell, Desy/HH, Karlsruhe, Kek/XCDC, Novosibirsk, Victoria d) Micromegas panels for endplate Carleton, Cornell, Kek/XCDC, Saclay/Orsay e) Pixel panels for endplate Cern,Freiburg,Nikhef,Saclay,Kek/XCDC, +contribution from Eudet f) Resistive foil for endplate Carleton, Kek/XCDC, Saclay/Orsay convener in white color Ron Settles Dan Peterson Ties Behnke Akira Sugiyama Paul Colas Jan Timmermans Madhu Dixit 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC 2) Workpackage ELECTRONICS Groups expressing interest to date(others?) a)"Standard" RO/DAQ for LP: Aachen, Desy/HH, Cern, Lund, Rostock, Montreal, Tsinghua, +contribution from Eudet b) CMOS RO electronics: Freiburg, Cern, Nikhef, Saclay, +contribution from Eudet c) Electr.,powerswitching,cooling Aachen, Desy/HH, Cern, Lund, for LC TPC: Rostock, Montreal, St.Petersburg, Tsinghua, +contribution from Eudet Leif Joennson Leif Joennson + ? Harry van der Graaf Luciano Musa 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC 3) Workpackage SOFTWARE Groups expressing interest to date(others?) a) LP SW+simul./reconstr.framework: Desy/HH,Cern,Freiburg, Carleton, Victoria, +contribution from Eudet b) TPC simulation, backgrounds Aachen, Carleton, Cornell, Desy/HH, Kek/XCDC, St.Petersburg,Victoria c) Full detector simulation Desy/HH, Kek/XCDC, LBNL Peter Wienemann Peter Wienemann Stefan Roth Keisuke Fujii 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC 4) Workpackage CALIBRATION Groups expressing interest to date(others?) a) Fieldmap Cern, +contribution from Eudet b) Alignment Kek/XCDC c) Distortion correction Victoria d) Rad.hardness of material St.Petersburg e) Gas/HV/Infrastructure Desy, Victoria, +contribution from Eudet Dean Karlen Lucie Linssen Takeshi Matsuda Dean Karlen Anatoliy Krivchitch Desy Postdoc 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Work Packages for the LP and related work on the LC TPC – convener candidates Overall composition of conveners ~ 50:50 between ExtraEudet and Eudet affiliation 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

What are the TPC design issues that have to be kept in mind when laying out the LP? These are summarized in the TPC central-tracker DOD (‘Detector Outline Document’) for the LDC and GLD, submitted to the WWSOC at LCWS06 in Bangalore 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC-TPC Motivation/Goals …to be tested@the LP where possible… continuous 3-D tracking, easy pattern recognition throughout large volume, well suited for large magnetic field ~98-99% tracking efficiency in presence of backgrounds time stamping to 2 ns together with inner silicon layer minimum of X_0 inside Ecal (<3% barrel, <30% endcaps) σ_pt ~ 100μm (rφ) and ~ 500μm (rz) @ 3or4T for right gas if diffusion limited 2-track resolution <2mm (rφ) and <5-10mm (rz) dE/dx resolution <5% -> e/pi separation, for example easily maintainable if designed properly, in case of beam accidents, for example design for full precision/efficiency at 30 x estimated backgrounds 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Two other LC-TPC features will be compensated by good design… ~ 50 μs drift time integrates over 150 BX  design for very large granularity: ~ 2 – 20 x 109 voxels (two orders of magnitude more if CMOS pixel version) ~ end caps with large density of electronics (several million pads) are a fair amount of material  design for smallest amount: ~ 30%X0 or less is feasible design for full precision/efficiency at 30 x estimated backgrounds 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Excerpts from DODs for GLD and LDC used here as examples DESIGN ISSUES for the LC TPC Performance Endplate Electronics Chamber gas Fieldcage Effect of non-uniform field Calibration and alignment Backgrounds and robustness 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Resolution expected/needed 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Endcaps 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Arrangements of detectors on the active area of the end cap (2/2) Trapezoidal shapes assembled in iris shape Annotations: Px is the type number of PADS boards or frames 12 sectors (30° each) as super modules are defined On each, 7 modules are fixed The sizes of detectors are varying from 180 to 420 mm P2 P3 P4 P1 P2 P3 P4 By rotation of 15° around the axe, these frames are the same These arrangement seems to be the best as only 4 different PADS are necessary 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning Page 2

Principle for a Super Module equipped with detector 1 Carbon wheel with frames 20x100 mm Detector 1 made of 8 mm of epoxy or sandwich Frame of the super module made of 10 mm epoxy reinforced with 15x40 mm carbon bar Deformation limit acceptability to define Here is 20 µm / mbar of pressure Complete wheel with 12 super modules 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning Page 3

Principle for the 4 types of Pads plane Pads plane type 2 Pads plane type 1 Pads plane type 3 Pads plane type 4 2 pads rows deleted due to the dead zone Pads 6 x 2 mm 515000 pads on 12 super modules approx. (correspond to one end plate) Shape of the connectors 0.8 mm pitch 100 channels each (85x6) Questions: Do we let 5 mm of dead area on the detector, because then the pads plane is more reduced ? Are the pads aligned ? From where ? How is managed the radius parameter ? Connectors density is a crucial point as it drills a lot the detector (and also perimeter problem showed in next slide) 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning Page 4

LC TPC Electronics 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Chamber gas (a) gas choice 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Chamber gas (b) Ion buildup 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Chamber gas (c) ion backdrift/gating 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Fieldcage 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Non-uniform fields 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Calibration/alignment 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

LC TPC Backgrounds 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

TPC milestones 2006 Continue LC-TPC R&D via small-prototype tests, organize work for Large Prototype 2007-2009 Test Large Prototype, decide technology 2010 Final design of LC TPC 2014 Four years construction 2015 Commission/Install TPC in LC Detector 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

No conclusion, work continuing… 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Backup slides… 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Performance/Simulation Momentum precision needed for overall tracking? Momentum precision needed for the TPC? Arguments for dE/dx, Vº detection Requirements for 2-track resolution (in rφ and z)? track-gamma separation (in rφ and z)? Tolerance on the maximum endplate thickness? Tracking configuration Calorimeter diameter TPC Other tracking detectors TPC outer diameter TPC inner diameter TPC length Required B-mapping accuracy in case of non-uniform B-field? 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Design Gas-Amplification technology  input from R&D projects Chamber gas candidates: crucial decision! Electronics design: LP WP Zeroth-order “conventional-RO” design Is there an optimum pad size for momentum, dE/dx resolution and electronics packaging? Silicon RO: proof-of-principle Endplate design LP WP Mechanics Minimize thickness Cooling Field cage design LP WP 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning

Backgrounds/alignment/distortion-correction Revisit expected backgrounds -> DOD Maximum positive-ion buildup tolerable? -> DOD Maximum occupancy tolerable? Effect of positive-ion backdrift: gating plane? Tools for correcting space charge in presence of bad backgrounds? -> DOD (from Snowmass study) 09/11/2018 Ron Settles MPI-Munich/DESY LC TPC Design Issues & Large Prototype Planning