Tracker Outer Barrel Silicon

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Stephanie Majewski Stanford University
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
CMS TRACKER STATUS REPORT Dimitri PandoulasCMS Week
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
Status of Stripixel Sensor + SVX4 Test Junji Tojo RIKEN VTX Meeting June 1 st, 2004.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Si Sensors for Additional Tracker
SVT – SuperB Workshop – Annecy March 2010
Detector building Notes of our discussion
 Silicon Vertex Detector Upgrade for the Belle II Experiment
FCAL R&D towards a prototype of very compact calorimeter
Technical Design for the Mu3e Detector
Milano Activities: an update Mauro Citterio On behalf of INFN Milano
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Adapting the via last Design
TK Upgrade report.
Work packages status in Torino and perspectives
FNAL Production Experience
Update of US Testing Status
UCSB Short-term Testing Plan
Results from module testing
Recent TOB Developments
UCSB Short-term Testing Plan
The CMS Tracking Readout and Front End Driver Testing
Recent TOB Developments
Recent TOB Developments
Setup for testing LHCb Inner Tracker Modules
SVT – SuperB Workshop – Frascati Sept. 2010
Presentation transcript:

Tracker Outer Barrel Silicon Slawek Tkaczyk Fermilab US CMS Silicon Tracker Project

Module Components Pins Front-End Hybrid Kapton cable Pitch Adapter Kapton-bias circuit Carbon Fiber Frame Silicon Sensors

Rods 1.2 m

Tracker Readout System

APV History Pre-history 1.2µm Harris AVLSIRA radiation hard CMOS 1991… RD20 & deconvolution principle 1.2µm Harris AVLSIRA radiation hard CMOS 1993 - APV3 - 32 channel pipeline chip implementing CR-RC shaping and 3-weight deconvolution signal processing 1995 - APV5 - 128 channels with addition of analogue multiplexer 1996 - APV6 - 128 channels with analogue multiplexer, bias generator, calibration control, and I2C interface. Full CMS read-out functionality. 1998 - Development of APV6 into MSGC read-out chip, APVM 0.8µm DMILL radiation hard CMOS 1997-99 - APVD - development of DMILL versions 0.25µm CMOS 1998-2000 - development of APV25 deconvolution 1992 CMS LoI 1994 CMS TP 1998 CMS Tracker TDR 1999 CMS all-silicon Tracker

Critical Path Items The Si-Tracker group is presently evaluating a recently discovered feature of the APV25. The ‘feature’ manifests itself in two related ways - see the next few slides. It is very unlikely that the APV25 will be re-designed at this point. A test beam study in mid-May should hopefully resolve the remaining concerns-data analysis in progress. These higher order concerns should in no way detract from the otherwise superb performance of the APVs. Four chip TOB hybrid Four chip TOB hybrid

HIPs and Pinholes HIPs Pinholes Highly Ionizing Particle (1000X minimum ionizing) resulting from nuclear interactions in the silicon. These are rare events. 3.9 x 10-4 per 500m layer per incident pion. Rates confirmed in the recent exposure in the PSI test beam HIPs lead to large signals on a few strips. This can saturate (disable) the entire APV (128 channels) for ~200 ns. Pinholes Detector strips are capacitively coupled to the APV. The capacitors can occasionally be shorted (pinhole). Leads to a DC current into the APV. If enough pinholes are present the APV will be permanently disabled (until the pinholes are removed).

MSGC Legacy

Bias Circuit Vc will exceed 0.8 V in old (irradiated) detectors with large leakage current.

Number of Pinholes Rinv 100 W Rinv 50 W APV inverter off Signal suffers if more than 2 pinholes Signal suffers if more than 4 pinholes Signal OK for more than 7 pinholes (but reduced dynamic range)

APV Concerns in Perspective Both HIP events and pinholes (after installation) are very rare. CDF and D0 Run IIa: “A few pinholes”. Both problems can be mitigated by changing Rinv from 100 to 50 ohms. In cases where there are more than 4 pinholes per APV the inverter can be turned off (with loss of dynamic range). It may be possible to avoid the pinhole effect by applying a small voltage to the bias ‘ground’. The test beam activity at PSI in 15-21 May 02 confirms the understanding of the HIP effect.

FE hybrid status Industrial hybrid (V0 – unpackaged chips on thick film ceramics) production started with two producers. Over 160 hybrids delivered by one vendor (yield 65%). A lot of little problems in manufacturing or final assembly (“the feature size” is too small for mass production; difficult cable attachment). The 2nd producer had problems with shorts – a handful delivered. (V1) Design of this version of the hybrid (packaged chips on ceramic) is done. Order will go to 1st producer after delivery of the 160(x0.65) hybrids (V2) 40 hybrids of this type (packaged chips on FR4) were received in Strasbourg. 10 have been populated and they look okay. Robust media but needs to be evaluated –e.g. thermal issues

Hybrid- New Technology Decision New Candidate Technology: monolithic FR4 (kapton cable is part of the hybrid) At the next CMS Week in June ’02 the technology will be chosen Issues to be addressed by June are: Mounting scheme: should hybrid be glued on a rigid substrate (CF or graphite) before adding pitch adapter; Radiation hardness; Electrical performance; Thermal performances; Price;

Hybrid- Delivery Schedule Decision expected in June’02 10-20 FR4 prototypes being done It takes 6 months from the decision ‘till deliveries of first production FR4 hybrids (bidding, order placement, fabrication, etc.) First hybrid from production order expected in Jan’03 A short order (~1000) will be placed after positive decision resulting in hybrids delivered in October ’02.

Status of Component Orders Sensors: Contracts signed Frames: Tender finished Pitch Adapters: Market Survey (MS) done, Small orders done/prepared APV25 Chips: small fraction available Other ASICS (PLL, MUX, DCU): being packaged FE Hybrids: Technology decision imminent…. Optoelectronics: Tenders (4) finished and LOI sent for some contracts

Module Testing at SiDet ARCS (2/7) CMS DAQ (3/4) Two PC-based test systems are now in operation at SiDet. The DAQ system represents a pre-prototype version of the final system.

Rod Testing Plan is to perform module burn-in once rods are assembled We are studying use of commercial chest freezers and commercial chillers for the burn-in facility We’re in discussion with CERN physicists and engineers to specify the thermal-cycling tests to be done during burn-in. This will drive the design of the cooling and controls. We hope to prototype much of the system this summer/fall.

Conclusions The U.S. CMS Si-Tracker effort is part of a larger effort to build the CMS Tracker system. Our project relies on timely deliveries of quality components from European collaborators and assemble these into modules and rods. Viability of the final APV25 + hybrid designs are being finalized. The first news from the Test Beam look promising. The current schedule has us starting production in early 2003.