Defense Acquisition University

Slides:



Advertisements
Similar presentations
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

DOCUMENTATION COMMITTEE I.INTRODUCTORY PAGE A. NAME AND ADDRESS OF BUSINESS (include LOGO and Tagline) B. NAME(S) AND ADDRESS(ES) OF PRINCIPALS webpage.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
SESSION-2 Business Plan Development
The Business Plan.
Defense Contractor Financial Management presented to EPMC by Dr. Tony Perino.
Chapter 3 - Product Design & Process Selection
The Business Plan : Creating and Starting The Venture.
XII- COST CONTROL, MONITORING & ACCOUNTING
The Business Plan: Creating & Starting the Venture
The Business Plan : Creating and Starting The Venture
Supplier Selection & Evaluation
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Government Furnished Equipment (GFE) Overview
FAR PART 45 – Government Property
Business Plan Advanced Business Technology. Part I – Cover Page Your Name Business Name Company Logo Address Telephone Number Fax Number Address.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Logistics and supply chain strategy planning
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Creating and Starting the Venture
BZUPAGES.COM. Presentation Chapter#7 The Business plan: Creating & Starting the Venture Presented to: Sir Ghulam Abbas.
ENTREPRENEURSHIP Chapter # 07 The Business Plan: Creating and Starting the Venture.
The Business Plan- Creating and Starting the Business
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 6 Need Identification and Specification.
The Business Plan: Creating and Starting the Venture
© 2003 McGraw-Hill Companies, Inc., McGraw-Hill/Irwin INTEGRATING SUPPLY CHAIN AND LOGISTICS MANAGEMENT 16 C HAPTER.
MKT 201 – Stockmyer Chapter 1 PowerPoint Slides (most pictures deleted)
SOURCING.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
GFP Attachment Fields Mandatory/Optional Updated 11 Jan 2016.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
Engineering Economic Analysis CHAPTER 1 1. What is Engineering Economy? Engineering economy involves the financial and economic evaluation of projects.
Society for Maintenance and Reliability Professionals (SMRP)
AXUG Partner Showcase – Introducing Preactor
“Should Cost” Analysis
Role of The Software Development Plan (SDP)
Business Plan Writing Instructions
MGT601 SME MANAGEMENT.
ISO/IEC
Definition of CIM “CIM is the integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled.
The Business Plan : Creating and Starting The Venture
Copyright © 2007 McGraw-Hill Ryerson Limited
Chapter 8 STRATEGIC MANAGEMENT © Prentice Hall,
Operations Management
Planning for Information System
© 2005 The McGraw-Hill Companies, Inc. All rights reserved.
The Business Plan : Creating and Starting The Venture
“Should Cost” Analysis
Managerial Accounting Concepts and Principles
Manufacturing and Service Operations
ISA 201 Intermediate Information Systems Acquisition
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
FOR VENTURE BUSINESSES
Quality Management Systems – Requirements
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Across the entire value chain
ENGINEERING ECONOMIC DECISION CHAPTER 1
The Business Plan : Creating and Starting The Venture
Relationship between MRLs and AS6500
Material Requirements Planning (MRP)
Entrepreneurship Management The Business plan Prof Bharat Nadkarni
Project Management Process Groups
INTEGRATED MATERIAL MANAGEMENT. Integrated Materials Management Definition “ Materials Management is a function responsible for -coordination of planning,
Chapter 8 STRATEGIC MANAGEMENT © Prentice Hall,
Omnibus IV Contracting Strategy Michael D’Alessandro
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Defense Acquisition University

Technical Guide to Production Readiness Reviews and Manufacturing Risk Assessment REV 17 Mod 01 UPDATED JANUARY 2005 MAJ Mark McNabb, USAF FD-TED-MM W.T. Motley, CDSC CDR F.F. Schulz, USN Ret. Defense Acquisition University Fort Belvoir, Virginia

Page

Forward 4-5

I. Introduction 6

Production Readiness and Reviews 6-7

Production Readiness Review Organization 7-8

Pre-Production Readiness Review Activities 8

Production Readiness Review Plan 8

On-site Production Readiness Review Activities 8

Production Readiness Review Definition 9

II. Common Production Risks and Concerns 9-15

III. Production Readiness Review Checklist 15

Product Design 15-16

Plant Facilities, Production Equipment, Test Equipment, and Tooling

Producibility/IPPD Practices 18-20

Cost 20

Personnel 21

Defense Priorities and Allocation System 21

Manufacturing Planning and Scheduling 21-23

Production Control 24-25

Manufacturing Management 25-26

Work Instructions 26-27

Material 27-28

Tooling/Test Equipment 28-29

Work Measurement 29

Schedule Performance 29-30

Vendor Delivery 30-31

Scrap, Rework, and Repair (SRR) 31-32

Industrial Engineering 32-33

Manpower/Training/Labor Relations 33-34

Quality Assurance 34-35

Supplier Quality Assurance 36

Metrology/Variation Reduction 37

Software Issues 37-38

Non-Conforming Materials 39

Manufacturing Processes and Control 39-40

Manufacturing Stress Screening 40

Subcontractor Management and Selection 40-41

AA. Manufacturing Technology 41

BB. Low Rate Initial Production (LRIP) 42

CC. Modeling and Simulation 42-43

DD. Product Data Management (PDM) 43

IV. References 44-45

V. Appendix A (GAO/NSIAD-85-34) 47-52

VI. Appendix B (Excerpts from DoD 5000.2R) 53-62

VII. Appendix C (Generic Production Plan) 63-64

VIII. Appendix D Deleted

IX. Appendix E (Diminishing Manufacturing Sources/Material Shortages)

IXX. Appendix F (Government Instructions for Archival Material Purposes) 73-82

{Note: Figure 1 describes the strategic, proactive role that manufacturing should play in both the contractor’s and the Program Managers Office’s business and technical strategies.}

E. On-site Production Readiness Review Activities

disassemble and reassemble an item that was never intended to be readily disassembled; the item may not have an adequate technical description due to age, and “reverse engineering and manufacturing” may be needed; or the item’s life cycle is already well past its intended length, and no ready replacements or substitutes are available. This is also a sustainment issue.

that force products to be made in unique, therefore expensive, manufacturing facilities. Instead, the intent has been to obtain as many products as feasible from companies that can produce them using “5 Ms” resources that are identical (or are similar in most aspects) to those resources used for their commercial customers. This is the essence of “civil-military integration.” The assumption is seductively simple: because the overhead costs associated with developing and producing the products will also be spread among the much larger commercial and consumer customer bases, that this combined with competition will keep the prices of such products much lower, and the quality and delivery schedules acceptable. Some of the major risks with this approach include: obtaining priority for military orders, when defense is only a small, “low dollar value” segment of the customer base; the commercial companies often do not create products that can meet “worldwide, short notice” performance, for extended periods of extreme operations; the commercial producers want to sell their “latest” product, and so do not always want to sustain their “old” product (or readily provide DoD customers the knowledge or ability to sustain it) over the long life cycles often faced for DoD systems; the commercial companies do not usually wish to allow detailed knowledge of their operations, and there are often physical and functional incompatibilities between commercial systems made by competing companies.

Single Process Initiative: The Single Process Initiative is a block change to management and manufacturing requirements of existing contracts on a facility-wide basis, to unify management and manufacturing requirements within a facility, wherever such changes are technically acceptable to the government. It allows the replacement of multiple government-unique management and manufacturing systems with common facility-wide systems in order to, in the long run, reduce the costs to both DoD contractors and the DoD.

A. Product Design

1. Areas of Concern

1. Areas of Concern

1. Areas of Concern

H. Production Control

1. Areas of Concern

2. Metrics

Work Instructions completed on schedule. High-levels of raw materials, finished product and work-in- progress indicate a “just-in-case” inventory system. Excess inventory may be concealing problems in the manufacturing process. Material costs now greatly exceed direct labor cost, and should be evaluated accordingly.