First Article Inspection (Per AS9102)

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

SUBMITTALS PROCESSING Fall 2008 ARCH 330
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
Premier Supplier of Energetic Mission Critical Solutions FORM 2716-A 01/12 Supplier PO Review Training.
First Article Inspection Report
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
HACCP Manager Software™
Quality Assurance System
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
First Article Inspection 9102 Carl ZimmermanSept,2013.
First Article Inspection
Sole Source Training.
1 Inspection and Testing Approved for Public Release.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
From Research Prototype to Production
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Training Module 5: Budget Modifications Connecticut Advanced Manufacturing Initiative (CAMI) October 12, 2015 Meg Niewinski, Finance Officer Meg Niewinski.
MyFloridaMarketPlace MFMP WebEx Training: Module V How to Reconcile an IR(Exception Handler) Toll free number: (888) Conference Code: #
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
External Provider Control
Production Part Approval Process
SCC P2P – Collaboration Made Easy Contract Management training
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Submitting an invoice with the Tungsten Portal
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Invoice Verification Workflow
Leveraging Features and Functionality in PeopleSoft 9
Supplier Portal Self-Registration
Supplier Profile Key Data
MyFloridaMarketPlace
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
<NPI/Engineering Change/Phase Out>
Introduction to New Product Development (Documentation)
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
First Article Inspection
DSQR Training Supplier Quality Manual
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
Texas Instruments Supplier Portal- Web Invoice Overview
First Article Inspection Report (FAIR) Training
Inspection and Testing
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SUPPLIER PARTNERSHIP 2.
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Business Office Manager Training The ACH Process in 7 Steps
SQA01 Guidance Material: FAI Review
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
SQA01 Supplier Guidance Material: Permission to Ship Forms
First Article Inspection
Production Part Approval Process
DPAR Training Material Nordin Mimouni – Supplier Quality Manager Rev
Guide for successful completion of First Article Inspection Reports
Chapter # 5 Supporting Quality Devices
Guide for successful completion of First Article Inspection Reports
Company X Process Mapping Training
Change Highlights January 2013
First Article Inspection (Per AS9102)
Scheme for Growth Pilot
Partner Portal Training document
Supplier EDI On-boarding Overview
Presentation transcript:

First Article Inspection (Per AS9102) Supplier Training and Review

Why is this training necessary? Pole/Zero requires a first article (in compliance with AS9102) for all custom parts purchased to a Pole/Zero drawing. Missing, incomplete or incorrect first article reports continue to be the #1 reason for rejection of product at receipt. Added costs and delays are associated with these rejections. Suppliers quality ratings ARE being negatively impacted by these rejections which may lead to reduced orders or ultimately a change in the supplier’s approval status.

When is an FAI required? http://standards.sae.org/as9102b/ Full FAI New part introduction New supplier or new location of manufacture Lapse in production for more than 2 years When required by the purchase order Partial (Delta) FAI Design change Significant change in the method of manufacture (e.g. Tooling, Processes, Machine, Location, Numerical Control Program, Sequence of Manufacture). http://standards.sae.org/as9102b/

How is this requirement communicated? Confirm purchase order provisions attached to your order. “G7” indicates a first article is required. If your production has lapsed 2+ years or your last production run was the previous revision and an FAI may be needed but not noted on the order please contact the buyer for confirmation

Purchase Order Flow Downs http://www.dovermpg.com/polezero/english/globalnavigation/suppo rt/supply-management Supplier Policy Manual Procurement Provisions Pole/Zero’s work instruction for First Article Inspection of Purchased Parts

What documentation is required? Verification of all design characteristics, this includes every requirement from the drawing including any notes. Drawings with greater than 10 reportable dimensions require a “ballooned/bubbled” drawing. All material and special process certifications (example: aluminum certifications, anodize certifications, COC’s of commercial items used within the assembly). A first article inspection report for any subassemblies (lower level items controlled by a PZ drawing). The use of AS9102 forms is not a requirement but HIGHLY recommended. Forms available for download at: http://www.sae.org/iaqg/forms/index.htm

AS9102 FORMS AS9102 Form 1: Part Number Accountability shall be used to identify the part that is being first article inspected (FAI part) and associated sub-assemblies or detail parts. AS9102 Form 2: Product Accountability – Raw Material, Specifications and Special Process(s), Test Verification shall be used if any material, special processes or functional testing are defined as a design requirement. AS9102 Form 3: Characteristic Accountability, Verification and Compatibility Evaluation shall be used to record an actual measurement or inspection/verification of the FAI part for every design characteristic on the drawing, including notes.

AS9102 Field Categories (R) - Required: This is mandatory information. NOTE: These fields are depicted in bold font. • (CR) Conditionally Require - This field shall be completed when applicable to the product (e.g., serial number shall be entered when there is a serial number) or when required by the customer. NOTE: These fields are depicted in bold italic font. • (O) Optional - This field is provided for convenience; the field may be left blank. NOTE: These fields are depicted in standard font. Pole/Zero requires fields noted as (CR) to be completed by the supplier when applicable information exists, hence these fields are now a requirement and NOT optional.

DPD Requirements Suppliers of custom machined/mechanical components need to be familiar with the additional requirements of DPM (Digital Product Definition). When design requirements are provided by Pole/Zero using DPD and a traditional 2D drawing is not available for all requirements, the supplier shall extract, verify, and provide results of these characteristics on the FAIR as required in AS9102. The supplier shall provide a report/drawing that is “ballooned/bubbled” for the DPD requirements. The supplier shall implement a system to control the configuration of the DPD file provided by Pole/Zero as well as their related CMM (Coordinate Measuring Machine) and CNC (Computer Numerical Control) programs. Refer to AS9102(B) for additional information.

What items do not need a FAI? Standard Parts If supplier can provide evidence (CofC) that part has been qualified to procurement specification such as MS, NAS etc. Electronic Components If parts being supplied have been manufactured by a supplier listed on Qualified Products List (QPL) for that part Non Custom parts Commercial Off The Shelf (COTS) Items

Expectations from the Suppliers Include all FAI documentation necessary (Inspection forms (signed), material and process certifications, ballooned drawings) with the part at the time of delivery to Pole/Zero. The part used for the first article inspection must be identified. If you are delivering more than 1 piece the FAI part needs to be notated in some manner (tagged, labeled, etc.)

Pole/Zero Sourcing Team MOVING FORWARD Pole/Zero’s preference is to complete the FAI review process on the smallest quantity possible. When requested the purchase order will have a separate line for the first article quantity with an earlier due date than the rest of the lot. Thank you in advance for your assistance improving this process. If you have any questions, suggestions or comments please let us know. Pole/Zero Sourcing Team Toby Stecher – Supplier Quality Manager – tstecher@polezero.com Jay Hoff – Materials Manager – jhoff@polezero.com Tony Owens – Buyer – Towens@polezero.com Scott Puterbaugh – Buyer – sputerbaugh@polezero.com Kristine Hull – Buyer – khull@polezero.com