Presentation by: Paul Kemp-Russell.

Slides:



Advertisements
Similar presentations
Introduction to(GMAW) Gas Metal Arc Welding
Advertisements

Manufacturing Processes Lab I MET 1321 Stick Welding
HVAC523 Soldering.
Pipe Cutting System The evolution of Patented products Designed in Finland pipe cutting.
MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
Arc Welding Equipment
Arc Welding. Objectives Apply your welding knowledge to construct a butt weld in a group activity with 75% accuracy. Demonstrate how to properly weld.
An Aerospace Manufacturing Perspective Introduction to Fastener Technology Part 2 1.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Gas Metal Arc Welding: An Introduction
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
Microelectronics Clean Room Electrical and Computer Engineering Orbital Tube Welder by Clayton Gatewood.
Cooling connections in the service gap Richard French The University of Sheffield.
WP4 cooling update RAL 6 th Oct Welding – high repeatability statistics Bending – 2.275mm OD trials in Titanium with comparison of 1.8” OD bend.
AIR BEARING SYSTEM.
1 HVACR316 - Piping Soldering. 2 Soldering Copper Tubing The most common method of joining copper tubing in hydronic heating systems is soft soldering.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
Metal – Processing Welding.
1 ATLAS Upgrade WP4 Face to Face meeting Liverpool June 2012 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson, John Mattheson,
1 ATLAS Upgrade WP4 Face to Face meeting at Edinburgh - 11 th Jan 2011 WP4 task 2: Cooling activities Richard French – The University of Sheffield.
An Aerospace Manufacturing Perspective Introduction to Fastener Technology Part 2 1.
Grade 11 Welding Simulation Lesson
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Electrochemical Machining (ECM)
Cooling loops for prototype staves Update on cooling pipes progress Confirmation of design of loop Discussion on design developments of loops for future.
WP4 Equipment Bids (Tim). Bids ATLAS – Case for the Purchase of Equipment for the Testing of Cooling Loops (£15k) – Case for the Purchase of Equipment.
1 QMUL Face to Face Meeting 2/2/2012 Richard French, Paul Kemp-Russell, Hector Marin-Reyes (Sheffield) John Matheson, Martin Gibson, Ian Wilmut (RAL) Ian.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Plasma Arc Cutting Background of Plasma Arc Process  In 1941 the U.S. defense industry was looking for a way to join light metals, from this.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
1 Full document available on EDMS Metallurgical qualification of AISI 316L TIG welded tubes Summery - Richard French.
Resistance Welding Resistance Welding is a pressure welding technique using high current and low voltage The current passing through the two overlapping.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
WP4 Face to Face #6, Oxford 14 th July 2011 Welding summary Richard French – The University of Sheffield.
AGRICULTURAL MECHANICS I UNIT I:METAL SKILLS COMPETENCY:AM26.00 Research arc welding equipment. OBJECTIVE:AM26.01 Compare types of arc welding machines,
What is Welding? As Identified by the American Welding Society, a weld is a formed when separate pieces of material are Fused together through the application.
TIG Welding Introduction
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Unit 215 – Welding by TIG Process
Unit 215 – Welding by TIG Process
1 ATLAS Upgrade WP4 Face to Face meeting Sheffield 25 th August 2011 Richard French – The University of Sheffield Ian Mercer – Lancaster, Martin Gibson,
Local cooling LAPP – Annecy /IN2P3
Plasma ARC Welding (PAW)
Magnetic Impelled Arc Butt Welding
UK Knowledge of Pipe Bending and Pressure Testing Martin Gibson (RAL) Pipe bending by Ian Lancaster University Connector welding by.
Service channels between Tracker and PP1
Filter drilling status
MICRO PLASMA WELDING AT ARCRAFT PLASMA
Ti/SS transitions A.Basti INFN-PISA*
Service channels between Tracker and PP1
Major challenges in TIG welding of titanium
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Aplication GTAW (Gas Tungsten Arc Welding) for Plate
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Opti-Purge® FAST INFLATION PURGE SYSTEM
Cooling loops for prototype Staves
update on UT cooling system
Gas Tungsten Arc Welding (GTAW) (TIG)
Basic equipment setup and welding procedures
[ Hot wire - narrow gap welding ]
Practical Metalworking
In Agriculture Systems 1
The evolution of pipe cutting Patented products Designed in Finland Pipe Cutting System.
Presentation transcript:

Pipe joining meeting @ Cern Welding techniques electrical breaks and sleeve joints 18/05/2018 Presentation by: Paul Kemp-Russell. Contributions from: Richard French, Sam Edwards, hector marin-reyes, Sheffield FreD Gannaway, QMUL

history: Component development at Sheffield. Previous concept to date… 1.Create & produce robust and accurate on bench tooling with supporting jigs. 2.Use a “one hit” accurate and clean cutting process for Stave tube loops. 3.Two piece construction of stave tube loops and electrical break/wiggle. 4.Use, then removal of temporary bought in VCR fittings. 5.Different design components for stave and forward pixel cooling.

Problems arising from butt welded pipe jointing Need for near perfect end of tube finish and alignment , best performed on bench jig Joints doubly difficult if particular angular alignment necessary. Difficulty in maintaining internal gas pressure (critical in process) pre-set in WPS. Increased risk of blown joints on thinner walled tube On-site welds and repairs very difficult, IE. removal of vcr fitting at install subsequent reworking of pipe ends.

Proposed design improvements: TUBE JOINTING UTILISING SLEEVE JOINT OVER BUTT WELD. ADVANTAGES: EASE AND RELIABILITY OF WELD PROCEDURE DUE TO ABILITY TO IMPROVE ALIGNMENT. REMOVES NEED FOR ABSOLUTE PRECISION TUBE PREPARATION. (qualify) STABILISATION OF THE INTERNAL PURGE GAS FLOW. NEW DESIGN TO INCORPORATE A TEMPORARY REMOVABLE PRESSURE TEST FITING “FRED”. CAN BE ULITILISED ONSITE AT INSTALL . COULD BE A SOLUTION FOR REPAIR TO DAMAGED TUBING. TRANSFERABLE FITTINGS ACROSS STAVE AND PIXEL . RELATIVELY CHEAP, EASILY MACHINED COMPONENTS. (QUOTATION: 100-OFF @ £10 EA, 1000-OFF @ £4.50 EA) 9. MUCH INCREASED SUCCESS RATE !! (AS TESTING INDICATES) DISSADVANTAGES: 1. SLIGHT INCREASE OF TITANIUM METAL MASS TO STAVE/PIXEL TUBING. (@~Z+1.4M) EARLY STAGES OF FULL VALIDATION, TO DO LIST: Metallurgical testing Pressure testing Repeatability testing (yield) with high stats. 3. REQUIRES MACHINING TIME FOR PROTOTYPES. (EST LEAD TIMES APPROX 4-5 WEEKS FROM ORDER)

SLEEVE JOINT DESIGN AND INTERGRATION. SLEEVE FITTING WITH O’RING GROOVE FOR TESTING AND POSITIONING. OBTAINING QUOTATION NOW WITH A VIEW TO MANUFACTURE 150 OFF OF THESE ITEMS FROM “CERAMIC SEALS“ UK MANUFACTURER (EXP APPROX £10 EA.) SHOWING FORWARD PIXEL CLOSE OUT, U-BEND WITH AN E-B AND SLEEVE FITTING.

NEW SLEEVE WELD JOINT PROGRESS SO FAR. Overall dimensions of 14mm Long and 3.2 mm diameter with an o”ring groove machined in. This would allow use as a test fitting and a possible location point to reference the tip of the electrode for the welding process. Welded area shown here. Blank sleeve O”ring groove to accept 2.60mm bore x 1.4mm c/s o”ring.

EXAMPLE CUT THROUGH SLEEVE WELD SAMPLE ON SMARTSCOPE EXAMPLE CUT THROUGH SLEEVE WELD SAMPLE ON SMARTSCOPE. PICTURES COURTESTY OF SAM EDWARDS IN SHEFFIELD TAKEN ON “OGP SMARTSCOPE CNC FLASH 200” AT 40X ZOOM. SLEEVE WELD JOINT AREA SHOWING NO FISSURES AND CONSISTANT GRAIN STRUCTURE. CROSS SECTION THROUGH 2.50MM X 0.178MM WALL TUBE AND SLEEVE FITING AT WELDED JOINT AREA

PROPOSED NEW ELETRICAL BREAK: INCORPORATING TEMPORARY TEST FITTING. ADVANTAGES: DISSADVANTAGES: 1. MULTI-FACETED COMPONENT , IE. WELD FITTING , EB , AND TEST FITTING IN ONE. 2. POTENTIAL REMOVAL OF TWO WELD JOINTS INSIDE STAVE CORE AREA. 3. MASSIVE REDUCTION IN SIZE OF COMPONENT. (COST IMPLICATION.) 4. USE OF THE PREVIOUS PROVEN CERAMIC TECHNOLOGY. 5. USE IN BOTH STAVE AND FORWARD PIXEL.(NB. COULD BE SIMILAR BUT SUBTILY DIFFERENT) 6. DESIGN COULD PROVIDE ADDITIONAL STABILTIY TO END OF STAVE AREA (IF NECESSARY.) 7. ALSO USED AS A TRANSITIONAL JOINT FROM ONE TUBE DIAMETER TO ANOTHER. 1. NO SIGNIFICANT PROBLEMS FORSEEN. 2. TESTS AND METROLOGY NOT YET UNDERWAY. 3. WILL HAVE TO FOLLOW DEVELOPMENT CYCLE AS PREVIOUS FITTIINGS TO ENSURE ROBUSTNESS. 4. DEVELOPMENT TIME ?

ELECTRICAL BREAK PROPOSALS…… CURRENT ELECTRICAL BREAK PROPOSED BY SHEFFIELD & QMUL. (TEMPORARLY ON HOLD, DUE TO POSSIBLE PIPE DIAMETER CHANGES…) ALTERNATIVE EB SOLUTION FEATURING A LARGER CERAMIC SUITABLE (ELECTRICAL ISOLATING) AT STAVE END CLOSE OUT AREA.

TEMPORARY OR “FRED” FITTING TEST PORTION WITH STANDARD CONNECTION TO PRESSURE OR LEAK TESTING UNIT. BLANK “FRED” FITTING. UTILISING THE O’RING GROOVE ON BOTH THE SLEEVE AND EB’s. PROTOTYPES HAVE BEEN PRODUCED BY QMUL IN BRASS AND NOW STAINLESS STEEL. HAVE ACHIEVED PRESSURE TESTING VALUES OVER 200 BAR (WATER) AT RAL. THEY NEED FURTHER QUALIFICATION IE. HELIUM LEAK CHECKING ETC. THESE ARE TEMPORARY TEST FITTINGS ONLY !!…. THE WELD SLEEVE IS THEN USED ONCE REMOVED.

WELDING MACHINES AND TECHNIQUES USED AND DEVELOPED AT SHEFFIELD. VBC IP50 : CUSTOM MADE SWAGELOK M200

TIG Orbital welding of CP2 Ti SWAGELOK M200 Orbital welder setup power supply PC control & Programming for weld schedule THIS COMERCIALLY AVAILBLE UNIT WAS INTIALLY USED AND WORKED WELL ON TUBE DIAMETERS DOWN TO 1/8TH “/ 3.0MM WITH WT @ 200 MICRON. BELOW THESE FIGURES HOWEVER THINGS PROVED TRICKY. THE MACHINE WAS NOT SENSITIVE ENOUGH TO COPE WITH THE LOWER CURRENTS REQUIRED.

New welding system development, REQUIRED FOR ITK. Over the past few years in conjunction with our industrial partner Sheffield has developed an fully automatic TIG welding system that produces accurate low current narrow bead welds sourced from our partners aerospace joining knowledge. It was obvious that nothing like this was commercially available. From the use of high frequency pulsing interposed within the pulsed weld current gives the system its unique characteristic and is capable of joining two razor blade edges together without distortion. The benefit of this technique is that increased arc force or penetration is achieved with a lower input current which is crucial to thin wall Ti tube welding by allowing for improved heat management on critical welds whist still attaining full penetration. Has additional grounding to previous high arc start voltages through work piece Production version fully tested in Sheffield available to ATLAS Upgrade for R&D. Capable of joining >125 um Ti using minimal power. ~0.3A, 30v on 250um CP2 Ti tube (automatic weld)

System Details Initial Current 0.1 – 60 Amps Upslope time 0.0 – 20 Seconds Downslope time 0.0 – 20 Seconds Finish Current 0.1 – 60 Amps Finish time 0.0 – 25 Seconds Pre purge gas 0.0 – 100 Seconds Post purge gas 0.0 – 100 Seconds Main Current 0.1 – 60 Amps Background Current 0.1 – 60 Amps Main time 0.01- 5 Seconds Background time 0.01- 5 Seconds InterPulse Current 0.0 – 60 Amps Time per level 0.01- 99.9 Seconds Supply 230Volts 13 Amps 50Hz 2.275mm OD tube weld cassette & head with arc start grounding

Polysude Weld head Set up of electrode distance with shim – needs refining, tooling being designed now. Additional clamp for grounding during arc start. Clamping cassette only 13mm wide allowing easy access to difficult areas. Modifications to cassette necessary for electrode positioning (use o’ring groove as a reference point)

common faults discovered during r&d into ti tube joining – TIG welding Titanium welding work has progressed: Highly repeatable in 180μm wall Ti, and going as small as 120μm wall Ti with some success. There are two main problem areas. Electrode burn-out. High arc temperature required for Ti welds is causing burn-out of Ciriated Tungsten electrodes. Changed to Thoriated electrodes that we make in house at Sheffield with the correct length and tip. These tungsten electrode contains 2% Thorium which is slightly radioactive. Processing of these electrodes should not be done without extraction. The new electrodes and allow for a cooler arc during welding. This improved weld quality without depositing tungsten into the weld. Lower power could be used and weld and HAZ reduced. Argon purge gas: Ag used is BOC Pureshield. From variable welds on thin wall tube, the transfer lines were holding moisture varying arc temp. Changing to BIP Ag from Airproducts with all 316L gas transfer lines gave immediate improvement.

CUTTING PROCESS OPTIONS CURRENTLY AVAILABLE ………… DRY ABRASIVE WHEEL CUTTING AND SWAGELOK CARBIDE TIPPED FINISHING TOOL: METHOD CURRENTLY EMPLOYED FOR MOST APPLICATIONS FOR TEST PIECES ETC, WHERE ACCURACY IS NOT IMPORTANT BUT FINISH TO TUBING IS. WIRE EDM @ SHEFFIELD: USED WHEN AN ACCURACY AND FINISH ARE EQUALLY IMPORTANT BUT LIMITED TO SHORT LENGTHS OF TUBING >500MM, AS CONSTRAINED BY THE TANK OF THE MACHINE. “SPECTROGRAPHIC” PRECISION CUTTER WITH RUBBER BONDED ABRASIVE WHEEL, CUTTING USING DEIONISED WATER AS COOLANT (AS TUBE SUPPLIERS USE): SHOULD BE ABLE TO ADAPT MACHINE WITH JIGS TO ACCOMMODATE THE STAVE LOOPS TO TRIM TO LENGTH.

THAT’S ALL FOLKS !!