Conversion of PDS Catalogs and Specifications to SmartPlant 3D

Slides:



Advertisements
Similar presentations
SolidWorks Enterprise PDM Data Loading Strategies
Advertisements

FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Understanding the Value of an Offshore Workshare Partner
Comprehensive HVAC Pipe Estimating Software package Save estimating time by 50% Simple to use and inexpensive HVAC projects on computer Current customers.
© 2012 Autodesk Structural Workflows for Autodesk ® Plant Design Suite Projects Abraham Koenig Technical Specialists Manager AEC/ENI Central Europe Alexandre.
Automation Tools For Electrical Design
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
AXSYS ®.Process Overview. AXSYS Products AXSYS.Process – Process Engineering Environment for Front End Design & Engineering, providing an integrated Process.
ATLAS Utility Management Software Users Group Meeting January 14-15, 2003.
IT/E&E Industry Dynamism in AP and Impact of ITA Japan Electronics & Information Technology Industries Association 20 th June,
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Manual with Marketing Yamagata Intech (Shanghai) Co., Ltd. © 2013 YAMAGATA INTECH SHANGHAI Co., Ltd. All rights reserved.
© 2013 Fluor. All Rights Reserved. Process Data in SmartPlant Instrumentation Fluor’s SmartPlant Implementation Initiative By: John Dressel.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
13. Report on the status of the IPC E-forum- (IPC-IEF 2012) IPC Committee of Experts 44 Geneva March 2,2012 Patrick Fiévet Heat of IT Operations and Support.
1 Microsoft Project Solution Offerings and the next chapter of EPM September 17th, 2003 Brendan Giles, PMP Systemgroup Management Services.
SEOUL, S. KOREA PYONGYANG, N. KOREA KUALA LUMPUR, MALAYSIA
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
DESIGN & DETAILED ENGINEERING CONSULTANT
Process, Power and Marine Division Integrating Tools and Work Processes SmartPlant 3D and GTSTRUDL Robert Christian Design System Business Development.
1 INDUSTRIAL ENERGY EFFICIENCY CONFERENCE ON GREEN INDUSTRY IN ASIA Robert Williams Energy Efficiency and Policy Unit United National Industrial Development.
CONVERSION OF CAD DATA TO GIS LAYERS Challenges and Techniques Compiled by: Tope Bello Summer 2005 Instructor POEC 6387 GIS Workshop Professor Ronald Briggs.
© ABB Inc. - 1 A robust portfolio of interoperable solutions Getting started with Industrial IT Certification Document# 3BSE042726, September 2005.
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Fall 2010 Software Planning Guidelines.
EQUATE PETROCHEMICAL COMPANY EQUATE RCM Project Implementation By Khalid Al-Anzi.
Automated Hanger Drawings Based on CAESAR II Results
Chapter 7 Computer-Aided Design and Drafting in Architecture.
Tools Report Engineering Node August 2007
Process engineering Quality controls.
Arkom Engineering Consultants
Creo Spec-Driven Piping
On the Development of an Equipment Data Model
eSPL Innovative Management Technology
Task 6.3 – Evaluating business models currently in use by partners
Creo Spec-Driven Piping
Hailo US Tower Equipment Manufacturer
COMPUTER INTEGRATED MANUFACTURING
Theorem CADverter for STEP AP242
JMP Yield Application Using JMP’s rich graphical capabilities, customizable JSL code, and ODBC database connectivity to build a yield analysis application.
EDC at Dana-Farber/Harvard Cancer Center: Implementing InForm to Support a Bone Marrow Transplant Program Douglas J. Buell Project Specialist Dana-Farber.
Let the IMPS program help you with your obsolescence!
Software Planning Guidelines
Systems Implementation,
Your first, second and third choice for tooling
Project Background Project Title
Fundamentals of PROCESS PLANT PIPING DESIGN
ChE 473K Plant Design R. Bruce Eldridge.
School of EE and Computer Science
Request for Proposal (RFP)
International Advisory Council
From PDS to SP3D From PDS to SP3D
Netherlands Food and Consumer Product Safety Authority (NVWA)
Upgrading to S3D Technology: Automation API
CLINICAL INFORMATION SYSTEM
Lesson 1- Operations Management
WSC Market Report Task Force Meeting
Customer Focused Testing Model - Bridging The Gap
Data harmonization in International Surveys on Education
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Presents: Rally To Java Conversion Suite
Final Design Authorization
13. Report on the status of the IPC E-forum- (IPC-IEF 2012)
Executive Project Kickoff
{Project Name} Organizational Chart, Roles and Responsibilities
EMS/Trauma Registry Information System Project
Presentation transcript:

Conversion of PDS Catalogs and Specifications to SmartPlant 3D Toshio Hayashi Project IT Group Manager Toyo Engineering Corp. Oct , 2009

Global Toyo – EPC Offices 3D + Marian 3D Marian 300 Toyo Korea (Seoul) Toyo EU (Luxembourg) TOYO JAPAN Toyo USA (Houston) Toyo India (Mumbai) Toyo China (Shanghai) 2800 1500 All Global Toyo  5800 Toyo Malaysia (Kuala Lumpur) Toyo Thai (Bangkok) Toyo Brazil (Rio de Janeiro) Toyo EU Toyo China Toyo Korea Toyo India Toyo Malaysia Toyo Thai Toyo USA Toyo Brazil 2

Toyo’s Business Segment History Industrial Systems Facilities & Environment Number of project Gas & Petroleum Energy Solution Petrochemical Chemical Fertilizer 2010 1961

Toyo-Japan 3D-CAD History 1980 1990 2000 2009 1983 1987 1998 CAPES - Toyo Own Developed 3D-CAD - 30 Projects completed - Working with Host Computer 1993 1995 Intergraph PDS - 50 Projects completed - Toyo Own Customization for QC Tools / Dwg Issue Control / Physical Piping Support Library - Interface to SPMaterial 2005 R&D phase Intergraph SmartPlant 3D Actual Project Ready to apply to Actual Project NOW !! 4

Introduction Background - Why Toyo chose Conversion in 2007 Development stage of SP3D @Toyo Manpower limitations Cost Evaluation (Remodel / RDB only / Full Conversion) Conversion Project (for Reference) Petrochemical Process Plant 350 Equipment, 4000 Piping lines, 8000 sheets of Piping Iso. Full PDS Modeling including U/G system 5

Outline of PDS  SP3D Conversion Work Task-1 PDS RDB -> SP3D RDB Translation By Intergraph Conversion Center 3 months for Piping / Structure / Raceway RDB Task-2 PDS model -> SP3D model Migration 8 months for all PDS models migration Manual Touch up and Confirmation for Converted SP3D model By TOYO 4 months for manual touch up 2 months for all Piping Iso extraction Catalog DB preparation Model DB migration SP3D Finalization

Schedule of Conversion Work Dec.2007 Feb.2008 Sep.2008 Mar.2009 PDS V7.2 As-Built Task-1 : 3 months Upgrade PDS V7.2  8.0 PDS Spec Translation Confirmation Task-2 : 8 months Deliverable - Excel file for Bulkload PDS Model Migration Confirmation Deliverable - Plant Backup file (.bcf) Work By TOYO Work By Intergraph SP3D Model Touch up & Confirmation 4 + 2 months 7

RDB Translation (Task-1) - Outline Piping Specifications 35 Piping Specifications translated with PDS Datatranslator.exe 2500 Piping Specialty and Instrument items creation Symbol mapping + 30 custom EDEN (User symbols) creation Structure Sections 2700 Structure sections translation with assistance of DCC tools 40 Custom sections creation EE Raceway Specifications 242 Specification creation with assistance of DCC tools PDS/SP3D Code List creation Additional Toyo specific PDS code creation 8

Model Migration (Task-2) - Outline Piping Models 130 Piping models migration Creating connectivity and tapping manually about 3000 points Equipment Models 95 Equipment models migration (Import as G-Types + Manual remodeling) Structure Models 73 Structure models migration + General Solid Import as G-Types EE Raceway Models 12 EE Raceway models ( HVAC Models  No HVAC model available ) 9

Manual Touch up and Quality Confirmation @ Converted SP3D model Incorporated additional field change (as built conditions) 500 Field Revision incl. all discipline Physical Piping support modeling Only critical items available on PDS (before conversion) PDS Civil General Solid model  SP3D G-type PDS FrameWorks Solid  PDS Equipment  SP3D G-Type shape Manual selection by each item wise Confirmation for Quality of Converted SP3D Model Extraction of all Piping Isometric Drawing (8000 sheets) 10

Model Migration - Limitations Piping Models Model migration by PDS model basis  Piping line connection through PDS models created manually for Piping Iso creation by line wise Equipment Models Connection between equipment shapes are not maintained. Ladders, stairs and handrails are migrated as individual columns and beams. Structure Models Migrated Structure models don’t have connectivity between structure members. 11

Summary RESULTS and FEED BACK For RDB Translation For Model Migration Successful use of semi-automated tools for Piping Successful manual effort for other RDB data (steel, tray, etc) Translated specifications provide a basis of Toyo standard RDB in SP3D For Model Migration Results not identical to native SP3D due to known limitations ~70 % of PDS data migrated by tools, ~30% manual rework Quality assurance issue, How to validate?? 12

For more detail on legacy data conversions and Intergraph tools and capabilities contact you local Intergraph office or Richard Smykay Richard.smykay@intergraph.com Thank you !!