FIRELEC Migration Solution

Slides:



Advertisements
Similar presentations
Module 3 Configuring Hardware on a Computer Running Windows XP Professional.
Advertisements

DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
MXL to FireFinder XLS Total Migration Solution
ESTEC Test Centre Division Directorate of Technical and Quality Management HYDRA PLC Replacement Debriefing Meeting.
Ports, Cables and Connectors
Mgt 240 Lecture Exam Review February 1, Homework Three Due Friday 2/4 at 5pm Due Friday 2/4 at 5pm Any questions? Any questions? Posted on course.
What is adaptive web technology?  There is an increasingly large demand for software systems which are able to operate effectively in dynamic environments.
Copyright © 2005 Rockwell Automation, Inc. All rights reserved. 1 Turning Time... into money With Rockwell Automation’s Integrated Architecture.
Control Activity & Industry Services
Chapter 7Assembling Your Own Computer System  7.1Assembling the Hardware 7.1Assembling the Hardware 7.1Assembling the Hardware  7.2Installing the Operating.
1 Exercise 1 Computer Hardware. 2 Objectives for Exercise 1 When you complete this exercise, you will be able to:
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
WP6: Grid Authorization Service Review meeting in Berlin, March 8 th 2004 Marcin Adamski Michał Chmielewski Sergiusz Fonrobert Jarek Nabrzyski Tomasz Nowocień.
1 RWM P OWER FEED TO EACH COIL S. Ramakrishnan. 01/29/20102 RWM COILS Existing Status The Six RWM coils are grouped in pairs Each Pair is fed from one.
Assessment Outcomes 2 and 3 Russell Taylor. Assessment Outcome 2 Set-up an operational computer system with a range of computer hardware Practical & Theoretical.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
First, let’s review the structure and use of a breadboard.
This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization. FIRELEC Migration Solution Don't let wiring.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
Chiller control system Lukasz Zwalinski – PH/DT.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
/10 FIRELEC Migration Solution This document and the information therein are the property of FIRELEC and shall not be copied or communicated to a third.
New product introduction:
60kW Thermosiphon control system
Chapter 1 Replacing Power Supplies Prepared by: Khurram N. Shamsi.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Field Replaceable Units, Common Problems, and Flowcharts.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
RS3-FIM series Migration Don't let wiring costs prevent you from upgrading an RS3 FIM series system to a DeltaV system This document is the property of.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
Lesson 10: Thevenin’s Theorem and Max Power Transfer
C1300 advanced circular chart recorder
WHAT IS A NETWORK TYPES OF NETWORK NETWORK HARDWARE
ABT-EC EYETS Activities 2nd reports
Computer and Information Technology for HKCEE
Fujitsu Training Documentation Hardware Installation
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
K TO 12 CHS MODULE FOR GRADE 9, PP
LCLS-II Cryoplant Controls Readiness to Procure
Installation Plan Checklist
FIRELEC Migration Solution
Computer Numerical Control
Personal Computers and Applications
SC1R Cold Box PDR Controls
Programmable Logic Controllers (PLCs) An Overview.
FIRELEC Migration Solution
Systems Design, Implementation, and Operation
FIRELEC Migration Solution
Chapter 2: The Linux System Part 1
Body Electrical System
FIRELEC Migration Solution
Communications & Computer Networks Resource Notes - Network Hardware
Vertical Cryostat Kick-off metting
FIRELEC Migration Solution
FIRELEC Migration Solution
Series 5300 Lithium Cell Formation System
FIRELEC Migration Solution
FPGA Vinyl to Digital Converter (VDC)
PLC Front Panel.
EXP file structure.
Electrical components and systems
Field installable, upgradeable and scaleable
Presentation transcript:

FIRELEC Migration Solution Don't let wiring costs prevent you from upgrading a PROVOX™ 20 series system to an EXPERION C300™ system This document is the property of Firelec. No copy, even partial, allowed without prior writen authorization.

PROVOX™ 20 series > EXPERION C300™ FMS-PVXCL-EXP PROVOX™ 20 series > EXPERION C300™ Two solutions available : Solution N°1 : FMS-PVXCL-EXP-1 Removing I/O panels Removing associated I/O cables Removing I/O files CP6701 Replacing existing PROVOX™ I/O panels by new FIRELEC IOPs (Input Output Panels) Solution N°2 : FMS-PVXCL-EXP-2 Keeping existing I/O panels Keeping associated I/O cables Keeping I/O files CP6701 and removing communications and I/O cards Installing PIAs (PROVOX™ Interface Adapters) in the existing CP6701 I/O files

PROVOX™ 20 series > EXPERION C300™ Using IOPs FMS-PVXCL-EXP-1 PROVOX™ 20 series > EXPERION C300™ Using IOPs No existing PROVOX™ hardware is kept (I/O File – I/O card – I/O panel – I/O cable) Existing PROVOX™ I/O panels are replaced by new IOPs which are electrically and mechanically fully compatible Existing wiring is kept in place Time for Hardware migration from an old toward a new I/O panel : about 30mn per panel I/O card and I/O panel to be removed

Process I/Os stay in place in the existing cable trays FMS-PVXCL-EXP-1 Hardware to be removed PROVOX™ Highway to be removed Primary PROVOX™ Highway Secondary PROVOX™ Highway SR90 or SRx Controller to be removed SR90 or SRx Controller CP6701 Power supply and Communication Cards to be removed 1 - 14 I/O cards 20 series to be removed I/O Termination panel I/O cables to be removed I/O Termination panel I/O Termination panel I/O panels to be removed Process I/Os stay in place in the existing cable trays Process I/Os

Hardware to be installed FMS-PVXCL-EXP-1 Hardware to be installed Secondary EXPERION C300™ Highway Cntrl PS I/O1 I/O2 I/O3 I/O4 I/O5 I/O6 I/O7 I/O8 Primary EXPERION C300™ Highway The new EXPERION C300™ architecture is installed The new IOPs are installed using the existing mechanical structure of the cabinets (30 mn per panel) The new FIRELEC I/O cables are installed between IOPs and EXPERION C300™ I/O cards New I/O panel New I/O panel New I/O panel Process I/Os

The main advantages of the IOPs for PROVOX migration are as follow : FMS-PVXCL-EXP-1 Advantages The main advantages of the IOPs for PROVOX migration are as follow : Existing wiring is just disconnected and reconnected without any change at the same place (same terminals with same labelling and same electrical features) The existing loop drawings are kept without any modification, allowing all maintenance processes and procedures to remain unchanged.

I/O panel and cable to be kept FMS-PVXCL-EXP-2 PROVOX™ 20 series > EXPERION C300™ Using PIA (PROVOX™ Interface Adapter) I/O card to be removed New EXPERION C300™ System I/O panel and cable to be kept The PROVOX™ Interface Adapter (PIA) allows to connect easily, an existing PROVOX™ Termination Panel to a EXPERION C300™ I/O card keeping : the existing I/O panel the existing associated I/O cable

Hardware to be removed FMS-PVXCL-EXP-2 PROVOX™ Highway to be removed Primary PROVOX™ Highway Secondary PROVOX™ Highway SR90 or SRx Controller to be removed SR90 or SRx Controller CP6701 Power supply and Communication Cards to be removed I/O cards 20 series to be removed 1 - 14 I/O Files (CP6701) are kept I/O panels and I/O cables stay in place in the existing cabinets Process I/Os stay in place in the existing cable trays I/O Termination panel I/O Termination panel I/O Termination panel Process I/Os

Hardware to be installed FMS-PVXCL-EXP-2 Hardware to be installed Primary EXPERION C300™ Highway Secondary EXPERION C300™ Highway Cntrl PS I/O1 I/O2 I/O3 I/O4 I/O5 I/O6 I/O7 I/O8 The new EXPERION C300™ architecture is installed The new FIRELEC I/O cables are installed between PIAs and EXPERION C300™ I/O cards CP6701 The I/O files are kept and used for the installation of the PIAs No active component is kept in the existing file The new PIAs are installed in the existing I/O Files (CP6701) I/O Termination panel I/O Termination panel I/O Termination panel Process I/Os

The main advantages of the PIAs for PROVOX migration are as follow : FMS-PVXCL-EXP-2 Advantages The main advantages of the PIAs for PROVOX migration are as follow : Existing I/O cables are just disconnected from the PROVOX™ I/O cards and reconnected to the PIA without any change at the same place (same electrical features) The existing loop drawings are kept without any modification, allowing all maintenance processes and procedures to remain unchanged.