Integration, Test, and Calibration

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Advertisements

GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectI&T&C Particle Beams - Pre PDR Presentation– Oct. 2, 2001 Gary Godfrey1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS
GLAST LAT Project Lessons Learned / Needed Procedures/ Documentation Control – October 23, 2003 B. Grist1 Lessons Learned / Needed Procedures / Documentation.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 E. do Couto e Silva 1 Final Data Taking with SLAC (Data for Instrument Analysis Workshop 7) Eduardo do.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST LAT ProjectI&T PDR – Jan. 9, 2002 Gary Godfrey1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
CINEMA System Engineering
GLAST Large Area Telescope:
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Integration and Test Organization Chart
Large Area Telescope Project
Management Breakout: MREFC Budget Summary Victor L
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
Integration and Test Organization Chart
GLAST Large Area Telescope
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

Integration, Test, and Calibration Brian Grist Integration and Test Engineer bgrist@slac.stanford.edu

I&T Milestones TKR & CAL Modules A & B Ready for Integration into Calibration Unit 08/15/03 TKR & CAL Modules 1 & 2 Ready for Integration into Calibration Unit 11/03/03 Calibration Unit Beam Test Complete 04/17/04 Flight Grid Ready for Integration 01/02/04 Flight TKR & CAL Modules 3 & 4 Ready for Integration 01/02/04 Flight TKR & CAL Modules 15 & 16 Ready for Integration 03/24/04 Flight TKR & CAL Modules 1 & 2 Ready for Integration 04/26/04 Flight ACD Ready for Integration 04/26/04 LAT Instrument Ready for Environmental Testing 07/09/04 LAT Instrument Pre- ship Review 01/07/05 LAT Instrument Ready to Ship 03/01/05 GLAST Launch 03/06

I&T Schedule

Draft I&T Cost Estimate (FY99$)

Integration & Test Cost Estimates Current Approved Project Management Cost Profile (Escalated $) P3 Cost Loading Report PRIMAVERA PROJECT PLANNER Integration and Test RUN NO. 80 COST LOADING REPORT START DATE 03APR00 FIN DATE 29MAR06 11:03 DATA DATE 01SEP01 PAGE NO. 1 TOTAL USAGE FOR YEAR FY DESCRIPTION TOTAL 2000 2001 2002 2003 2004 2005 2006 4.1.9.1 INTEGRATION 3147387 61125 679320 672960 758185 698028 277769 4.1.9.2 RELIABILITY 103964 16701 45495 41768 4.1.9.3 I & T PREPAR 388485 209497 73317 73614 32058 4.1.9.4 CALIBRATION 557444 146081 272508 138855 4.1.9.6 FLIGHT LAT I 2988830 351417 976635 1368143 267715 24921 4.1.9.7 MISSION INTE 189395 21114 31191 79658 57433 REPORT TOTAL 7375506 77826 1452924 2068379 2338796 1077458 360123

Mapping of WBS items to Manager Responsibility I&T&C Manager E. Bloom WBS 4.1.9 I&T Engineer B. Grist WBS 4.1.9.1 Reliability & QA D. Marsh WBS 4.1.9.2 Instrument Operations Coordinator S. Williams Ground Support Equipment TBD Online Manager R. Claus Integration, Facilities, Configuration, and Test O.Millican (Acting) Particle Test Manager G.Godfrey Environmental Test Manager M. Lovellette Calibration, Analysis and Science Verification E. do Couto e Silva I&T Preparation 4.1.9.3 EM Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7

On-Project vs. Off-Project Manpower I&T Organization must rely heavily on Off-Project manpower Off-Project Manpower Elliott Bloom Eduardo do Couto e Silva Gary Godfrey Paul Kuntz Hiro Tajima Post Doc (currently 1.5) Stanford Graduate Students (currently 4) other contributed collaboration labor for tasks like Calibration under Eduardo and staffing of shifts during tests under Ossie Current On-Project Manpower Brian Grist Ric Claus Ossie Millican John Broeder NRL Team (Environmental Testing) TBD Programmer (for Eduardo) TBD GSE (Mechanical Engineer) other resources that are being identified

DRAFT - Fiscal Year vs. FTE

DRAFT - On and Off Budget FTE

Choices that Impact Schedule and Budget NRL as Environmental Test Site Choice Schedule Environmental tests at NRL all in one trip will reduce schedule impact due to shipping and verification testing. Budget Environmental tests at NRL will fit within the budget allocated for Acoustic/Vib and Thermal Vacuum ~$600k (escalated) for tests at NRL Fits within (escalated) currently allocated budget One beam test at SLAC only (drop CERN test) Saves about one month in the I&T timeline Reduction in the shipping and cost due to two functional checkouts

I&T schedule and budget work I&T managers are addressing their schedule and budget requirements and these will need to be folded into the official schedule and budget I&T plan needs to be agreed upon before loading into P3 Updated Schedule and resources needs to be loaded into P3 Rectify differences in the Resource Loaded P3 schedule and the budget restrictions