PROJECT SCHEDULING PERT - Cost.

Slides:



Advertisements
Similar presentations
Chapter 7 Project Management
Advertisements

TK3333 Software Management Topic 7: Schedule Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
Project Management and scheduling Objectives of project scheduling Network analysis Scheduling techniques.
Project Scheduling Basic Approach. projectA project is a collection of tasks that must be completed in minimum time or at minimal cost. activitiesIt is.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
1 7.1 Introduction A project is a collection of tasks that must be completed in minimum time or at minimal cost. Tasks are called “activities.” –Estimated.
PERT/CPM Models for Project Management
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Projmgmt-1/14 DePaul University Project Management I - Realistic Scheduling Instructor: David A. Lash.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Operations Management Project Management
1 Project Control Kathy S. Schwaig. 2 What is Project Control? Project control is the continuous monitoring of the project for deviations from plan (time,
Quick Recap Monitoring and Controlling. 2 Control Project Cost.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PERT and CPM.
6/10/01Network Problems: DJK1 Network Problems Chapters 9 and 10.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Project Scheduling IENG 321 IENG 321.
1 TCOM 5143 Lecture 11 Project Management. 2 What’s Project Management? Project management involves planning and scheduling the different activities of.
Quick Recap Monitoring and Controlling. Difference and connection In put Transformation processes Out put Feedforward control Feedback control Concurrent.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management: PERT/CPM
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Project Scheduling Lecture # 1.
PERT and CPM.
Project Management Chapter 13
Most commonly used methods for project management.
Project Planning & Scheduling
Project Management for Business
Project Management and scheduling
Project Scheduling Chapter 14.
Activity Planning.
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Software Development & Project Management
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Welcome to MM 305 Unit 8 Seminar!
Prepared by Lee Revere and John Large
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Chapter 6 Activity Planning.
Slides Prepared by JOHN LOUCKS
Project Management CPM/PERT Professor Ahmadi.
Project Time Management
Project Time Management
Chapter 6 Activity Planning.
Project Time Management
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

PROJECT SCHEDULING PERT - Cost

PERT / COST PERT/Cost is an accounting information system that helps management gauge progress against scheduled time and cost estimates. When discrepancies are found between the actual progress and the expected progress, corrective actions can be taken. PERT/Cost is a project oriented system that is based on analyzing a segmented project. Each segment is a collection of work packages.

Work Package - Assumptions Once started, a work package is performed continuously until it is finished. The costs associated with a work package are spread evenly throughout its duration.

Current Status of a Work Package includes Work Package Forecasted Cost per Time Unit Budgeted Total Cost for Work Package Expected Completion Time for Work Package = Current Status of a Work Package includes Value of work done to date. Expected time remaining to complete the work package. The value of work and the remaining time are calculated using the following data: Work package cost per time unit. Activity schedule obtained by PERT/CPM Actual expenditures. % of work package completed, p.

p x [Work Package Budget] Value of Work to Date = p x [Work Package Budget] Expected Remaining Completion Time = (1-p) x Original Expected Completion Time

Completion Time Analysis Using the expected remaining completion time estimates, project completion time can be revised. Cost Overrun/Underrun Analysis For each work package (completed or in progress) we calculate Cost Overrun = [Actual Expenditures to Date] - [Value of Work to Date]

Corrective Actions If a project is found to be Behind schedule and or Experiencing cost overruns, Management seeks out the causes for these problems. Correct the project completion time or cost estimates. Reassess work package completion times and cost estimates. Identify departments or contractors that cause delays.

Possible Corrective actions, to be taken whenever needed. Focus on uncompleted activities. Determine whether crashing activities is desirable. In the case of cost underrun, channel more resources to problem activities. Reduce resource allocation to noncritical activities

TOM LARKIN - Revision Normal completion time = 36 weeks. At the end of week 20 a progress assessment is made. If the campaign is not on target or not within budget recommendations for corrective actions are required.

Mayoral Campaign status report Work packages to focus on

Completion Time Analysis The remaining network at the end of week 20 (1-p)(original expected completion time)=(1-0.25)(20)=15 H 20+15=35 15 FINISH 27.8+9=36. 8 .8 I F 9 7.8 20+7.8=27.8 The remaining activities are expected to take 0.8 weeks longer than the deadline of 36 weeks.

Cost Analysis Project cost Control Estimated work value to date=(13,000)(0.40)=$5,200 Cost Overrun = 5600 - 5200 = 400

Latest start time / Latest finish time Make a backward pass through the network as follows: Evaluate all the activities that immediately precede the finish node. The latest finish for such an activity is LF = minimal project completion time. The latest start for such an activity is LS = LF - activity duration. Evaluate the LF of all the nodes for which LS of all the immediate successor has been determined. LF = Min LS of all its immediate successors. LS = LF - Activity duration. Repeat this process backward until all nodes have been evaluated.

Latest Start / Latest finish 105,110 149,170 90,105 B B 15 C C 5 110,115 173,194 E 21 E 95,110 129,149 90,115 115,129 149,177 129,149 90, 115 115,129 153,173 166,194 5,95 129,149 0,90 FINISH 129,149 F 25 F G G 14 129,149 D D 20 146,166 H H 28 A A 90 0,90 FINISH 129,149 129,149 129,149 129,149 129,149 29,119 194 149,194 90,120 149,194 119,149 J J 45 I I 30