BY SHASHI RANJAN CHIEF MANAGER (CIMG) GAIL( INDIA) LTD. NOIDA

Slides:



Advertisements
Similar presentations
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
Advertisements

pipeline-solutions Progis PROGIS Software AG Software that Shows ! Geographical Information System System for Pipeline Management PipeGIS.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
TransCanada Corporation (TSX/NYSE: TRP)
The Experience Factory May 2004 Leonardo Vaccaro.
Overview of Key Rule Features
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Euseden INTERNAL AUDIT & ASSURANCE SERVICES.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Consultancy.
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Morphum Environmental Ltd Environmental Engineers and Consultants
CIS Case History NACE Eastern Area Conference
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
RBM and Asset Strategy.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
ICDA of Gas Transmission, Gathering & Storage Systems GOAL: Develop a protocol for Validation of dry gas ICDA method: –Identify data needs –Develop procedures.
Integrated Monitoring and Control of Foodborne Viruses in European Food Supply Chains.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Checking and Corrective Action EPA Regions 9 & 10 and The Federal Network for Sustainability 2005.
Gas Pipeline Safety Federal Regulatory Update Pete Chace Public Utilities Commission of Ohio Gas Pipeline Safety Program Manager.
Important acronyms AO = authorizing official ISO = information system owner CA = certification agent.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
Stray Current Mitigation & Cathodic Protection Regulation Pipeline Corrosion Management seminar Melbourne 29 June 2017 Peter Wade Manager Electrolysis.
Environmental Safeguards
An oil company in Canada
2 Seas Monitoring and Evaluation approach INTERACT seminar – Evaluation Plan workshop Vienna, 12 November 2015.
INTEGRITY SOLUTIONS SERVICES
Chapter 10 Software Quality Assurance& Test Plan Software Testing
The International Plant Protection Convention
By: W.P. Daeng Beta Yusri Heni Asep S.H. Syaifulloh
ServiceNow Implementation Knowledge Management
PipelineML 90th OGC Technical Committee Washington, DC
Arunkumar Appu / PM / SBU B 1 OISD A technical organization of Govt Of India working under MINISTRY OF PETROLEUM AND NATURAL GAS (MOP &NG) Located at 7th.
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Traceability of Gas Pipeline Materials Research & Materials Manager
Outcross Resources - Services Overview
Overview of GAIL’s Pipeline Network PSC th March 2018
Project Update - Accomplishments March 28, 2018
AGA MAOP Document Review / PODS Implementation
Risk Based inspection in pipelines PSC th March 2018
Statistics Governance and Quality Assurance: the Experience of FAO
Introduction on the outline and objectives of the workshop
Albania 2021 Population and Housing Census - Plans
Energy performance and Carbon emissions Assessment and Monitoring tool
Distribution Integrity
When and how to best consider the provision of the Habitats directive
Fertilizer Industry Safety Information Analysis and Sharing Program
Analysis of the notification of compensatory measures
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
An overview of Internal Controls Structure & Mechanism
Draft revision of ISPM 6: National surveillance systems ( )
Roles and Responsibilities
Pipeline Integrity Management Programs
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

BY SHASHI RANJAN CHIEF MANAGER (CIMG) GAIL( INDIA) LTD. NOIDA Integrity Management for Petroleum Pipelines- GAIL's journey so far PSC 2018 08th March 2018 BY SHASHI RANJAN CHIEF MANAGER (CIMG) GAIL( INDIA) LTD. NOIDA

Introduction – Pipeline Integrity Management: Gail's Journey So far….. GAIL started its journey in 1984 as a Gas Pipeline Company 1st Project 1700 Km long HVJ Pipeline, commissioned in 1987 Over a period of 30 years plus, GAIL has expanded its pipeline network to 13500 Km Since, the beginning of pipeline O&M journey, GAIL has strived to maintain highest level of pipeline integrity by monitoring & maintenance of its pipeline assets as per relevant ASME & OISD codes / standards However, it was always felt that Focused Approach towards Pipeline Integrity was required for establishing sustainable institutional systems and processes for uniformity in monitoring & maintenance practices across the organisation, which we are striving to achieve through various initiatives taken at central & regional level along with implementation of PNGRB IMS

Promulgation of PNGRB era Pre-PNGRB era pipeline design in GAIL: As per ASME B 31.8 and ASME B 31.4 for gas and liquid respectively (along with applicable OISD standards) - Aligned as per PNGRB’s T4S regulations Pre-PNGRB era pipeline integrity management in GAIL: As per ASME B 31.8S (along with applicable OISD standards / guidelines) - Aligned with PNGRB’s IMS regulations All the Natural Gas pipeline networks of GAIL have already implemented PNGRB’s Integrity Management System (IMS).

IMS Implementation S.N. Network IMS Approval 01 KG Basin* 06.02.2015 Maharashtra* 03.08.2015 03 HVJ/DVPL/GREP 04 Lakwa 05 Tripura 06 NCR 07 Dabhol-Bengaluru S.N. Network IMS Approval 08 Ramgarh 03.08.2015 09 Cauvery Basin 10 Gujarat 11 KKBMPL Phase 1 25.01.2017 12 JLPL (LPG)** Draft prepared 13 VSPL (LPG)** * IMS Rev-2 is under progress **PNGRB IMS regulation for liquid pipelines is in draft stage and not notified.

Approach towards Integrity Management of GAIL’s Pipelines O&M Policy and Guidelines PIMS Framework and Guidance Documents IQMS (ISO 9001 / 14001) IMS (PNGRB-IMS:2012) SOPs, Site Procedures & Work Instructions IMS (PNGRB-ERDMP:2010)

Focused Approach towards Pipeline Integrity Creation of Central Integrity Management Group (CIMG) as well as Regional Integrity Management Group (RIMG) at each network To put in place sustainable institutional systems and processes Identification and management of threats based on integrity surveys Monitoring mitigation action conducted at sites and re-evaluation of risks Resolving issues and recommendations on specific queries Subject Matter Experts (SMEs) IMS review of all pipeline networks

Major Initiatives – Integrity Management Continual Review of O&M Policy & Guidelines to reflect the current industry best practices and technological developments Standardization of pipelines SOPs, Guidance documents and work procedures Building Integrity Data bases on digital platforms for efficient data collection, analysis and reporting Implementation of Pipeline Integrity Management Software

Major Initiatives – Integrity Management Mapping of all pipelines of GAIL on GIS platform GPS based pipeline ROU surveillance Evaluation of new technologies in pipeline surveillance Moving towards Performance based Integrity Management System

Integrity Assessment Techniques Prescriptive Integrity Assessment Techniques ASME B31.8S In-Line Inspection (ILI) Direct Assessment (DA) Hydrotest (Pressure Test) PNGRB IMS Regulations GAIL has requested PNGRB for inclusion of Hydrotest and some other assessment techniques such as Magnetic Tomography Method (MTM) in prescriptive integrity assessment techniques

INTEGRITY ASSESMENT METHODS In-Line Inspections (ILI) The first ILI tool (Corrosion Detection Pig) was run in 26” X 19.5 Km, Uran – Thal P/L in March 1999. Since then, 10000 Km of pipeline has been inspected by ILI. Other 1500 km (new / low flow) pipelines are in process for inspection by ILI. The ILI in GAIL is done by A-MFL and A-MFL & C-MFL (Based on no. of years of operation / threats perceived). Direct Assessment (DA) First time DA in GAIL was done in the year 2012 in GAIL – NFL Vijaipur pipeline ICDA of Wet Gas / LPG pipelines – By outsourcing ECDA / SCCDA of Wet Gas / LPG pipelines – By employing procured software tool ICDA / ECDA / SCCDA of Dry Gas pipelines – By employing procured software tool

Moving towards Performance Based Integrity Management Based on the threats envisaged, inspection intervals (as prescribed) for ILI / CP Surveys / AC & DC Interference Survey are shortened in many cases to effectively identify threat, assess them and prioritize rehabilitation(s). For Corrosion Growth Assessment - ILI carried out in an interval of 02 years LPG Pipeline / Pipelines having history of carrying wet gas – ILI in every 05 years Pipelines having history of carrying wet gas – Cleaning pigging every fortnight/ month / quarter AC / DC Interference surveys – Based on ILI results

Intranet based Integrity Database management and Applications Pipeline Master Integrity Scheduler Cleaning Pigging Data ILI Management System Cathodic Protection Source Quality Monitoring Corrosion Probe & Coupons Hydrotest Records

CPIMS Asset Manager

Integrity Management Plan & Implementation in CPIMS Identifying potential pipeline impact by threat ETL (Extract Transform Load) Alignment Analyst Geospatial Analyst Risk assessment Gathering, reviewing and integrating data Responses to integrity assessments and mitigation Integrity assessment Risk Assessment Feature Assessment Cathodic Protection Analyst Corrosion Analyst Stress Analyst Verification Manager Task Manager All threats evaluated

Mapping of Pipelines on GIS Platform GIS mapping of pipeline with Geo Tagged critical features Pipeline alignment Stations Crossings Pipeline depth data Dwelling units and cadastral information in 200 m corridor All point of interest in 20 km corridor etc.

GPS based Pipeline ROU Surveillance For monitoring of ROU, GAIL has started Foot patrolling along its pipeline with GPS devices. INTENSIVE PATROLLING NG PIPELINES Helicopter Patrolling : Monthly Ground Patrolling with GPS : NG Pipeline in Class 3 & 4: Monthly & Class 1 & 2: Quarterly. LPG PIPELINES Helicopter Patrolling: Monthly Ground Patrolling with GPS: Weekly NG & LPG Pipeline in Urban Area: Daily Ground patrolling

Evaluation of new technologies in pipeline surveillance - PIDS Footsteps detected between 0 – 2 meters and Manual digging detected between 0 to 10 Metres Light Vehicles detected between 0 - 10 Metres Controller Mechanical digging between 0 – 20 Metres Existing OFC Optical Fiber Based Pipeline Intrusion Detection System

Evaluation of new technologies in pipeline surveillance - UAV UAV imagery-based remote pipeline surveillance, coupled with digital technologies such as big data and analytics and mobility, provides better visuals. Absence of human intervention makes workplaces safer. It is environmentally sustainable and contributes significantly to reducing greenhouse gasses. Unmanned Aerial Vehicle (UAV)

Evaluation of new technologies in pipeline inspection MTM (Magnetic Tomography Method) & CMD (Contactless Magnetometric Diagnostics) Based on Villari Effect - Change of the magnetic susceptibility of a material when subjected to a mechanical stress. Levels of magnetic field without stress-concentrator (right) Magnetic field of pipe with stress-concentrator (below) The change of local mechanical stress modifies magnetization of the pipeline, which is reflected in the magnetic field and detected by MTM

Conclusion New initiatives by GAIL: Enhancing the knowledge base and establishing new techniques in Integrity Management of Pipelines and Assets. Pipeline Operators’ FOCUS: Zero Incident How? Constant Search for the Weakest Link …

Thank you