Texas North Transmission Improvements

Slides:



Advertisements
Similar presentations
NedPower Mount Storm Project Update for Grant County September 25, 2007.
Advertisements

Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
SPP.org 1. Economic Portfolio Update – CAWG Meeting – AEP Offices, Dallas August 27, 2008.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Information about 2009 Summer Workshop. Progress Energy operates power plants in ______________. A.only western North Carolina B.North Carolina C.North.
Midwest Energy, Inc. Transmission Planning and Expansion
Existing informal footpath (owned by HCA) to connect to Lodge Jct crossing Carriageway widened into wooded area Proposed area for landscaping.
Adding to the Fleet Ensuring SRP’s Long Term Generation Reliability May Millies, Manager - Power Generation Services.
Garrison Oak Technical Park Economic Update Economic Update June 26, 2015.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
Slide 1. Central Plains (High Plains) Wind Farm in Wichita County, Kansas, classified as tilled and flat. Inset shows buried cable that was highly visible.
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Current Construction Projects Major Projects Pinellas County.
Puget Sound Energy Columbia Grid Presentation June 19, 2007 John Phillips.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
1 Overview of Stanton Division and SPS Lines’ Purchase June, 2013.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
Transmission Options for Mariah Project, Phase II 3/10/2010.
ACC Summer Preparedness Hearing Tucson Electric Power & UNS Electric March 22, 2007 Ed Beck Superintendent Transmission & Distribution Planning.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
1 Entergy Transmission Planning Summit New Orleans, LA July 10, 2003 Generation and Transmission Development in the Southeastern United States.
Fossil Fuel Power Stations Stefan Suarez, Harrison Pearl, Will Engelhardt, and YOU!
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Overview of Xcel Energy and SPS in New Mexico and Texas
Advancing US Gas Turbine Technology
Ardnacrusha.
Brownsville Overview Management Presentation November 2000
JEA’s Initiatives and Capital Improvements Program
Lincoln Energy Center Overview
Appalachian Power Update
Barrilla Junction Area Transmission Improvements Project
Wheatland Overview Management Presentation October 2000
Four Corners Wind Resource Center Webinar
Status Update for Reliability/Market Power Mitigation Assessment
Entergy Integration Study Update
Gleason Overview Management Presentation October 2000
Dominion Overview.
NON-CONVENTIONAL ENERGY SOURCES
Energy Transformations
Chapter 9 Myth: Wind Power Reduces CO2 Emissions
Brownsville Overview Management Presentation December 2000
Municipal Electric Power Association of Virginia Annual Meeting
Presentation to the Enron Corp. Finance Committee
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Motors and Generators Electromagnets Magnet Poles
Wind Energy.
Methane Capture and Use: Current Practices vs. Future Possibilities
Planning and Development Commission
31st USAEE/IAEE North American Conference
The Joint Accounting Conference 2018
SunZia Project Description
Energy sector activities and Plans in the DPRK
Westar Formula Rate and your bill
Dominion Investments in Virginia
Western Electricity Coordinating Council
Kansas Electric Transmission Authority (KETA)
The Process of Electricity Generation
Electric Power Generation
Energy Environment ENVE 411 Energy conversions.
Excelsior Energy’s Mesaba Energy Project
Application of Proposed New BES Definition:
Presentation transcript:

Texas North Transmission Improvements Most of these projects are proposed for 2008-2012 budget All have summer 2010 ISDs. Projects are: Hitchland 345/230/115 kV interchange - cuts the 115 kV lines that go into Texas County Intg. in and out of this new source and provides 230 kV source as well. 230 kV lines from Hitchland to Moore Co Hitchland to Pringle Hitchland to Prairie 115 kV lines from Dallam to Sherman Co Intg. Dalhart to Channing - ultimate rebuild all the way to Amarillo for this old 69 kV line Not included in proposed 2008-2012 capital budget was the Prairie- Cole 115 kV line

Hobbs Generating Plant Interconnection Facility Hobbs Plant - real name Lea Power Partners Plant - nominal 500 MW combined cycle plant. Consists of 2 GTs and 1 ST - design was to place the GTs on 115 kV and the steam turbine Lines around plant at 115 kV were connected in and out of new plant bus. Expedient method of interconnection. Steam unit is connected to 230 kV lines. Proposed ISD is June 2008

Channing Transmission Project More detail on Channing project - will build 115 kV from Dalhart to Channing at 115 kV, then conversion of 69 kV from Channing to Amarillo. Proposed ISD is June 2010.

Line from new Hobbs Generating Station to Seminole Exchange This transmission project connects the Mustang Plant ( GSEC’s plant) to a new transmission interchange, called Seminole Intg. and then on to the new Lea Power Partners Plant. First segment (Mustang-Seminole) is to be complete by late 2009 or 2010, Seminole-Hobbs complete by 2011.

Full X – PLAN (proposed) The western half of the X-Plan is shown in orange or yellow. The purple is the eastern half of the X. The western half is needed by GSEC to import their power purchase from the Sunflower’s Holcomb coal fired plant development. SPS believes the western half of the X-Plan and the interla improvements, the Potter-Roosevelt 345 kV line and the Tolk-Tuco 345 kV line can be built by spring 2012.

7 Rivers to Potash Transmission Line This is a 230 kV transmission project that will improve the reliability in southeastern New Mexico. It will go from the 230 kV bus at Seven Rivers to Carlsbad ( called Pecos Intg.) and on to Potash Junction. Proposed Isd is on or before summer 2009.

Transformer Upgrades These are budgeted transformer upgrades and current ISDs but may change should deliveries of transformers change.