Workshop on preparations for ANConf/12 − ASBU methodology

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/7
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Dynamic wake turbulence separation Saulo da Silva
Presentation transcript:

Workshop on preparations for ANConf/12 − ASBU methodology SIP/2012/ASBU/Nairobi-WP/24E Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, 13-17 August 2012)

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-86 Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Summary This ITP module enables an aircraft to reach a more satisfactory flight level for flight efficiency or to avoid turbulence for safety. Main Performance Impact KPA-02 Capacity, KPA -04 Efficiency and KPA-05 Environment. Operating Environment/Phases of Flight En-Route Applicability Considerations This can be applied to routes in procedural airspaces, Global Concept Component(s) CM, AUO, AOM Global Plan Initiatives (GPI) GPI-9, GPI-7 Pre-Requisites NIL Global Readiness Checklist Status (ready now or estimated date). Standards Readiness √ Avionics Availability Infrastructure Availability Ground Automation Availability Procedures Available Operations Approvals ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-86 - Baseline ITP using ADS-B is in operational use and hence can be considered to be a baseline. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Change Brought by the Module The introduction of ITP and ADS-B based separation minima enable aircraft to climb or descend through the altitude of other aircraft when the requirements for procedural separation cannot be met ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Intended Performance Operational Improvement Capacity Improvement in capacity on a given air route Efficiency Increased efficiency on oceanic and potentially continental en-route. Environment Reduced emissions Safety A reduction of possible injuries for cabin crew and passengers CBA To be determined ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Necessary Procedures (Air & Ground) Procedures for ITP using ADS-B have been developed and a PANS-ATM Amendment is in progress. Additional information will be available in an ICAO circular – “Safety Assessment for the development of Separation Minima and Procedures for In-Trail Procedure (ITP) using Automatic Dependant Surveillance – Broadcast (ADS-B) Version 1.5.4” ITP requires the use of CPDLC as per PANS-ATM amendment for an applicability date of Nov 2013. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Necessary System Capability Avionics The aircraft performing the in-trail procedure will require an ADS-B IN capability compliant with DO-312/ED-159 or DO-317A/ED-194. The other aircraft involved in the procedure will require an ADS-B OUT capability compliant with AMC 20-24/DO-260A/DO-260B/ED-102A, or DO-317A/ED-194. CPDLC compliant with DO-306 chg 1 / ED-122 chg 1is required. Ground Systems It is recommended that conflict probe logics be adapted to ITP separation minimum. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Training and Qualification Requirements The flight crew needs to be trained and qualified to understand the limitations of the equipment and to ensure a correct usage of the In-Trail Procedure and supporting avionics. The controller needs to be trained and qualified to assume the tasks and to ensure a correct usage of the In-Trail Procedure and ground support tools. ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-86 – Regulatory/standardization needs and Approval Plan (Air and Ground) Regulatory/Standardization Use current published criteria Approval Plans To Be Determined. Operational Approval guidance/criteria may be needed based upon regional application for ATSA. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 – Reference Documents Standards EUROCONTROL ATSAW Deployment Plan(draft) EUROCAE ED-159 / RTCA DO-312 “Safety, Performance and Interoperability Requirements Document for the In-Trail Procedure in Oceanic Airspace (ATSA-ITP) Application”. Approval Documents FAA AC 20-172a; and FAA TSO-C195a FAA Memo; Interim Policy and Guidance Automatic Dependent Surveillance Broadcast (ADS-B) Aircraft Surveillance Systems Supporting Oceanic In-Trail Procedures (ITP). Dated: May 10, 2010; DO-312/ED-159; DO-317A/ED-194; ICAO circular – “Safety Assessment for the development of Separation Minima and Procedures for In-Trail Procedure (ITP) using Automatic Dependant Surveillance – Broadcast (ADS-B) Version 1.5.4”. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-86 Implementation - Benefits and Elements Improved Access to Optimum Flight Levels through Climb/Descent Procedures using ADS-B Benefits - Main Key Performance Areas (KPA) KPAs Access Capacity Efficiency Environment Safety Applicable N Y Elements: - ITP using ADS-B To be reflected in ANRF ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP