2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE.

Slides:



Advertisements
Similar presentations
European Commission: DG Environment Monitoring, Reporting and Verification in the EU ETS: Status and Implementation Stakeholder Day on the EU MRG Cologne.
Advertisements

European Commission: DG Environment Closing Remarks: Key issues for follow-up from Stakeholder Day Stakeholder Day on the EU MRG Cologne 12 May 2005 Marco.
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
EMODNet Chemistry Steering Committee January 2014 Rome Giordano Giorgi
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
Establish Verification Procedures (Task 11 / Principle 6)
EU MONITORING AND REPORTING GUIDELINES STAKEHOLDER DAY Cologne, 12th May 2005 UK APPROACH: PAST PRESENT AND FUTURE Dr Rob Gemmill Technical Adviser Monitoring.
Introduction to ISO New and modified requirements.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
Automotive Test & Measurement Case Studies SAAMF Roadshow Durban CSIR NML Eddie Tarnow Metrologist: Torque & Automotive 14 June 2006.
EU-MRG Stakeholder Day Technical Session III: Cement and Lime May Jochen Harnisch, Ecofys
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheWorkshop European Standards Requirements of.
DG Environment European Commission Introduction to European ETV Promoting New Technologies Environmental Technology Verification Schemes Introduction to.
B. Neidhart, W. Wegscheider (Eds.): Quality in Chemical Measurements © Springer-Verlag Berlin Heidelberg 2000 J. Green Why do we need Good results? 1 Chemical.
Important informations
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
1 Saxony-Anhalt EU Twinning RO 04/IB/EN/09 State Environmental Protection Agency Wolfgang GarcheBukarest National Reference Laboratory for Air.
Importance of Energy Star program in the light of EUP T. Schoenmakers EICTA EUP issue manager.
The potential or unintended consequences of the proposed amendments to the listed activities – petroleum sector. Anton Moldan, Environmental Adviser South.
Quality Assuring Deliverers of Education and Training for the Nuclear Sector Jo Tipa Operations Director National Skills Academy for Nuclear.
12 May Cologne-CL 1 EU – ETS CO 2 Monitoring Stakeholders day MONITORING AND REPORTING GUIDELINES By Ir. Claude Loréa, CEMBUREAU Technical Director.
Technical Support for the Impact Assessment of the Review of Priority Substances under Directive 2000/60/EC Updated Project Method for WG/E Brussels 22/10/10.
Laboratory Perspective on Testing Methodologies Wendy Warren-Serna, Ph.D. USDA-FSIS Public Meeting Control of E. coli O157:H7.
EU-MRG Stakeholder Day Experience in Monitoring & Reporting in the EU-ETS: Stakeholder Consultation May 12, 2005 Sina Wartmann, Ecofys
Module N° 6 – SMS regulation
Wenclawiak, B.: Fit for Purpose – A Customers View© Springer-Verlag Berlin Heidelberg 2003 In: Wenclawiak, Koch, Hadjicostas (eds.) Quality Assurance in.
L Click to edit Master text styles l Second level l Third level l Fourth level l Fifth level Combustion Installations Stakeholder Day on the EU-Monitoring.
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
Abstract A step-wise or ‘tiered’ approach has been used as a rational procedure to conduct environmental risk assessments in many disciplines. The Technical.
1 CURRENT PRACTICES AND FUTURE CHALLENGES IN METHODS VALIDATION – NEW AREAS OF APPLICATION THE POINT OF VIEW OF AN ACCREDITATION BODY EURACHEM Workshop.
Establishing by the laboratory of the functional requirements for uncertainty of measurements of each examination procedure Ioannis Sitaras.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Kenya’s INDC: Actions in the Energy Sector
Challenges in Method Validation – A Regulatory Laboratory Perspective
Collaborative Decision Making (CDM) Saulo Da Silva
Forming a Strategy for your Business.
Quality Assurance in the clinical laboratory
Supervisor: Dr. Ian Wassell
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
(Additional materials)
Food Production Systems
BU IS GIG Chemical, Oil & Gas
EU – ETS CO2 Monitoring Stakeholders day
Technical Session VIII: Cross-Cutting Issues
EU-MRG Stakeholder Day
Diffuse Sources of Water Pollution
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
Risk Management with Minimum Weight
METHOD VALIDATION: AN ESSENTIAL COMPONENT OF THE MEASUREMENT PROCESS
LDZ System Charges – Structure Methodology 26 July 2010
Агенција за трговину емисионим јединицама СР Немачке
Chapter 13 Quality Management
…and still actual for a post-2010 strategy!
Meeting with Member State experts on Life Cycle Assessment of fuel in relation to Article 7a of proposal COM 2007(18) 17 July 2007 European Commission.
Technical Guidelines for the Identification of Mixing Zones
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
Standardisation - What to expect from it?
IMPLEMENTING DIRECTIVE 2000/60/EC CONCERNING MINIMUM PERFORMANCE CRITERIA FOR CHEMICAL MONITORING METHODS AND THE QUALITY OF ANALYTICAL RESULTS via a.
My Performance Appraisal How to write SMART objectives
Assessing the value of measured data Day 1.
IPPC Review Stakeholder Hearing
Portfolio, Programme and Project
Balanced Approach to Noise Mitigation
Diffuse Sources of Water Pollution
Balanced Approach to Noise Mitigation
Philippe QUEVAUVILLER
That person will have been involved in the planning of the work.
Presentation transcript:

2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE

Main issues What is a source? Uncertainty level and tier approach Metering equipment Emission factors FCC coke Lab accreditation Verification

The concept of source should not be interpreted What is a source? A physical point where CO2 is emitted a fundamental building block of the overall CO2 emission calculation for an installation such as a complete fuel system The concept of source should not be interpreted in a restrictive way

Uncertainty level and tier approach We support the principle of a tier approach Aim should be to link uncertainty to magnitude of emissions Two major criticisms of Commission’s proposed approach Tier structure is arbitrary and unnecessarily restrictive Does not appropriately reflect either technical feasibility or cost issues Uncertainty for a source depends on the installation it is part of Leads to unreasonable and unjustified requirements for relatively small sources that have only a minor contribution to the total No consideration of contribution of a source to total installation makes it difficult to determine optimum path towards improvement The KEMA approach proposes equal treatment of all sources but does not adequately address the issue of achieving desired global uncertainty at minimum cost Still results in very stringent requirements for relatively minor sources

Uncertainty level and tier approach The CONCAWE approach: linking tiers to global uncertainty target Combined uncertainty can be lower than that of some individual sources Overall uncertainty targets can be met without meeting current tier requirements on all sources In certain cases lower than target uncertainty could be achieved Reducing uncertainty does not reduce emissions! It therefore does not have an environmental benefit MRG should provide option to deviate from standard tiers as long as compliance with overall uncertainty can be established - Would allow operators to concentrate efforts onto the really important sources - Would give refiner maximum flexibility to implement - Would provide a clear path towards cost-effective improvement

Metering equipment In-field accuracy and precision are different from manufacturer’s data Operators should be able to select the most appropriate equipment type, calibration and maintenance protocols as long as they can be demonstrated to be fit for purpose Dialogue between permitting/competent authority and operator ISO 14181 specified for CEM’s does not allow calibration via a standard sample that are not adapted to refineries This is the only practical or feasible method for refinery flue gas analysers This requirement should be therefore be reconsidered Operator should instead demonstrate quality of calibration process

Use of standard emission factors should not be mandated Refinery fuels are not commercial products Their composition varies, particularly fuel gas Generic or national emission factors are always less accurate than locally derived ones either regularly measured or even inferred from local experience Use of standard emission factors should not be mandated

The FCC tiers should be reversed FCC coke The tier hierarchy proposed by the Guidelines appears to have been misconceived. The regenerator stoichiometric balance is likely to give more precise results The FCC tiers should be reversed

Laboratory accreditation to EN ISO 17025 Sound management of refinery labs is guaranteed by their QMS and EMS Technical competence is ensured through use of international analytical standards and regular inter-lab comparison programmes Refinery labs deliver CoQ’s for all commercial products including sensitive ones such as jet fuel Use of an external lab for gas samples is impractical or may lead to further deterioration of accuracy The requirement for EN ISO 17025 accreditation Should be waived when equivalent practices can be demonstrated

Verification Establishing monitoring protocols (e.g. calibration, frequency of sampling) are matters to resolve between operator and competent authority Verification should assess compliance with agreed protocols Not the validity of the protocol itself

Concluding remarks The aim of the EU ETS is to decrease CO2 emissions in a cost-effective manner The current monitoring and reporting guidelines are based on sound principles They, however, need to Better recognise the diverse reality of installations Be less dogmatic and more result-oriented Leave maximum flexibility to each installation to achieve a target level of uncertainty Be more attentive to costs and cost-effectiveness