NYS TRUSS IDENTIFICATION LAW

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

BUILDING CONSTRUCTION
CODE OF PRACTICE FOR BUILDINGS
NYS TRUSS IDENTIFICATION LAW
Step-by-step guide to prevent falls
Building Construction A fire resistive rating (FRR) is given in minutes or hours and relates to how long it takes to burn through a given material. Expressions.
Heavy Timber Materials and Methods. What is Heavy Timber Type 4 Construction Heavy timber also referred to as Mill construction or slow burning construction.
CEA UNIT 3 TERMS & DEFINITIONS. BEAM A structural member, usually horizontal, that carries a load that is applied transverse to its length.
High-Rise Hotels New Codes General Fire Safety Information Ted Erb Fire Prevention Officer Bellevue Fire Department April
Should the Commissioners Adopt A Code Enforcement Program for Missoula County?
Oklahoma Uniform Building Code Commission IRC Building Subcommittee Presentation to Commission November 17, 2010.
BREAKOUT SESSION 1 Parking 1. Discussion Topics 1. Parking violations – 1993 revision of parking infractions to admin. offenses 2. Vehicle Code section.
DCC FIRE SCIENCE PROGRAM ver. 12/14/09 NYS TRUSS IDENTIFICATION LAW..so that firefighters may be aware of the presence of any trusses.
Massachusetts Department of Public Health Bureau of Environmental Health Heating Systems and Enforcement of the Housing Code (In conjunction with the Department.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Implementing Rain Water Harvesting into Building Construction in VA Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development.
Dangers of Engineered Wood “I”-Beam Floors Make Everyday a Training Day…So that Everyone Goes Home c NFFF Firefighter Life Safety Resource Kit.
Fire and Emergency Services Company Officer — Lesson 17 Fire and Emergency Services Company Officer, 4 th Edition Chapter 17 — Preincident Planning.
Occupancy Classification Under NFPA 13 Examine the proposed facility and make recommendation on the Occupancy Classification Used to classify fuel loads.
1 Canadian Fire Alarm Association The Perspective from a Municipal Building Department Wednesday May 5, 2010 Presented by:Mike Seiling, CET, CBCO, Chief.
Fire-Related Properties of Materials Chapter 7. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
FORMS, SCAFFOLDING and STAGING
Fire Inspection and Code Enforcement, 7 th Edition Chapter 4 — Construction Types and Occupancy Classifications Inspector I.
Building Classifications: Construction Types.  Based on how the building is constructed.  Relates to:  Materials used  Combustibility  Fire-resistance.
Construction Type of Buildings
Presented by the Wood Truss Council of America
Introduction to OSHA (Part 1)
Sprinkler Loads on Trusses
Sprinkler Loads on Trusses Educational Presentation.
Inspection and Quality Assurance Requirements for Metal Plate Connected Wood Trusses Educational Overview.
Recommended Exterior Accessibility Directional Signage University of California, San Diego La Jolla Campus October 1, 2005 Transportation and Parking Services.
Dangers of Engineered Wood I-Beam Floors
Roofs primarily protect a structure and its contents from the effects of weather. 4–24–2 (Cont.)
Ontario Building and Fire Code Overview Presentation for the Downtown Revitalization Committee May 4, 2016 Jack Tosta, Chief Building Official Andrew McPherson,
6 MSDS Sheets and Hazard Communication.
Building Construction for the Fire Service
CITY OF HARARE EMERGENCY SERVICES
FRT Lumber Use in Type III-A Buildings
Bottom Chord Live Load Concurrency and Truss Design
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Why Know Building Construction
Revisions to Part 7 – Traffic Control for School Areas
Introduction to OSHA (Part 1)
NFPA 5000 Occupancy Classifications
Introduction to OSHA (Part 1)
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Essentials of Fire Fighting Chapter 4 — Building Construction
Wood Structures Topic 8 Quality Workmanship
Hello and welcome. I’m so glad you could join me today.
Building Construction
Introduction to Building Codes
Introduction to OSHA (Part 1)
Introduction to Building Codes
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Formatting a Workbook Part 1
NFPA 101 Occupancy Specific Requirements
EMPLOYEE “RIGHT –TO –KNOW” LAW
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Area of Refuge It’s the Law!
Truss Submittal Packages and Jobsite Packages
Introduction to OSHA (Part 1)
Prescribed Fire Permitting
City Council Meeting November 14, 2016
Contract Support Costs
General Rules of Interpretation (GRI) Part One
Two Minute Drill – Residential 3
Land Use 101: What is Zoning?
LOCAL POLICY INVENTORY
What We Do Hillphoenix, a leading industry innovator has dedicated the necessary resources to develop a new Walk-Ins Division. The result, Hillphoenix.
Presentation transcript:

NYS TRUSS IDENTIFICATION LAW ..so that firefighters may be aware of the presence of any trusses. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 NYS TRUSS SIGNAGE LAW Trusses are everywhere DCC FIRE SCIENCE PROGRAM ver. 12/14/09

Trusses And Fire Thus you have no way of knowing how long before it fails!!! They fail quickly when heated, in as little as 1-2 minutes! They fail without warning They don’t get “spongy” before failing so “sounding” a roof is of no help You have no idea how long the truss has been being heated from the fire when you arrive on the scene. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 TITLE 19 (NYCRR) CHAPTER XXXIII - STATE FIRE PREVENTION & BUILDING CODE COUNCIL SUBCHAPTER C - OTHER REGULATIONS DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 TRUSS IDENTIFICATION In recognition that truss assemblies can, have and will fail when exposed to fire conditions, the following has been enacted to provide a system to notify firefighters of important information about structures including the presence of trusses. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 The system is a very simple one but, like anything else, can only be effective if all firefighters are keenly aware of it and have a good understanding as to how to read and interpret it. Looking for this should be a standard part of every scene size up. The first one at an incident to see this sign should announce it’s presence and contents so that everybody is made aware of this vital information. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 Effective December 29, 2004 19 NYCRR Part 1264 PART 1264 - IDENTIFICATION OF BUILDINGS UTILIZING TRUSS TYPE CONSTRUCTION1264.1 Introduction . Section 382-a of the Executive Law provides that commercial and industrial buildings and structures that utilize truss type construction shall be marked by a sign or symbol that informs persons conducting fire control and other emergency operations of the existence of truss construction. Section 382-a further directs the State Fire Prevention and Building Code Council to promulgate rules and regulations it deems necessary to carry into effect the provisions of the statute. This Part establishes certain requirements pertaining to the identification of buildings and structures that utilize truss type construction. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 1264.3 Definition. For the purposes of this Part, truss type construction shall mean a fabricated structure of wood or steel, made up of a series of members connected at their ends to form a series of triangles to span a distance greater than would be possible with any of the individual members on their own. Truss type construction shall not include: (1) individual wind or seismic bracing components which form triangles when diagonally connected to the main structural system; and (2) structural components that utilize solid plate web members. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

1264.4 Identification of truss type construction a) Truss type construction shall be identified by a sign or signs in accordance with the provisions of this Part. (b) Signs shall be affixed where a building or a portion thereof is classified as Group A, B, E, F, H, I, M, or S occupancy, and in hotels and motels classified as Group R-1 or R-2 occupancy, in accordance with the provisions for the classification of buildings set forth in chapter 3 of the Building Code of New York State (see 19 NYCRR Part 1221). (c) Signs shall be provided in newly constructed buildings that utilize truss type construction and in existing buildings where an addition that extends or increases the floor area of the building utilizes truss type construction. Signs shall be affixed prior to the issuance of a certificate of occupancy or a certificate of compliance. Note; one or two family dwellings are not covered by this law nor is existing construction unless it has had an addition installed after the effective date. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 Abbreviated Summary A= Assembly B=Businesses E=Educational up through grade 12 F=Factory H-High Hazard=manufacturing/storage using materials with “high” physical or health hazards I=Institutional M=Mercantile (store) R=Residential S=Storage U=Misc. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 (d) Signs identifying the existence of truss construction shall consist of a circle 6 inches (152.4 mm) in diameter, with a stroke width of ½ inch (12.7 mm). The sign background shall be reflective white in color. The circle and contents shall be reflective red in color, conforming to Pantone matching system (PMS) #187. Where a sign is directly applied to a door or sidelight, it may be a permanent non-fading sticker or decal. Signs not directly applied to doors or sidelights shall be of sturdy, non-fading, weather resistant material. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 e) Signs identifying the existence of truss construction shall contain the roman alphanumeric designation of the construction type of the building, in accordance with the provisions for the classification of types of construction set forth in section 602 of the Building Code of New York State (see 19 NYCRR Part 1221), and an alphabetic designation for the structural components that are of truss construction, as follows: “F” shall mean floor framing, including girders and beams “R” shall mean roof framing “FR” shall mean floor and roof framing The construction type designation shall be placed at the twelve o’clock position over the structural component designation, which shall be placed at the six o’clock position. (f) Signs identifying the existence of truss construction shall be affixed in the locations specified in Table I-1264 DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

Type 3-Ordinary Construction Trusses in roof assembly B=Business (this info is extra- not required by the “law”) Type 3-Ordinary Construction Trusses in roof assembly The 'B' is because it is a Type IIIB building; these are the classifications the Uniform Code uses (IA, IB, IIA, IIB, IIIA, IIIB, IV, VA, VB), found in Table 302 of the Building Code of New York State. This is not required to be on this label but often is included. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 Unprotected steel: Expands at 1,000*f, Fails at 1,300*f DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 II=Unprotected steel R=Roof Trusses DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 The Law and the FD The “Law” makes this vital info available to you. Now it’s up to you and your department to use it. Enter this info into every pre-plan; the presence and/or absence of any trusses. It should be an SOP that the first firefighter who sees one of these signs at an incident announces this information on the radio so everybody becomes aware. Conduct “walk throughs” of these structures Conduct table top exercises so everybody knows how to deal with incidents in these (and all other) structures. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 1264.2 Enforcement. (a) Subdivision 4 of section 382-a of the Executive Law directs local governments to provide for enforcement of the statute. Enforcement of section 382-a of the Executive Law shall include enforcement of the provisions of this Part. A fee of fifty dollars shall be paid by the owner of a building with truss type construction to the authority having jurisdiction for enforcement of section 382-a of the Executive Law prior to the issuance of a building permit. (b) This Part shall not apply within a city with a population of one million or more persons. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 1264.3 Definition. For the purposes of this Part, truss type construction shall mean a fabricated structure of wood or steel, made up of a series of members connected at their ends to form a series of triangles to span a distance greater than would be possible with any of the individual members on their own. Truss type construction shall not include: (1) individual wind or seismic bracing components which form triangles when diagonally connected to the main structural system; and (2) structural components that utilize solid plate web members. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 THE GOOD PART IS. Now, any structure built or added on to after the effective date (12/29/04) that has any trusses in it, will be required to display this signage. This should make every firefighter aware of the presence of trusses. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 BUT……… The law is based on the weakest link. Example; a formerly Type I building gets an addition that features wooden structural members. That changes to entire structure to Type V. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 RECOMENDATION Use this signage like anything else; remember it but don’t take it as absolute gospel Make sure your pre-plans are always up to date Make sure all your personnel know how to read and use a pre-plan Use your pre-plans !! DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 Also remember.. It doesn’t apply to structures built before 12/29/04 unless they have an addition put onto them. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 To Access the Law: http://www.dos.state.ny.us/code/part1264.htm DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 The following slide shows a time lapsed series of pictures from a test burn on a wood truss. It failed exactly 5 minutes after the fire was ignited. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 http://faculty.sunydutchess.edu/walsh/videos/TRAINING%20CLIPS/trainingclips.htm Click on the hyperlink above and then click on the button labeled ”Truss Burn Demo” to see a truss fail under fire conditions. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

DCC FIRE SCIENCE PROGRAM ver. 12/14/09 The NYS “version” contains the building construction type. The system NIOSH recommends doesn’t. DCC FIRE SCIENCE PROGRAM ver. 12/14/09

Let’s See What You’ve Learned? DCC FIRE SCIENCE PROGRAM ver. 12/14/09

What is this telling you? I=Type 1 construction; Fire Resistive R=Trusses in Roof assembly I R DCC FIRE SCIENCE PROGRAM ver. 12/14/09

What is this telling you? IV=Heavy Timber FR=Trusses in floor & roof assemblies IV FR DCC FIRE SCIENCE PROGRAM ver. 12/14/09

What is this telling you? V=Type 5 construction; wood frame F-Trusses in floor assembly V F DCC FIRE SCIENCE PROGRAM ver. 12/14/09

Be Safe, Be Careful, Be Aware… THE END DCC FIRE SCIENCE PROGRAM ver. 12/14/09