Planning and BMPs for Large LUPs

Slides:



Advertisements
Similar presentations
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Key Requirements of the Construction General Permit
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Christine Krall, SW Region Environmental Winter 2015.
Module 7: Construction Phase
Old Policy – which no one ever seem to have heard of.
Introduction to Construction General Permit Inspections.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
What Do Inspectors Need To Know About BMPs? Tim Zimmerly, Terrill Lemke Los Alamos National Laboratory LA-UR
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mining Management Act Security
Erosion & Sediment Control. Wind Erosion Water Erosion.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
UNIT 13 – Monitoring & Compliance Monitoring and Compliance UNIT 13.
San Rafael, California November 12, 2015
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,

OPEN SPACE/ CONSERVATION
Restoration and Regulation Discussion
San Diego County Public Works –
MS4 and Trading Considerations
Supervisor, RIDEM RIPDES Permitting Program
Restoration and Regulation Discussion
SWPPP Basics.
Regulatory Perspective Statewide Construction General Permit
Experienced Inspectors' Workshop: Archaeology
Draft Transportation Element September 6, 2017
TPDES Construction Management at the City of Laredo
SEQRA as a Tool to Review Energy Projects
Van Wert, OH Water and Wastewater Element Training
Planning and BMPs for Capital Improvement Projects
Planning and BMPs for Capital Improvement Projects
INDOT Storm Water Management
Controlling Project Cost and Schedule
Environmental Commitments
What is Project Management?
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Construction Considerations
Prime Factors for Successful Preservation Treatments
Developing Risk Assessment and Writing Performance-Based Specifications Alaska Department of Transportation By Kurt S. Chirbas, PE Profile.
Dust Permits – ‘Process and Common Issues’ Craig Grismore - PCAQCD
Restoration and Regulation Discussion
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Fiber Reinforced Polymer Systems
Presentation transcript:

Planning and BMPs for Large LUPs Tanya Bilezikjian, P.E., QSD/P Michael Baker International Western Chapter IECA Construction Site Management Workshop October 2016

How Are Long Linear Projects Different from Traditional Projects? Projects are rarely 100% active at all times Projects may stretch dozens or even hundreds of miles Difficult to complete daily visual site inspections May have multiple contractors on different segments under one SWPPP May have multiple segments and multiple Risk Types Access roads may be difficult or dangerous to travel Project may cross multiple types of terrain Project may have multiple discharge points, hundreds of discrete disturbed areas, and many laydown yards 11/9/2018

Owner Considerations Assign QSD/P responsibility to the contractor or to a third party? Assign to contractor reduces amount of work for owner Assign to third party increases the amount of control for owner Both have potential significant cost and compliance implications How to bid the work? The more information in the bid package, the better Include the SWPPP with the bid package Write VERY clear specs and include language holding the contractor responsible until the NOT is approved Require line item bids per unit cost (e.g., per foot of silt fence, or per bag of bonded fiber matrix) Cost management is essential to find the balance between compliance and budget conservation Owner buy in is essential to project success The $2,000 SWPPP will not work for this type of project Owner must back the QSD and QSP 11/9/2018

QSD Considerations Stay involved throughout the project. Ensure clear understanding of all areas to be disturbed, particularly those not on the grading plans. Coordinate with biologists and other environmental teams working on the project. Consider each site as an individual project for overhead construction. For underground work, consider challenges of trenches and topography. Focus on reducing land disturbance and preserving existing vegetation. Determine final stabilization approach during SWPPP development using RUSLE2. Involvement – further scrutiny on QSDs, COIs may be needed as well as swppp amendments. May include laydown yards, major grading to achieve the final contours Need to understand how other permits affect site closeout bmps and schedule. Also, area restrictions for species habitat or nesting birds may limit ability to inspect, sample, or install bmps. The best bmp is nature. Keep as much natural veg as possible Clearly define final stabilization strategy in the SWPPP using RUSLE2. This is particular necessary if the site is remote and irrigation is not a possibility 11/9/2018

QSP Considerations Coordinate closely with the QSD, contractor, project owner, biologist, engineers and agencies Identify areas that can be closed out via COI as often as possible Thoroughly document pre-construction conditions Review the SWPPP, particularly construction BMPs, final stabilization BMPs, and schedule Educate the contractor on BMP maintenance, preservation of vegetation, BMP installation Ensure yards are maintained and kept neat Daily site inspections are difficult to achieve on a long linear project Sampling may be difficult or unsafe during rain events if access roads are unpaved or steep. Document everything! 11/9/2018

Project Closeout Coordinate with restoration team SWPPP final stabilization may not work with habitat restoration plan Coordinate with Regional Board Discuss closeout and final stabilization plans in relation to restoration to gain buy in Invite to the site to demonstrate level of effort Ensure contractor is aware of seasonal limits on seeding – do not hydroseed between February and October Verify RUSLE2 calculations for final stabilization 11/9/2018

Challenges During Construction Access roads Access to sampling locations Road washout/safety due to rainfall/bad drainage design Birds and other critters Access restrictions and need for monitor to accompany Nesting birds Timing Rainy season starts just as nesting season ends Fire danger may close project sites 11/9/2018

Challenges During Construction Contractor pushback Project team culture Communication Commitment to SWPPP implementation and compliance Lack of owner support Vegetation establishment Seasonal seeding, poor soils, lack of water, poor weather, overcompaction Slow or poor regulatory coordination COIs must be approved before next COI can be submitted RB may distrust project or owner, need to establish good relationship Unanticipated issues 11/9/2018

Questions? Wrap Up and Questions Long linear projects have a lot of unique elements to consider All can be addressed, with good planning and dedication CGP Review Issue #3 addresses much of this topic http://www.waterboards.ca.gov/water_issues/programs/stormwater/docs/training/cgp_review_issue3.pdf Questions? Tanya Bilezikjian, P.E., QSD/P, Trainer of Record tanyab@mbakerintl.com Michael Baker International 11/9/2018