Lee County Government Division of Natural Resources

Slides:



Advertisements
Similar presentations
THE DISTRICT’S ANACOSTIA RIVER TRASH TMDL IMPLEMENTATION STRATEGY
Advertisements

Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
Imperial River: Water Quality Status and Basin Management Action Plan.
The South Florida Watershed
Lee County Government Division of Natural Resources TMDL/BMAP Update TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
Introduction to TMDLs for Nutrients Presented by: Dr. Scott Emery January 15, 2009.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Florida Department of Environmental Protection Watershed Assessment 2015 Strategic Monitoring in the Florida Keys DEAR- Water Quality Assessment Program.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Florida Army National Guard CFMO-ENV Conservation.
Karen Bickford, TMDL Coordinator
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Total Maximum Daily Load (TMDL) Program Status Update and Needs Assessment Presented by the Environmental Protection Division March 18, 2008.
FLORIDA Unit 2. Panhandle Region North Florida West/Gulf Coast East/Atlant ic Coast South Florida Florida Keys Regions of Florida.
Holly Greening Executive Director Tampa Bay Estuary Program October 13, 2008 Holly Greening Executive Director Tampa Bay Estuary Program October 13, 2008.
Tampa Bay Nitrogen Management Consortium Update Holly Greening Tampa Bay Estuary Program March 2014.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Lake Jesup BMAP Adoption Environmental Protection Division February 23, 2010.
Clifton Bell, P.E., P.G. Chesapeake Bay Modeling Perspectives for the Regulated Community.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
St. Johns County Water Quality Program Update March 15,
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
The road ahead... Maximizing the benefits of maintenance efforts from a regulatory and fiscal perspective.
John Huisman – NC DWQ NC Water Quality Commission – January 11, 2012 NC Environmental Management Commission – January 12,
Medical Cannabis Implementation Update
TMDL Implementation: Now What?
New York’s Chesapeake Bay WIP
YGRENEWORKS CLEAN ENERGY GREEN CORRIDOR
Team Organization. Team Organization Kimley-Horn Overview.
Travel Patterns & Fares
Request For Approval of Local Programs Implementing The JORDAN New Development Stormwater Rule & Delegation of Authority to the Director NC Water Quality.
Stormwater Management and MS4 Compliance
It’s The Final Countdown To The Mid-point Assessment:
Presented by: Bill Kreutzberger Jaime Robinson November 14, 2017
Dave Clark and Michael Kasch
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Regulatory Requirements Background
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Town of Melbourne Beach
MACo Winter Conference
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
City of Forest Lake MS4 Program
GIS Data Management for SHA’s Bay Restoration Program
Nutrient Management Permit Alternatives
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Anne Arundel County Maryland
A quick walk through of how the system will work
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Lake Erie HABs Workshop
Developing a Water Quality Trading Framework
Water Quality Trading Advisory Committee MDA Headquarters
AIF Florida Water Forum
A quick walk through of how the system will work
Maryland’s Phase III WIP Planning for 2025 and beyond
Water Quality Trading Advisory Committee MDA Headquarters
Upper Clark Fork Watershed Restoration and TMDLs
CONSERVATION 20/20 MANAGEMENT AND MANAGEMENT TRUST FUND OVERVIEW
Background Lee County has about 180,000 pounds of nitrogen to remove from the Tidal Caloosahatchee. There are limited locations near the stream outfalls.
Watershed Restoration, Chesapeake Bay
Stormwater Local Assistance Fund
Space Coast TPO State Road (S.R.) 528 Update
Central District overview and the 2016 Water Bill
Presentation transcript:

Lee County Government Division of Natural Resources TMDL/BMAP Update November 30, 2010 Roland Ottolini, Director Lee County Division of Natural Resources

Lee County Government Division of Natural Resources Many creeks and streams in Lee County have been designated Impaired Waters by either the FDEP or USEPA and by law will have Total Maximum Daily Loads (TMDLs) for each causative pollutant The FDEP has proceeded with adoption of TMDLs for Hendry Creek, Imperial River and the Tidal Caloosahatchee A Basin Management Action Plan (BMAP) is established for each to allocate pollutant reductions to each stakeholder and to demonstrate how compliance will be achieved Lee County is the major stakeholder as we hold the NPDES permit for stormwater discharges and WWTP. This permit will be amended to require projects and programs to fulfill these obligations, in 3 –five year cycles FDEP presented the initial allocations and pollutant reductions in a workshop held on September 21 and 22, 2010 Lee County and others have been given 60 days to review and comment

BMAP Process Allocation to Stakeholders Consideration of Existing Projects Development of New Projects Monitoring Plan BMAP Documentation

Hendry Creek Watershed Change in FDOT !! NEW map

Hendry Creek Total Loads

Hendry Creek TMDL Requirements TMDL Based on Reference Site Analysis is 0.74 mg/l TMDL Load Results Load at 0.74 mg/l = 35,302 lb/yr Reduction is 34,960 lb/yr

Background Load = Total Load from Natural Land Uses

Allocation by % of Non-Background Loading Non-Background Load at TMDL = TMDL Load – Background Load = 35,302 - 31,729 = 3,573 lb/yr

Hendry Creek Urban Land-use 1988-2004

Imperial River Watershed

Imperial River Total Loads

TMDL Requirements TMDL Based on Reference Site Analysis is 0.74 mg/l Calculate Load from Target Concentration Target Load: Load at 0.74 mg/l = 137,492 lbs/yr Reduction is 122,249 lbs/yr

Background Load = Total Load from Natural Land Uses

Allocation by % of Non-Background Loading Non-Background Load at TMDL = TMDL Load – Background Load = 137,492 - 137,492 = 0

Imperial River Urban Land-use 1988-2004

Caloosahatchee Estuary TMDL 3240A, 3240B, 3240C TMDL for Nutrients Causative Pollutant – Total Nitrogen (TN) Target : Seagrass light requirements in San Carlos Bay TMDL= 23% Reduction in Total Nitrogen (over the entire river basin)

Caloosahatchee BMAP Target TN load at Estuary – 9,085,817 lbs/yr Current Total Load at the Estuary – 11,799,762 lbs/yr Current Load from Tidal Portion - 2,063,723 lbs/yr Required Reduction – 2.71 million pounds Target TN load at Estuary – 9,085,817 lbs/yr

Summary of TMDL

Key Stakeholders - Tidal Caloosahatchee Basin Lee County Charlotte County City of Cape Coral City of Ft. Myers East County Water Control District Lucaya CDD FDOT FDACS

Background Load = Total Load from Natural Land Uses

Allocation by % of Non-Background Loading Non-Background Load at TMDL = TMDL Load – Background Load = 1,347,568 - 1,116,941 = 257,627

Areas of Urban BMPs

Difference in Land Uses

BMAP Project Credits Eligibility Dates for BMAP Load Reduction Credits are Based on the Data Period Preceding the TMDL Pounds reduced will be subtracted from the total allocation for those projects completed July 1, 2000 and later. Credit counts for treatment above and beyond permit requirements. Example 1 – BMP To Mitigate Construction Example 2 – Regional BMP Example 3 – Retrofit BMP

BMAP Project Credits Projects Must Be Operated and Properly Maintained as Permitted. Operation and Maintenance records may be Requested as Part of the Project Review Process. Projects Not Operated as Permitted, Including Older Projects Not Included for Specific Credit, Could Result in Additional Reduction Requirements by the Responsible Entity.

Potential Areas Where Projects May Be Best

Stakeholder Projects and Management Activities Regulations, Ordinances, and Guidelines Special Studies and Planning Efforts Streetsweeping Enhanced O&M Program Certain Agricultural BMPs Public Education and Outreach Efforts PROJECTS Structural BMPs Quantifiable Load Reductions Reductions Not Currently Quantified Restoration and WQ Improvement Projects Basic Stormwater Management Program Implementation

Preliminary Projects Eligible for Credit Structural BMPs (Wet Detention, Baffle Boxes, etc.) Source Controls (Street Sweeping, Education) Special Consideration: Conservation Land Purchases If Land Use Changed After Purchase Note – May be Exchange of Loading from Original Owner to New Owner

Lee County Government Division of Natural Resources Cost of Compliance Removing nutrients from polluted water is proving to be especially costly in urban areas, with costs of $200-$20,000 per pound of nitrogen removed per year. Costs to meet TMDLs in Lee County will be in the multi-millions. Land availability is a major implementation constraint in urban settings. Retrofitting of older urban areas can be very expensive. Most public owned lands are road rights of way and environmental land acquisitions in the headwaters. Technology offered thus far yields very little nutrient reduction efficiency, especially TN Ten Mile Canal Filter Marsh removes an average of 4700 lbs TN/year. This project was built on 10 acres of land already owned by Lee County at a cost of $3m. This yields a cost of $638 per lb TN removed per year, not including land. At this rate, compliance with the Hendry Creek TMDL will cost $22m to meet the required 35,000 lbs/ year load reduction. For the Tidal Caloosahatchee, $98m to remove 153.877 lbs TN! Local Governments in Florida with an established Storm Water Utility. Altamonte Springs, Atlantic Beach, Auburndale, Bay Harbor Island, Boca Raton, Boynton Beach, Brevard County, Cape Coral, Casselberry, Clearwater, Clermont, Cocoa, Cocoa Beach, Collier County, Coral Gables, Dade County, Daytona Beach, Deland, Delray Beach, Deltona, Dunedin, Edgewater, El Portal, Eustis, Fort Lauderdale, Fort Meade, Fort Myers, Fort Pierce, Gainesville, Golden Beach, Hallandale, Hialeah , Hialeah Gardens, Homestead, Hillsborough County, Holly Hill, Jacksonville Beach, Jupiter, Key Biscayne, Kissimmee, Lake Mary, Lake Worth, Largo, Leesburg, Leon County, Longwood, Margate, Medley, Miami, Miami Beach, Miami Shores, Miami Springs, Miami-Dade County, Miramar, Mount Dora, Naples, North Lauderdale, North Miami Beach, North Miami, Oakland Park, Ocala, Ocoee, Oldsmar, Opa-Locka, Orlando, Ormond Beach, Oviedo, Palm Bay, Plant City, Pompano Beach, Port Orange, Port St. Lucie, Safety Harbor, Sanford, Sarasota County, Satellite Beach, South Daytona, South Miami, St. Augustine, St. Petersburg, Sunrise, Surfside, Sweetwater, Tallahassee, Tamarac, Tampa, Tavares, Titusville, Venice, Volusia County, West Miami, West Palm Beach, Wilton Manors, Winter Garden, Winter Park, Winter Springs

Lee County Government Division of Natural Resources Questions Does the Dissolved Oxygen (DO) standard apply to our estuaries? Is Total Nitrogen (TN) the causative pollutant? The State has used a reference TN concentration of 0.74 mg/l for the TMDL allocation and load reduction analysis. How can this be achieved when the Event Mean Concentrations (EMCs) for all land uses are above this rate, including wetlands?

Lee County Government Division of Natural Resources Questions What is the purpose of establishing a regulatory concentration that is less than natural conditions loading? Are the loading projections realistic? How do they compare to actual field data? What technologies are available to reduce TN practically and cost effectively? In retrofit scenarios? Why should local governments and other stakeholders bear the entire burden of cleaning up developments that have been permitted and presumed in compliance with current water quality standards?

Lee County Government Division of Natural Resources Recommendations Realistic numbers representative of real problem Give us the technology necessary to succeed State should share the burden by taking the allocation of permitted projects or providing in-kind grants to implement projects to offset their impact State should support the inclusion of new co-applicants under the County’s NPDES MS4 permit for fair and equitable distribution of allocation State needs to adopt SW rules that meet the criteria